L-03-080, Request for Regulatory Conference
| ML031320286 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/07/2003 |
| From: | Pearce L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-03-080 | |
| Download: ML031320286 (1) | |
Text
~~~~~~~~~~~~~~~~~~~~
Valley Power Station FENOC Route 168 P.O. Box4 FrstEnergy Nuclear Operating Company Shippingport. PA 15077-0004 L. William Pearce 724-682-5234 Site Vice President Fax: 724-643-8069 May 7, 2003 L-03-080 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Request for Regulatory Conference NRC Inspection Report 50-334/03-006 & 50-412/03-006 documented a preliminary white finding concerning the ability to ensure timely augmentation of the emergency response organization with 12 radiation protection technician positions.
FirstEnergy Nuclear Operating Company (FENOC) requests that a regulatory conference be held to provide the NRC with the results of our investigation of this issue, including the root cause, the corrective actions that are being taken and safety significance. A regulatory conference will be scheduled with Mr. Richard Conte.
No regulatory commitments are contained in this submittal. If you have any questions concerning this matter, please contact Mr. Larry R. Freeland, Manager, Regulatory Affairs/Performance Improvement at 724-682-5284.
Sincerely, L. William Pearce c:
Mr. T. G. Colburn, Senior Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. W. D. Lanning, Director, Division of Reactor Safety, Region I Mr. R. J. Conte, Chief, Operational Safety Branch, Region I Ab-D