Forwards NRC Resident Ofc Status Rept for 871023-1105
ML20236M386
Person / Time
Site: Peach Bottom, 07100023  Constellation icon.png
Issue date: 11/09/1987
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8711130111
Download: ML20236M386 (4)


Text

m

,

.

,

'

.:

'

M,.

'

,

.a r

l 09 NOVi1987

+

'

Docket Nos.. 50-277'

l

]

'50-278.

'

MEMORANDUM FOR:

William F. 'Kane,: Director, Division of Reactor' Project's1

-

,

'FROM:

' J. C. Linville, Chief, Reactor' ProjectsiSection~ 2A'

,

. SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE'-

' PERIOD October 23 - November 5, 1987.-

-

Enclosed is the' Peach Bottom periodic status report from/the' NRC Resident-Office at Peach Bottom..Three.NRC. resident inspectors l monitored activ'ities.

at the plant during the report' period.

-

'

These status reports are intene'ed to provide NRC management and the public with

~

"

an overview of plant activities and-NRC inspection activities.

Subsequent ~

inspection reports will' address many of.these 'topicsLin:more detail.

~

'

Sign-James'C. Linville, Chief

Reactor Projects.Section PA'.

.j Enclosure: As. Stated

,

I

!

l

'!

i 0FFICIAL RECORD COPY:

PB'-STATUS / REPORT - 0001.0.0l

.

O'71'1130111 871109...

11/09/87 j

jor mocooggy Q l, p

,

m-

--

--

.

-

_-

'

-

E

Qhg iggy j

William F. Kane

l cc w/ encl:

l Dickinson M. Smith,. Manager, Peach Bottom-Atomic Power S'ation

t John S. Kemper, Senior Vice President, Engineering and Production I

Thomas S. Shaw, Jr., Vice President, Production

{

Troy B. Conner, Jr., Esquire i

d W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

.

l G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

'l Raymond L. Hovis,. Esquire

]

Thomas Magette, Power Plant. Siting, Nuclear Evaluations

,

W. M. Alden, Engineer in Charge,- Licensing Section Doris Poulson, Secretary of Harford County Council J

Public Document Reom (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector i

Commonwealth of Pennsylvania bec w/encis:

-

Region I Docket Room (with concurrences)

'

J. Taylor, EDO

'

T. Murley, NRR R. Starostecki, NRR F. Miraglia, NRR S. Varga, NRR 9. Boyer, NRR W. Butler, NRR R. Martin, NRR W. Rutsell, RI W. Johnston, RI T. Martin, RI

,

S. Collins, RI

!

R. Gallo, RI

!

K. Abraham, RI M. Miller, RI J. Williams, RI L. Scholl, RI l

i

RLDP l

.,,h, W. -, e,

11/O{/87 11M/87 0FFICIAL RECORD COPY PB STATUS REPORT - 0002.0.0 j

11/09/87

_ _ _. _ _

____ _

!

.

r

.

ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR'THE PERI'00-October 23 - November 5, 1987

1.0 Plant Status As of 8:00 a.m. on November 5,1987, Unit 2 and-3 are in a cold condition per the March 31, 1987,'NRC Order with coolant temperatures less than 200

-

degrees Fahrenheit. The Unit 3 core is completely off loaded.

!

2.0 Facility Operations Summary j

Unit 2 is completing a refueling outage which began March 13, 1987.

Final work is being performed to support the reactor pressure vessel

.

hydrostatic test.

Unit 3 has been in a cold condition per the March 31, I

1987, NRC Order since April 1, 1987.

The Unit 3 recirculation system l

pipe replacement outage is in progress. The Unit 3 core off load was d

completed on October 28, 1987.

In.adition, twenty-two control rod blades have been exchanged and twelve local power range monitor strings are currently being exchanged.

3.0 Items of Special Interest A public meeting was held on November 4, 1987, in Lancaster County, i

Pennsylvania, to receive public comments on the' Philadelphia Electric j

Company (PECo) Commitment to Excellence Action Plan.

Fourteen people

spoke to express their views on this Plan.

!

4.0 Other Items of Interest 4.1 The licensee has implemented the following shift operations organizational changes:- (1) J. Cotton assumed the duties-of Super-intendent, Operations on October 23;'and (2) the Shift Managers assumed the duties previously held by the Shift Superintendents effective 11:00 p.m. on October 25.

In addition, on October 23 the following announcements were made regarding the proposed PECo

'

corporate / plant reorganization:

(1) M. J. McCormick, Peach Bottom Plant Manager; and -(2) K. Powers Peach Bottom Project Manager.

,

4.2 On October 26, Unit 3 received a spurious triple low reactor water

)

level signal. A blocking permit hari been applied to a Yarway level j

-

indicating switch so that it could be replaced. 'After the permit

>

was applied, maintenance, personnel tried to dr?.in the water in the switch and went beyond the boundary of the permit.

Subsequently, i

the entire variable leg header was drained, causing the unplanned

'I triple low signal.

The only actions that occurred were a Unit 3 l

high pressure service water (HPSW) pump trip and a loss of shutdown j

cooling (SOC) at Unit 2.

Operators manually secured SDC on Unit 3

when the HPSW pump tripped. Operators restored SDC at tsoth units

within three minutes.

l OFFICIAL RECORD COPY PB STATUS REPORT - 0003.0.0 l

11/09/87 l- - - -- - = - --

_ _ - -

- - _ _

_

-

--

_ - - -. _ - - - _ _

- ___ j

,

.

'. :

!

-s i

4.3 LThe licensee's security organization conducted a search of the Peach-Bottom site from 3:00 a.m. to 6:00 a.m. on October 30, using five-

teams composed of trained drug dogs, handlers, Pennsylvania State Police, and PECo security representative.

The' search encompassed

!

areas both inside and outside the. Peach 6 : tom 2 & 3 protected areas. The search teams were complimented by forensic experts and

]

licensee site security and station. management.

No contraband was

found. The licensee's investigation.into alleged drug activities is q

continuing. All three NRC resident inspectors were on site and observed the search activities.

The resident' inspectors are following the licensee investigations and I

corrective actions'regarding these' occurrences.

,l 5.0 NRC Activities During the Period ll Three NRC Resident Inspectors were assigned to monitor plant activities I

between October 23 and November 5, 1987. These individuals consisted of the following:

Thomas P. Johnsor

- Senior Resident Inspector Richard J. Urban

- Resident Inspector Larry E. Myers

- Resident Inspector t

Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items, i

An inservice tdsting team inspection was perfonned at Peach Bottom by -

i region based inspectors complimented by an NRC headquarters individual-l and a contractor from November 2 --November 6, 1987.

{

Three region based inspectors were also on site the week of November 6.

One inspector was reviewing existing unresolved items, one inspector was i

reviewing recirculation pipe replacement activities, and one inspector was reviewing refueling cavity bellows seals.

The results of these inspections will be included in a future status-

,

report.

NRC Combined Inspection Report 50-277/87-18 and 50-278/87-18 was issued October 28, 1987.

The inspection was an Environmental Qualification (EQ)

Team inspection conducted June 15 - 19, 1987. A review was conducted concerning the EQ program for establishing and maintaining the qualifica-tion of electrical equipment important to safety within the scope of 10 CFR 50.49.

No violations were noted.

0FFICIAL RECORD COPY PB STATUS REPORT - 0004.0.0 11/09/87