PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 FEB 1 7 2004 LR-N04-0061 O PSEG NuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY. PERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKETNO. 50-311 In compliance with Section 6.9, Reporting Requirements fortke, Specifications, the operating statistics for Janua y'L004 'art-,beiUig forwarded.
Sincerely,
Sa ' Jrickeria M,,ne a
fl i;.
q
-niff.s' em lP ant M~anager,,R:t.A.'
a' I
I'
.j(.
.... 1 4.,
Attachments.
I I
X.,..
I,;
C Distribution
,I I'_1
- '1
(
J
..)
G.
)
i:.
~
" t-r 95-2168 REV. 7199
I.
-.--'x.
'V DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 2/10/04 F. Todd (856) 339-1316 Reporting Period January 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1116 Month Year-to-date Cumulative 744 744 128578 744 744 125057 0
0 0
842307 842307 128126894 UNIT SHUTDOWNS NO.
DATE J TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS)
(1)
SHUTUING COMMENT S=SCHEDULED DOWN THE
______j REACTOR(2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H-Other 1-Manual 2 - Manual Trip/Scram 3-Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 2/10/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Salem 2 entered the month at approximately 99% power.
- On January 16, Salem 2 reduced power to approximately 77% due to a planned line outage. Power was restored to approximately 99% on January 17 and remained there for the remainder of the month.
- At the end of the month, Salem 2 completed 65 days of continuous on-line operation.