m
,
.
,
'
.:
'
M,.
'
,
.a r
l 09 NOVi1987
+
'
Docket Nos.. 50-277'
l
]
'50-278.
'
MEMORANDUM FOR:
William F. 'Kane,: Director, Division of Reactor' Project's1
-
,
'FROM:
' J. C. Linville, Chief, Reactor' ProjectsiSection~ 2A'
,
. SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE'-
' PERIOD October 23 - November 5, 1987.-
-
Enclosed is the' Peach Bottom periodic status report from/the' NRC Resident-Office at Peach Bottom..Three.NRC. resident inspectors l monitored activ'ities.
at the plant during the report' period.
-
'
These status reports are intene'ed to provide NRC management and the public with
~
"
an overview of plant activities and-NRC inspection activities.
Subsequent ~
inspection reports will' address many of.these 'topicsLin:more detail.
~
'
Sign-James'C. Linville, Chief
Reactor Projects.Section PA'.
.j Enclosure: As. Stated
,
I
!
l
'!
i 0FFICIAL RECORD COPY:
PB'-STATUS / REPORT - 0001.0.0l
.
O'71'1130111 871109...
11/09/87 j
jor mocooggy Q l, p
,
m-
--
--
.
-
_-
'
-
E
Qhg iggy j
William F. Kane
l cc w/ encl:
l Dickinson M. Smith,. Manager, Peach Bottom-Atomic Power S'ation
t John S. Kemper, Senior Vice President, Engineering and Production I
Thomas S. Shaw, Jr., Vice President, Production
{
Troy B. Conner, Jr., Esquire i
d W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
.
l G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
'l Raymond L. Hovis,. Esquire
]
Thomas Magette, Power Plant. Siting, Nuclear Evaluations
,
W. M. Alden, Engineer in Charge,- Licensing Section Doris Poulson, Secretary of Harford County Council J
Public Document Reom (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector i
Commonwealth of Pennsylvania bec w/encis:
-
Region I Docket Room (with concurrences)
'
J. Taylor, EDO
'
T. Murley, NRR R. Starostecki, NRR F. Miraglia, NRR S. Varga, NRR 9. Boyer, NRR W. Butler, NRR R. Martin, NRR W. Rutsell, RI W. Johnston, RI T. Martin, RI
,
S. Collins, RI
!
R. Gallo, RI
!
K. Abraham, RI M. Miller, RI J. Williams, RI L. Scholl, RI l
i
RLDP l
.,,h, W. -, e,
11/O{/87 11M/87 0FFICIAL RECORD COPY PB STATUS REPORT - 0002.0.0 j
11/09/87
_ _ _. _ _
____ _
!
.
r
.
ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR'THE PERI'00-October 23 - November 5, 1987
1.0 Plant Status As of 8:00 a.m. on November 5,1987, Unit 2 and-3 are in a cold condition per the March 31, 1987,'NRC Order with coolant temperatures less than 200
-
degrees Fahrenheit. The Unit 3 core is completely off loaded.
!
2.0 Facility Operations Summary j
Unit 2 is completing a refueling outage which began March 13, 1987.
Final work is being performed to support the reactor pressure vessel
.
hydrostatic test.
Unit 3 has been in a cold condition per the March 31, I
1987, NRC Order since April 1, 1987.
The Unit 3 recirculation system l
pipe replacement outage is in progress. The Unit 3 core off load was d
completed on October 28, 1987.
In.adition, twenty-two control rod blades have been exchanged and twelve local power range monitor strings are currently being exchanged.
3.0 Items of Special Interest A public meeting was held on November 4, 1987, in Lancaster County, i
Pennsylvania, to receive public comments on the' Philadelphia Electric j
Company (PECo) Commitment to Excellence Action Plan.
Fourteen people
spoke to express their views on this Plan.
!
4.0 Other Items of Interest 4.1 The licensee has implemented the following shift operations organizational changes:- (1) J. Cotton assumed the duties-of Super-intendent, Operations on October 23;'and (2) the Shift Managers assumed the duties previously held by the Shift Superintendents effective 11:00 p.m. on October 25.
In addition, on October 23 the following announcements were made regarding the proposed PECo
'
corporate / plant reorganization:
(1) M. J. McCormick, Peach Bottom Plant Manager; and -(2) K. Powers Peach Bottom Project Manager.
,
4.2 On October 26, Unit 3 received a spurious triple low reactor water
)
level signal. A blocking permit hari been applied to a Yarway level j
-
indicating switch so that it could be replaced. 'After the permit
>
was applied, maintenance, personnel tried to dr?.in the water in the switch and went beyond the boundary of the permit.
Subsequently, i
the entire variable leg header was drained, causing the unplanned
'I triple low signal.
The only actions that occurred were a Unit 3 l
high pressure service water (HPSW) pump trip and a loss of shutdown j
cooling (SOC) at Unit 2.
Operators manually secured SDC on Unit 3
when the HPSW pump tripped. Operators restored SDC at tsoth units
within three minutes.
l OFFICIAL RECORD COPY PB STATUS REPORT - 0003.0.0 l
11/09/87 l- - - -- - = - --
_ _ - -
- - _ _
_
-
--
_ - - -. _ - - - _ _
- ___ j
,
.
'. :
!
-s i
4.3 LThe licensee's security organization conducted a search of the Peach-Bottom site from 3:00 a.m. to 6:00 a.m. on October 30, using five-
teams composed of trained drug dogs, handlers, Pennsylvania State Police, and PECo security representative.
The' search encompassed
!
areas both inside and outside the. Peach 6 : tom 2 & 3 protected areas. The search teams were complimented by forensic experts and
]
licensee site security and station. management.
No contraband was
found. The licensee's investigation.into alleged drug activities is q
continuing. All three NRC resident inspectors were on site and observed the search activities.
The resident' inspectors are following the licensee investigations and I
corrective actions'regarding these' occurrences.
,l 5.0 NRC Activities During the Period ll Three NRC Resident Inspectors were assigned to monitor plant activities I
between October 23 and November 5, 1987. These individuals consisted of the following:
Thomas P. Johnsor
- Senior Resident Inspector Richard J. Urban
- Resident Inspector Larry E. Myers
- Resident Inspector t
Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items, i
An inservice tdsting team inspection was perfonned at Peach Bottom by -
i region based inspectors complimented by an NRC headquarters individual-l and a contractor from November 2 --November 6, 1987.
{
Three region based inspectors were also on site the week of November 6.
One inspector was reviewing existing unresolved items, one inspector was i
reviewing recirculation pipe replacement activities, and one inspector was reviewing refueling cavity bellows seals.
The results of these inspections will be included in a future status-
,
report.
NRC Combined Inspection Report 50-277/87-18 and 50-278/87-18 was issued October 28, 1987.
The inspection was an Environmental Qualification (EQ)
Team inspection conducted June 15 - 19, 1987. A review was conducted concerning the EQ program for establishing and maintaining the qualifica-tion of electrical equipment important to safety within the scope of 10 CFR 50.49.
No violations were noted.
0FFICIAL RECORD COPY PB STATUS REPORT - 0004.0.0 11/09/87