6- & Progress Energy AUG 0 9 2004 SERIAL: HNP 1 18 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT MONTHLY OPERATING REPORT DOCKET NO. 50-400/LICENSE NO. NPF-63 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &
Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of July 2004.
Sincerely,
+". -
John R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGWImgw Enclosure c:
Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)
Mr. C. P. Pate1 (NRC Project Manager, HNP)
Dr. W. D. Travers (NRC Regional Administrator, Region 11)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P O Box 165 New Hill, NC 27562
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE Enclosure to Serial HNP 1 18 Page 1 of 2 OPERATING DATA REPORT 050-400 Shearon Harris Nuclear Power Plant August 2,2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD July 2004 (MontWear)
I. Design Electrical Rating:
(MWe-Net)
- 2. Maximum Dependable Capacity:
(MWe-Net)
- 3.
Number of Hours the Reactor Was Critical:
- 4.
Number of Hours the Generator Was On Line:
- 5. Unit Reserve Shutdown Hours:
- 6.
Net Electrical Energy (MWH):
YEAR TO MONTH DATE 941.7 NIA 900.0 NIA 744.0 4,806.4 744.0 4,797.6 0.0 0.0 674,118.0 4,387,118.0 CUMULATIVE NIA NIA 130,950.5 129,829.1 0.0 110,186,555.0
Enclosure to Serial HNP 1 18 Page 2 of 2 NO.
NIA DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE MEI'HOD OF
'I'YPE DATE F: FORCED DURATION SHUTTING CAUSEICORRECTIVE ACTIONS (yymmdd)
S: SCHEDULED (HOURS)
REASON (1)
DOWN (2)
COMMENTS NIA NIA NIA N/A NIA NIA APPENDIX B UNIT SHUTDOWNS 050-400 Shearon Harris Nuclear Power Plant August 2,2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD July 2004 (MontWear)
SUMMARY
- There were no plant shutdowns during the month of July 2004.
(1) Reason:
(2) Method:
1 - Manual 2 - Manual TripIScram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Traininaicense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)