LR-N03-0257, May 2003 Monthly Operating Report for Hope Creek
| ML031690367 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 06/11/2003 |
| From: | Waldinger L Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N03-0257 | |
| Download: ML031690367 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUN 1 1 2003 LR-N03-0257 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specffications, the operating statistics for May 2003 are being forwarded.
Sincerely, Operations Director Attachments C Distribution 95-2168 REV. 7199
-I
, :",g D---e
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 6/6103 F. Todd (856) 339-1316 Reporting Period May 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month 461 2777 123893 414 12644 121462 1° 0
389764 [2662431 123141122 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 5/1/03 S
329 C
4 Refueling outage (RF11) 5/14/03 4
5/14/03 S
I B
5 Turbine Overspeed Test
- Reactor Remained Critical (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restricton E - Operator TrainingLicense Examination F - Administrafive G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
I
DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 6/6/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatina Experience The unit entered the month in a refueling outage.
On May 14, the plant was placed back on-line, reaching approximately 100%
on May 19.
At the end of the month, Hope Creek completed 17 days of continuous on-line operation.