U.So NUCI EAR RKGULATORVCOMMISSION NRC FoRM 195 IE.TeI NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER as I FILE NUMBER TOI Mr Victor Stello FROM:

Florida Power

& Light Co>>

Miami, Florida Robert E

Uhri DATE OF DOCUMENT 7/26/77 DATE RECEIVED 8177 RELETTER EORIGINAl Qcot v DESCRIPTION QAOTO8 I2 E D

~ NCLASS IFI ED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED S 4/Swan~

Oo NOT REMOVE License No DPR-31

& 41 Appl for Amend:

tech specs proposed change concerning the updating of Specification 3'

to be consistent with the "as-built" 125 v DC system as described in FSAR Section 8'

(Rev 32.& 33) ~ ~ >>>>notorized 7/29/77 ~ ~ ~ ~

<X~IINSIIH PLAVZ NAME. Turkey Point, Units 3'

4 RJL 8/2/77 (1-P)

(3-P)

FOR ACTION/INFORMATION ENVIRHNMENTAL MANAGER:

EN A SX TANT:

INTERNALD ASSIGNED AD.

V>>

~L.

RE LTR BRANCH CHIEF PROJECT MANAGER:

LICENSING ASSISTANT:

B>> HARLESS RlBUTION PLANT SYSTEMS TEDESCO BENAROYA SITE SAFETY &,

ENVIRON ANALYSI'S DENTON & MULLER ENGINEERVilG IPPOLITO P

N REACTORS BPfIRO TECH ERNST BALLARD 0

CHECK ERG EXTERNALDISTRIBUTION GAKfXLL 2

SITE ANALYSIS VOLLMR BUNCH J ~ COLLINS CONTROL NUMBF R NSIC 1V J

HANCHETT 16 CYS ACRS SENT CATEGO Y NRc FoRM 19d 12 Te) 77>~gaze<

P. O. BOX 013100, MIAMI, FL 33101 Director of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555 FLORIDAPOWER & LIGHTCOMPANY July 26, 1977 L-77-234

Dear Mr. Stello:

PegMuat~oq

~Q-Q'e:

Turkey Point Units 3 and Docket Nos.

50-250 and

-251 Proposed Amendment to Y

0 eratin Licenses DPR-31 and DPR-41 Xn accordance with 10 CFR 50.30, Florida Power 6 Light Com any submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.

The proposed changes update Specification 3.7 to be consistent with the "as-built" 125 v DC system as described in FSAR Section 8.2 (Rev.

32 and 33).

The changes are described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.

The safety evaluation of this change was submitted as revisions 32 and 33 to the Turkey Point FSAR.

Pa e 3.7-1 Paragraph l.e has been revised to reflect the added batteries and battery chargers.

Pa e 83.7-1 The next to last paragraph has been revised to reflect "as-built" operating conditions.

The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 6 Light Company Nuclear Review Board.

They have concluded that it does not involve an unreviewed safety question.

Very truly yours, Robert E. Uhrig Vice President REU/MAS/cpc Attachment cc:

Mr. Norman C. Moseley, Region XI Robert Lowenstein, Esquire ZiqO269 PEOPLE... SERVING PEOPLE

STATE OF FLORIDA

)

)

COUNTY OF DADE

)

ss Robert E. Uhrig, being first duly sworn, deposes and says:

That he is a Vice President of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this day of NOTARY PU IC, zn and for th County of Dade, State of lorida hOTAAY FVBUC AT CF FLCFIJA a U4.

E MY Co!r.::..'SS'OW EXF:SEE l.AY S,

Ny commission expires:

soho

ignis

-r

33.7 EASES FOR I.&fXTIFG CONDITION FOR OPERATION, ELECTRICAL SYSTEMS The electrical system can inactivate enough 480-volt equipment is equipment is supplied equipment is arranged so that no single contingency safety-features to j eopardize unit safety.

The supplied from 4 load centers and the 4160-volt from 2 busses for each nuclear unit.

Hultiple outside sources. supply power to the nuclear units.

The auxiliary

-equipment is'rranged electrica11y so that multiple items receive,thyir

..power from the two different sources.

-One outside source of power is required to give 'sufficient power to run zormal operating equip ent.'ne transmission line can supply all the muxiliary power.

One'239-4.16 kv start up transformer'an supply the

~uxiliazy'oads for its associated nuclear unit and emergency loads (HHA) for the"other nuclear unit The bus arrangements specified. for operation ensure that power is avail-(1) ab1e to an adequate number of safeguards auxiliaries-With additional switching, more equipment cou1d be out of service'wi,thout infringing on

, -safety.

.Each diesel generator has sufficient capacity to start and run the required

-engineered safeguards for a HEA, in one unit and safe shutdown of the second

~unit The minimum diesel fuel oil inventory at all times is maintained to assure the operation of either diesel'arrying 168 hour0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> rated load for

. seven days.

With 4'battery chargers in service, the batteries will.always be. at full

~

charge in anticipation of a loss-of-ac power incident.

.This ensures that (2) adequate dc power will be available for emergency use.

unit can be safely shutdown without the use of offsite power since all

~tal loads (safety systems, instruments etc.)

can be supplied from an

'mergency diesel generator.

Reference:

(1)

FSAR, Section 8.4 (2) FSAR, Section 8.2 B3.7-l

3-7 0

ELECTRICAL SYSTRfS h

operation of auxiliaries.

~Ob ective:

To define those conditions of electrical po~er availability necessary (1) to provide. for safe reactor operation, and (2) to provide for the continuing availability of engineered'afety features.

without:

a.

The associated, 239 KV-4160 volt start-up trans-b.

former in service.

4160-volt busses A and B of the. associated".unit, and either bus A or B of the. second unit, energized.

Co THBEE out of FOUR 480-volt load centers and 480-volt motor control centers A, B or C, and 9 of the associated unit energized, I

XRO diesel generators operable tMth on site supply of 40,000 gallons of fueZ. available.

e.

Four batteries and associated DC systems are operable.vith FOUR out. of SIX. bat tezy chargers operab1e.

2.

During pover operation or restarting from hot shutdown the follmring components may be inoperable:

a.

OliE start-up transformer may be out of service provided both diesel generators are operable.

The AEC shall be notified vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and be advised of plans to

~ restore the 'transformer. to service.

3.7<<1