ML053260395
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 11/14/2005
From: Halnon G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3185, CEI/NRR-2903L, L-05-145
Download: ML053260395 (6)


Text

FENOC It 395 Ghent Road FirstEnergy Nuclear Operating Company Akron, Ohio 44333 November 14, 2005 BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Beaver Valley Power Station, Unit Nos. 1 and 2 Docket Nos. 50-334, 50-412 Davis-Besse Nuclear Power Station Docket Nos. 50-346, 72-14 Perry Nuclear Power Plant Docket No. 50-440

Subject:

Request for Revisions to Service Lists for the Beaver Valley Power Station, Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant Please update the service lists for the Beaver Valley Power Station, Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant at the Office of Nuclear Reactor Regulation (NRR) and at NRC Regions I and Ill. This request is being made as a result of recent organizational changes within the FirstEnergy Nuclear Operating Company (FENOC), and to standardize the distribution on the lists for the FENOC sites. The requested distribution lists are contained in Attachments 1, 2, and 3 (Requested FENOC Distribution for the NRC Service List for Beaver Valley Power Station, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant, respectively). There are no changes requested for non-FirstEnergy personnel or organizations., Commitment List, identifies that there are no commitments contained in this letter. If there are any questions concerning this request, please contact Mr. Gregory A. Dunn, Manager - Fleet Licensing, at (330) 315-7243.

Sincerely, G

anon Director, Fleet Regulatory Affairs tah

(

BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L Page 2 tah Attachments:

1. Requested FENOC Distribution for the NRC Service List for Beaver Valley Power Station, Unit Nos. 1 and 2
2. Requested FENOC Distribution for the NRC Service List for Davis-Besse Nuclear Power Station
3. Requested FENOC Distribution for the NRC Service List for Perry Nuclear Power Plant
4. Commitment List cc:

Samuel J. Collins, Regional Administrator, NRC Region I James L. Caldwell, Regional Administrator, NRC Region Ill Timothy G. Colburn, NRR Senior Project Manager William A. Macon, NRR Project Manager Paul C. Cataldo, NRC Senior Resident Inspector C. Scott Thomas, NRC Senior Resident Inspector Raymond J. Powell, NRC Senior Resident Inspector Utility Radiological Safety Board L. E. Ryan, BRP-DEP

BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L Page 1 of 1 Requested FENOC Distribution for the NRC Service Nos. 1 and 2 Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 List for Beaver Valley Power Station, Unit James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Lew W. Myers Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SGRP P.O. Box 4, Route 168 Shippingport, PA 15077 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333

BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L Page 1 of 1 Requested FENOC Distribution for the NRC Service List for Davis-Besse Nuclear Power Station Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333

BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L Page 1 of 1 Requested FENOC Distribution for the NRC Service List for Perry Nuclear Power Plant Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 L. W. Pearce Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Richard Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333

BV -

No. L-05-145 DB -

Serial Number 3185 PY -

CEI/NRR-2903L Page 1 of I COMMITMENT LIST The following list identifies those actions committed to by the FirstEnergy Nuclear Operating Company (FENOC) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only for information and are not regulatory commitments. Please notify Mr. Gregory A. Dunn, Manager - Fleet Licensing, at (330) 315-7243 of any questions regarding this document or any associated regulatory commitments.

COMMITMENT DUE DATE NONE NONE