2807 West County Road 75 Monticello, MN 55362 800.895.4999 xcelenergy.com November 22, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 (l Xcel Energy*
RES P 0 N S I B L E BY NAT U REt>
L-MT-16-067 RIS 2016-09 NRC Regulatory Issue Summary 2016 Preparation and Scheduling of Operator Licensing Examinations As requested by Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations", dated June 16, 2016, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2018 through 2021, for the Monticello Nuclear Generating Plant (MNGP). Enclosed is the corresponding NRC Form 536, which provides the estimated number of applicants to be tested and proposed primary and alternate dates for the examinations.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
~%~
Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC
ENCLOSURE Operator Licensing Examination Data For the Monticello Nuclear Generating Plant (MNGP) 1 page follows
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 (05-2016)
~nAEou.t Estimated burden per response to comply with !his voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- ~~
OPERA TOR LICENSING Information collection is used to plan budgets and resources for operator examinations.
Send comments reg&ding burden estimate to !he FOIA, Privacy, and Information Collections Branch (T-5
~
~
EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to 1:
lnfocollec!s.Resource@nrc.gov, and to !he Desk Officer, Office of Information and Regulatory Affairs,
~
'?+.
ol NEOB-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503.
If a means
~.. **"'"..
used to impose an information collection does not display a currently valid OMB control number, !he NRC may not conduct or sponsor, and a person Is no! required to respond to, !he information collection.
FACILITY NRC REGION Monticello Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 NUMBER OF REACTOR 7
0 5
0 OPERATORS NUMBER OF SENIOR REACTOR 8
0 6
0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2
0 1
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/22/2018 11/02/2020 ALTERNATE DATE 10/29/2018 11/09/2020
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 13 0
0 0
CANDIDATES NRC FORM 536 (05-2016)