GO2-97-188, Monthly Operating Rept for Sept 1997 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1997 for WNP-2
ML17292B085
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-188, NUDOCS 9710210283
Download: ML17292B085 (8)


Text

CATEGORY REGULAT INFORMATION DZSTRIBUTIO YSTEM (RIDE)

I ACCESSIOPI'NBR:9710210283 DOC.DATE: 97/09/30 NOTARIZED: NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,,Bi Washington Public Power Supply System SMITHFG.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1997 for WNP-2.W/971001 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR 1

ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL'ILE CENTER 01 0

EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 E

0' NOTE TO ALL "RIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

.l

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ Richland, Washington 99352-096S October 10, 1997 G02-97-188 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT SEPTEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of September 1997 as required'by Technical Specification 5.6.4.

~

I

~

IP I

IP)

Respectfully, G. O. Smit Plant General Manager Mail Drop 9270 cc:

EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston &Strawn INPO ANILibrary UtilityData Institute

" "'I"'""DLPWilliams-" BPA"/999' ".'""'

~

I "r- ~

In]~ '>>alP 'L>>>

i P

~"P,,

P P

~ +

~ ~

g P P'P,

~

4

~

/ ~

PPP PPJ ~ ~

4

~ ~ ~

0 r

P >i, g

)~P I be4PP W

P

~ ',

IP

~

I 'P IPP 9710210283 970930 PDR ADQCK 05000397 R

PDR llllllllllllllllllllllllllllllllllllllll

~e$

~\\

~ E'g

OPERATING STATUS REPORT for WNP-2 Date:

October 1, 1997 2.

3.

4.

5.

Docket:

50-397 Reporting Period: SEPTEMBER 1997 UtilityContact:

Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

1153 1153 6.

7.

8.

9.

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MwH)

MONTH 720.0 720.0 0.0 774,408 YEAR 4,163.7 4,039.9 1,081.3 3,743,212 CUMULATIVE 80,036.3 77,290.0 3,037.5 74,051,487 10.

Challenges to safety/relief valves:

None

f

S

UNITSHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: October 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:

SEPTEMBER 1997 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason (1)

Method (2)

Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

1 REASON A -

uipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Olher 2 METHOD 1 - Manua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other

~

~

~

+e

\\

e