LR-N02-0396, October 2002 Monthly Operating Report for Hope Creek Generating Station
| ML023250399 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 11/13/2002 |
| From: | Garchow D Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N02-0396 | |
| Download: ML023250399 (3) | |
Text
PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 3 20O2 LR-N02-0396 O PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October 2002 are being forwarded.
Sincerely, D. F. Garchro Vice Presidye-(Operations RAR Attachments C Distribution 1/2 95-2168 REV 7/99 B
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 11/12/02 F. Todd (856) 339-1316 Reporting Period October 2002 I
OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Y ear-to-aaie koumuiaxive 745 7229 119651 745 7090 117355 0
0 0
776241 7266586 118902194 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- On October 26, power was reduced to approximately 62% for a Deep Shallow Rod Swap. During the Deep Shallow Rod Swap evolution, a tube leak in the "C" waterbox was repaired. Power was restored to approximately 100% on October
- 27.
- At the end of the month, Hope Creek completed 126 days of continuous on-line operation.