LR-N03-0519, November 2003 Monthly Operating Report for Salem Unit 2

From kanterella
Jump to navigation Jump to search
November 2003 Monthly Operating Report for Salem Unit 2
ML033570218
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/15/2003
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0519
Download: ML033570218 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 DEC 1 5 2003 LR-N03-051 9 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for November 2003 are being forwarded.

Sincerely, Salem Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 12/11/03 F. Todd (856) 339-1316 Reporting Period November 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 121 6674 127090 90 6611 123569 O

o 0

39190 7244369 126433344 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 11/01/03 S

630 Hrs.

C 4

Refuel Outage 11/27/03 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic TriplScram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

'UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 12/11/03 R. Ritzman (856) 339-1445 Summarv Of Monthly Operatinq Experience Salem 2 entered the month in a refueling outage and was placed back on-line on November 27.

At the end of the month, Salem 2 completed 3 days of continuous on-line operation.