PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 DEC 1 5 2003 LR-N03-051 9 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for November 2003 are being forwarded.
Sincerely, Salem Plant Manager Attachments C Distribution 95-2168 REV. 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 12/11/03 F. Todd (856) 339-1316 Reporting Period November 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 121 6674 127090 90 6611 123569 O
o 0
39190 7244369 126433344 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 11/01/03 S
630 Hrs.
C 4
Refuel Outage 11/27/03 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic TriplScram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
'UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 12/11/03 R. Ritzman (856) 339-1445 Summarv Of Monthly Operatinq Experience Salem 2 entered the month in a refueling outage and was placed back on-line on November 27.
At the end of the month, Salem 2 completed 3 days of continuous on-line operation.