LR-N04-0109, February 2004 Monthly Operating Report for Hope Creek Generating Station
| ML040830652 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 03/10/2004 |
| From: | Hutton J Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N04-0109 | |
| Download: ML040830652 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAR 1 0 2004 LR-N04-01 09 (0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for February 2004 are being forwarded.
Sincerely, James A. Hutton Hope Creek Plant Manager Attachments C Distribution 11-, Z1
- 0 95-2168 REV. 7/99
-V ~
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 3/5/04 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period February 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month 696 1355 129880 696 1324 127281 0
0 0
715302 1332832 129072104 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 4 4
4 4
4 4-(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 3/5/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Hope Creek entered the month at approximately 62% due to the continuation of suppression testing and deep shallow rod swap. Power was restored to 100% on February 4.
- On February 7, power was reduced to approximately 84% for maintenance on a Reactor Feed Pump. Power was restored to 100% on February 10.
- At the end of the month, Hope Creek completed 43 days of continuous on-line operation.