LR-N03-0309, June 2003 Monthly Operating Report for Salem Unit 1
| ML032040184 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/11/2003 |
| From: | Waldinger L Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N03-0309 | |
| Download: ML032040184 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUL 1 1 2003 LR-N03-0309 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for June 2003 are being forwarded.
Sincerely, Attachments C Distribution 4
95-2168 REV. 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 7/8/03 F. Todd (856) 339-1316 Reporting Period June 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month 720 4343 buliit 146531 720 4343 141894 o
O 0
800200 4703574 144607540 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)
DOCKET NO.: 50-272 UNIT: Salem I DATE: 7/8/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Salem I started the month at approximately 100% power.
On June 14, power was reduced to approximately 79% due to a 500kv line outage. Power was returned to approximately 100% later that day.
On June 25, power was again reduced to approximately 79% due to a 500kv line outage. Power was returned to approximately 100% on June 26.
- At the end of the month, Salem 1 completed 229 days of continuous on-line operation.