HNP-04-118, July 2004 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
July 2004 Monthly Operating Report for Shearon Harris
ML042230100
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/09/2004
From: Caves J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-04-118
Download: ML042230100 (3)


Text

6- & Progress Energy AUG 0 9 2004 SERIAL: HNP 1 18 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT MONTHLY OPERATING REPORT DOCKET NO. 50-400/LICENSE NO. NPF-63 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of July 2004.

Sincerely,

+". -

John R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGWImgw Enclosure c:

Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. C. P. Pate1 (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region 11)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P O Box 165 New Hill, NC 27562

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE Enclosure to Serial HNP 1 18 Page 1 of 2 OPERATING DATA REPORT 050-400 Shearon Harris Nuclear Power Plant August 2,2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD July 2004 (MontWear)

I. Design Electrical Rating:

(MWe-Net)

2. Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5. Unit Reserve Shutdown Hours:
6.

Net Electrical Energy (MWH):

YEAR TO MONTH DATE 941.7 NIA 900.0 NIA 744.0 4,806.4 744.0 4,797.6 0.0 0.0 674,118.0 4,387,118.0 CUMULATIVE NIA NIA 130,950.5 129,829.1 0.0 110,186,555.0

Enclosure to Serial HNP 1 18 Page 2 of 2 NO.

NIA DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE MEI'HOD OF

'I'YPE DATE F: FORCED DURATION SHUTTING CAUSEICORRECTIVE ACTIONS (yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS NIA NIA NIA N/A NIA NIA APPENDIX B UNIT SHUTDOWNS 050-400 Shearon Harris Nuclear Power Plant August 2,2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD July 2004 (MontWear)

SUMMARY

There were no plant shutdowns during the month of July 2004.

(1) Reason:

(2) Method:

1 - Manual 2 - Manual TripIScram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Traininaicense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)