L-83-128, Informs That Discussion Topics for Evaluation of Control Room Habitability Per post-TMI Requirements Expected by 830831.Completion of Mods Expected by 830701
| ML20071E377 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/07/1983 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| L-83-128, NUDOCS 8303140204 | |
| Download: ML20071E377 (1) | |
Text
P. O. BOX 14000, JUNO BE ACH, F L 33408 FLORIDA POWER & LIGHT COMPANY, March 7,1983 L-83-128 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch # l Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Varga:
Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 Post-TMI Requirements Control Room Habitability Your letter of January 6,1983 concerning Control Room Habitability stated that you were unable to determine the acceptability of our proposed control room design based on the information provided and re' uested additional information.
Our q
architect-engineer has been requested to evaluate your concerns as described in the enclosure to your letter, it is expected that this evaluation will be completed on a schedule consistent with a submittal to you on or before August 31, 1983. This submittal will consist of one of the following:
1.
Justification for our control room as it :s currently designed; 2.
Proposed design rnodification to resolve your concerns; 3.
A combination of I and 2 above.
Please note that we are expecting to complete the Control Room Habitability modifications previously committed to by July 1,1983.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems & Technology gAl>
REU/PKG/ cab cc:
J. P. O'Reilly, Region 11 Harold F. Reis, Esquire PNS-LI-83-168-1 8303140204 830307 PDR ADOCK 05000250 P
PDR PEOPLE.. SERVING PEOPLE
_