Triennial Fire Protection Inspection Report 05000254/2022011 and 05000265/2022011
ML23006A061
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/06/2023
From: Richard Skokowski
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022011
Download: ML23006A061 (1)


Text

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000254/2022011 AND 05000265/2022011

Dear David Rhoades:

On December 15, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Drew Griffiths, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Richard A. Skokowski, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000254 and 05000265

License Numbers:

DPR-29 and DPR-30

Report Numbers:

05000254/2022011 and 05000265/2022011

Enterprise Identifier:

I-2022-011-0034

Licensee:

Constellation Nuclear

Facility:

Quad Cities Nuclear Power Station

Location:

Cordova, IL

Inspection Dates:

November 28, 2022 to December 15, 2022

Inspectors:

I. Hafeez, Senior Reactor Inspector

B. Jose, Senior Reactor Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Richard A. Skokowski, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) A and B diesel fire pumps and fire water distribution system
(2) Unit 1 emergency diesel generator (EDG) carbon dioxide (CO2) suppression system
(3) Unit 2 MO-2-1301-16 reactor core isolation cooling (RCIC) inboard steam isolation valve

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Combustible control program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved fire protection program (FPP) do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the updated final safety analysis report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire safe shutdown (SSD) operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) Engineering Change (EC) 618590 Evaluation of Unrated Barrier Between TB-1 and U2 TB Trackway Extension Storage Facility
(2) EC 368863 Justification for Lack of Detection and Fixed Suppression in Fire Zone

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On December 15, 2022, the inspectors presented the triennial fire protection inspection results to Drew Griffiths, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

QDC-4100-M-

0537

Quad Cities Design Basis Hydraulic Calculations

01/08/2020

Calculations

QDC-4100-M-

0691

Combustible Loading Calculation for Crib House

AR 00668567

Discrepancy in Fire Zone 8.2.10

09/06/2007

AR 04165168

Light Corrosion Observed during Fire Protection

Walkdown

08/17/2018

AR 04374594

Housekeeping Issue

10/05/2020

AR 04474552

Observed Fire Protection Non-Compliances

01/28/2022

AR 04484533

Housekeeping Issue in the U-1 Condensate Pit

03/13/2022

AR 04536223

C-Factor Test Complete SAT with an Incomplete Portion

11/10/2022

Corrective Action

Documents

AR01082089

Sprinkler Replacement-License Renewal Commitment

06/18/2010

AR 04539906

NRC FP ID: Procedure Clarification Needed

MA-QC-716-026-1001

11/30/2022

AR 04539934

NRC FP ID: Broken Robust Barriers

11/30/2022

AR 04541535

NRC FP ID: DFP Capacity Test Pump Curves and

Procedure Update

2/08/2022

Corrective Action

Documents

Resulting from

Inspection

AR 04543001

NRC FP ID-U1 EDG Day Tank Room Sprinkler Heads

2/15/2022

4E-1063

Electrical Installation Turbine Building Plan EL 595-0

Southeast

Rev. CS

4E-1350B

Schematic Diagram Diesel Generator No.1 Auxiliaries and

Start Relays

Rev. AM

4E-1595

Schematic Diagram Fire Protection Part 2 CO2 System

Rev. W

4E-1678D

Wiring and Schematic Drawing Reactor Building Essential

480V MCC 19-1

Rev. AF

4E-1841A

Wiring Diagram CO2 Fire Protection Equipment and

Cabinet 2212-47

Rev. AC

4E-2350B

Schematic Diagram Diesel Gen. 2 Auxiliaries and Start

Relays

Rev. AO

4E-2484E

Schematic Diagram RCIC System

W

71111.21N.05

Drawings

4E-6706B

Interconnection Block Fire Protection System Loops 6-3

and 6-4

Rev. W

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4E-6731E

Wiring Diagram Junction Box 1TB-21 and 2TB-218 Fire

Protection System

Rev. E

M-813

Diagram of Diesel Generator Room Ventilation

Rev. E

M-89

Diagram of Reactor Core Isolation Cooling (RCIC) Piping

618590

Fire Protection Engineering Evaluation of Unrated Barrier

Between TB-I and Unit 2 Turbine Building Trackway

Extension Storage Facility

EC 368863

GL 86-10 Evaluation Justification for Lack of Detection

and Fixed Suppression in Fire Zone 8.2.10

Rev. 0

Engineering

Changes

EC 390767

Multiple Spurious Operation Scenario 2-NEW-1

Evaluation for MO-2-1301-16

Miscellaneous

QCAN901

Fenwal Detectors

2/01/2008

OP-AA-201-009

Control of Transient Combustible Material

Procedures

QCTS 0850-05

Fire System "C" Factor Test

01348124-01

Sprinkler Replacement-License Renewal Commitment:

MM EWP

03/31/2018

01886437-01

Fire System "C" Factor Flow Test

08/18/2017

04893706-01

Fire System "C" Factor Flow Test

08/06/2020

04984556-01

Diesel Fire Pump "A" Capacity Test

05/04/2021

05005598-01

Diesel Fire Pump "B" Capacity Test

06/02/2021

05152931-01

(NEIL) Standby Diesel Generator Cardox Fire Protection

Functional Test

Rev. 1

05178652

Perform Walkdown of Unit 1/2 Fire Protection System

01/28/2022

Work Orders

234564

Perform Walkdown of Unit 1/2 Fire Protection System

07/29/2022