energy harbor Terry J. Brown Site Vice President, Davis-Besse Nuclear June 22, 2022 L-22-153 Mr. John Giessner Regional Administrator, Region Ill United States Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Davis-Besse Nuclear Power Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 419-321-7676 Readiness for NRC Supplemental Inspection Required for a White Finding In Letter EA-21-155 dated March 1, 2022 (reference NRC Inspection Report No.
05000346/2021092), the NRC finalized the significance of a White finding for the Davis-Besse Nuclear Power Station (DBNPS) regarding an Emergency Diesel Generator (EDG) speed switch. As a result, the NRC assessed the DBNPS to continue to be in the Regulatory Response Column of the NRC's Action Matrix and identified that a supplemental NRC inspection will be performed for this issue. As requested by this Assessment Follow-Up Letter, this letter is to inform the NRC staff that the Energy Harbor Nuclear Corporation (Energy Harbor) is ready for the supplemental inspection at the DBNPS in accordance with NRC Inspection Procedure 95001.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Robert W. Oesterle, Manager, Site Regulatory Compliance and Emergency Response, at (419) 321-7462.
Sincerely, GMW cc: NRC Document Control Desk NRC Senior Resident Inspector NRR Project Manager Utility Radiological Safety Board