r SAFEGUARDS INFORMATION NOMeC Prairie Island Nuclear Generating Plant Committed to Nuclear Excellnc by Nuclear Management Company, LLC MAY 2 7 2009 L-PI-05-045 EA-02-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282, 50-306 and 72-10 License Nos. DPR-42, DPR-60, and SNM-2506 Response to NRC Guidance Regarding Mitigation Strategies The Nuclear Regulatory Commission (NRC) issued Orders for Interim Safeguards and Security Compensatory Measures (Order EA-02-026 or ICM Order) dated February 25, 2002, for the Prairie Island Nuclear Generating Plant.
Order EA-02-026 imposed requirements on nuclear power plants licensed pursuant to the Atomic Energy Act of 1954 and Title 10 of the Code of Federal Regulations.
Section III.A of the Order required licensees to implement certain changes in physical security plans and safeguards contingency plans on an interim basis until final requirements were established. Among other requirements, Nuclear Management Company, LLC (NMC) was required to complete implementation of the requirements of Section lI.B.5.b of Order EA-02-026 by August 31, 2002.
Subsequently, the NRC issued Orders, dated April 29, 2003, "Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors" (Order EA-03-086, or DBT Order) and other security-related Orders (collectively Orders) for the Prairie Island Nuclear Generating Plant. In many ways, Order EA-03-086 complemented or superseded requirements the interim measures imposed by Order EA-02-026.
As required by Order EA-03-086, the plans for the above licensed facility have been implemented. Subsequently, NMC was requested to respond to your letter dated February 25, 2005, "NRC Staff Guidance for Use in Achieving Satisfactory NOTE: ENCLOSURE I TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION 1717 Wakonade Drive East
- Welch. Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 Compliance with February 25, 2002, Order Section B.5.b," (NRC B.5.b Guidance) by May 31, 2005, and to implement appropriate enhancement to current mitigation strategies by August 31, 2005. Specifically, nuclear power plant licensees were requested by Enclosure 2, "Developing Mitigating Strategies/Guidance for Nuclear Power Plants to Respond to Loss of Large Areas of the Plant in Accordance with B.5.b of the February 25, 2002, Order," dated February 24, 2005, (NRC B.5.b Guidance) to the February 25, 2005 letter, to review the Areas of Consideration delineated in Attachment A to that Enclosure and evaluate additional considerations for potential inclusion in the licensees' mitigating strategies that licensees deemed appropriate in accordance to Attachment B to that Enclosure.
Subsequently, the Nuclear Energy Institute (NEI), in conjunction with the NEI Security Working Group, developed and issued guidance for licensee use (NEI Guidance) to assist licensees in responding to the February 25, 2005, letter.
As requested in the February 25, 2005, letter, NMC has reviewed the information in Attachments A and B in accordance with the NEI Guidance, and is submitting, as a Safeguards Information enclosure to this letter (Enclosure 1), NMC's evaluation of the information the NRC provided. Enclosure I reflects the results of a comprehensive and thorough review of the guidance and describes the considerations that NMC either has already or intends to implement at the Prairie Island Nuclear Generating Plant by August 31, 2005.
The primary guiding principles in the conduct of this evaluation were (1) whether or not equipment and resources were "readily available," and (2) if equipment is readily available, can it be effectively utilized in a licensee's mitigating strategy. NMC considered "readily available" to mean that the equipment or resources was already licensee owned, under contract, or part of an existing Memorandum of Understanding.
Further, even if equipment and resources are readily available, the second criterion is to ensure that the equipment can be used in a mitigating strategy in an effective manner.
Even if the equipment is readily'available, it is of no value if it cannot be effective in implementing the mitigating strategy.
In accordance with these principles, mitigating strategies are being implemented to address the NRC B.5.b Guidance. These actions are considered to be commitments for that purpose and will be managed in accordance with Prairie Island Nuclear Generating Plant's commitment management system.
Document Control Desk Page 3 to this letter is the schedule that NMC has developed regarding the implementation of commitments resulting from the evaluations documented in.
Jose h M. Sol oss Site *ce President, ra ne land Nuclear Generating Plant ar Management mpany, LLC Enclosures (2)