PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 1 5 2002 LR-N02-0189 o PSEG Nuclear LILC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for April 2002 are being forwarded.
Sincerely, D. F. Ghrchow Vice President - Operations RAR Attachments C Distribution 9
95-2168 REV. 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 05/10/02 F. Todd (856) 339-1316 Reporting Period April 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 96 2150 114863 96 2128 111466 0
0 0
100047 2336017 113157558 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 3 4/5/02 S
623 hrs.
C 2
Refuel Outage 4/30/02 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 05/10/02 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience
- Salem 2 began the month at 100% power.
- On April 4, during power reduction to begin the refueling outage, power was reduced from 92% to approximately 61% due to a 21 Steam Generator Feed Pump trip. The plant was shutdown later that day to begin the refueling outage.
- At the end of the month, Salem 2 was in the refueling outage.