LR-N03-0393, August 2003 Monthly Operating Report for Salem Unit 1
| ML032671035 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/15/2003 |
| From: | Fricker C Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N03-0393 | |
| Download: ML032671035 (3) | |
Text
I PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 5 2003 LR-N03-0393 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for August 2003 are being forwarded.
Operations Director Attachments C Distribution 96-2168 REV. 7jgg
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 919/03 F. Todd (856) 339-1316 Reporting Period August 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 A.
Month Year-to-aate oumulative 732 5761 147949 686 5714 143265 0
0 0
747523 6211583 146115549 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 811103 F
58 hrs.
A 4
500kv 1-5 Breaker Failure 813103 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TraininglLicense Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 9/9/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience Salem I was offline at the beginning of the month.
The unit was placed online on August 3, reaching 100% reactor power on August 4.
At the end of the month, Salem 1 completed 28 days of continuous on-line operation.