LIC-03-0152, October 2003 Monthly Operating Report for Fort Calhoun Station

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Fort Calhoun Station
ML033290364
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/14/2003
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-03-0152
Download: ML033290364 (2)


Text

AW m

=

Ormha Public Power District 444 South 16th Street Aall Omaha NE 68102-2247 November 14, 2003 LIC-03-0152 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

October 2003 Monthly Operating Report (OR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for October 2003. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, c:

B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector

  • INPO Records Center 11-11" I

Employment iwith Equal Opportunity

LIC-03-0152 Attachment OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-285 Fort Calhoun Station November 9, 2003 E. P. Matzke (402) 533-6855 REPORT PERIOD:

October 2003 Design Electrical Rating (1\\

'e-Net):

478 Maximum Dependable Capacity (MNe-Net):

478 MONTI R-TO-DATF-CTUlJIATIVF Number of lours Reactor was Critical:

Number of lours Generator was On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (M1Vh):

45 6,162 213,404 20 6,137 212,065 1,159 2,839,140 91,855,170 UNIT SHUTDOWNS T

JpMlethod of Date J Fc Duration I

Shutting Cause & Corrective No.

(yy/min/dd)

F: Forced (Rrours)

Reaso__

Down Action Comments 1

03/09/12 S

725 C

4 JNone.

(1) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refucling D-Regulatory Restriction E-Operator TrainingfLicense Examination F-Administrative G-Operational Error (Explain)

Il-Other (Explain)

OPERATIONS SUIIARY (2) Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

The Fort Calhoun Station completed the twenty-first refueling outage On October 31, 2003 at 0403 AM.