JAFP-09-0133, Physical Security Plan, Revision 5

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Revision 5
ML093340327
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/20/2009
From: Joseph Pechacek
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-09-0133
Download: ML093340327 (2)


Text

SAFEGUARDS INFORMATION En tffgy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager November 20, 2009 JAFP-09-0133 United States Nuclear Regulatory Commission ATTN:

Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Physical Security Plan, Revision 5 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Dear Sir or Madam:

Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). This revision implements the work hours controls of 10 CFR 26 Subpart I.

In accordance with 10 CFR 50.4(b)(4), the revised Plan paragraphs and pages are enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.21 (e). Entergy therefore requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.

Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.

If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.

SAFEGUARDS INFORMATION and Enclosure 1 contain Safeguards Information. When separated from the attachment this letter is non-safeguards information.

UML SAFEGUARDS INFORMATION Entergy.

November 20, 2009 JAFP-09-0133

,United States Nuclear Regulatory Commission A TIN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Physical Security Plan, Revision 5 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Dear Sir or Madam:

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager Entergy has revised the James A. FitzPatrick Nuclear Power Plant Physical Security Plan (PSP) in accordance with 10 CFR 50.54(p)(2). This revision implements the work hours controls of 10 CFR 26 Subpart I.

In accordance with 10 CFR 50.4(b)(4), the revised Plan paragraphs and pages are enclosed with this letter (Attachment 1). contains Safeguards Information as defined in 10 CFR 73.21 (e). Entergy therefore requests that this attachment be withheld from public disclosure. Please inventory the contents of this letter and return the Document Receipt Form to Mr.

Jonathan LaPlante, Security Manager, James A. FitzPatrick Nuclear Power Plant.

If you have any questions or require additional information, please contact Mr. Jonathan LaPlante at (315) 349-6406.

SAFEGUARDS INFORMATION and Enclosure 1 contain Safeguards Information. When separated from the attachment this letter is non-safeguards information.

SAFEGUARDS INFORMATION JAFP-09-0133 Page 2 of 2 There are no new commitments contained in this letter.

Very trul Joseph Pechacek Licensing Manager : Summary of Revision 5 Changes to the Physical Security Plan and copy of revised pages.

cc:

Mr. Samuel Collins (with Attachment)

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)

Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S, Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Resident Inspector's Office U.S, Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 (without Attachment)

SAFEGUARDS INFORMATION and Enclosure 1 contain Safeguards Information. When separated from the attachment this letter is non-safeguards information.

SAFEGUARDS INFORMATION There are no new commitments contained in this letter.

Very tr'glDurs,

//{)"9?~

4e;r£J./6,

~o/{

Joseph Pechacek Licensing Manager JAFP-09-0133 Page 2 of 2 : Summary of Revision 5 Changes to the Physical Security Plan and copy of revised pages.

cc:

Mr. Samuel Collins (with Attachment)

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19404 Mr. Bhalchandra Vaidya, Project Manager (without Attachment)

Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Washington, DC 20555 Resident Inspector's Office (without Attachment)

U.S. Nuclear Regulator Commission P.O. Box 136 Lycoming, NY 13093 SAFEGUARDS INFORMATION and Enclosure 1 contain Safeguards I'nformation. When separated from the attachment this letter is non-safeguards information.