IR 05000269/1986033

From kanterella
Jump to navigation Jump to search
Confirms 861222 Enforcement Conference W/Util in Region II Ofc to Discuss Findings Re Insp Repts 50-269/86-33, 50-270/86-33,50-287/86-33,50-269/86-16,50-270/86-16 & 50-287/86-16.Proposed Agenda Encl
ML20215C099
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/05/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8612150026
Preceding documents:
Download: ML20215C099 (2)


Text

,

._

_

_.

_

_

O(c

'*

,

N DEC 051986 0 e Power Company TN: Mr. H. B. Tucker.Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT: CONFIRMATION OF MEETING - OCONEE - DOCKET NOS. 50-269, 50-270, AND 50-287 This confirms the conversation between Mr. N. A. Rutherford of your staft, and Mr. T. A. Peebles of my staff, on November 26, 1986, concerning an enforcement-conference to be conducted at the Region II' 0ffice on December 22, 1986, at 10:00 a.m.

We requested.this meeting to discuss our findings relative to Inspection Reports 50-269/86-16, 50-270/86-16, 50-289/86-16, 50-269/86-33, 50-270/86-33 and 50-287/86-33. A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrar.gements, we will be pleased to discuss them.

Sincerely, C.7nL SIGNED BYi

).;ii!20l1CRACE J. Nelson Grace Regional Administrator

'

Enclosure:

Proposed Meeting Agenda c w/ encl:

i M. S. Tuckman, Station Manager b c w/ encl:

S idl. Nicolaras, NRR State of South Carolina denior Resident Inspector Document Control Desk

.Wls/oyth RII RII RII RII -

RII 06 urger:dm Tfe les VBroknlee Walker M nst

'

12/p/86 12/g /86 12/t/86 12/ 3 /86 2/3/86 8612150026 861205 gDR ADoCK0500g9 Il I

ZE4r I

_. -

.

.

-

,,

,

'

w

-

--

,

,

'

'

di

,

~

a j;; -

-

'

-

-

,

bs.i;;,

-

,

'

,

,

'

,2-

U

.j.

"

-

,

N

' -

.

ENCLOSURE

,

'

'

PROPOSED MEETING AGENDA

Duke Power. Company.

->

_

December.22, 1986,2-10:00 a.m.

'

,

I.-Opent_ng Remarks.

'R. D.-Walker:

P III.DbkeDiscussion:of-SafetySystem H. B. Tucker

_

Functional Inspection-(SSFI) Findings A.

Inadequate design and implementation DPC Staff.

of design (Unresolved items 14, 15, 17, and.18)

<

B.

Failure-to meet LCO action statement

.

' provisions for inoperable. equipment

.(Unresolved items 3,-12, and 13)

- C.

.Other. items:from SSFI'. report which

' Duke considers controversial

-

III.: Duke Discussion of Loss of.

-DPC Staff

. Circulating Water Siphon-IV. Closing Discussion-N. A. Rutherford

>V. C1osing domments R..D. Walker

_