ENWERGY NORTHWEST PO. Box 968

  • Richland, Washington 99352-0968 March 11, 2004 G02-04-034 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT FEBRUARY 2004

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of February 2004 as required by Technical Specification 5.6.4.

Respectfully, WS dxe fford Plant General Manager Mail Drop 927M Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: March 1, 2004

1.

Docket: 50-397

2.

Reporting Period: February 2004

3.

Utility

Contact:

Patricia Campbell (509) 377-4664

4.

Design Electrical Rating (Net MWe): 1153

5.

Maximum Dependable Capacity - summer (Net MWe): 1107

6.

Hours Reactor Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy (MWH)

MONTH 696.0 696.0 0.0 780,106 YEAR 1,440.0 1,440.0 0.0 1,578,812 CUMULATIVE 128,298.5 124,853.6 3,274.7 124,446,464

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: March 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 3774664 REPORT PERIOD: February, 2004 Type Method of Cause / Corrective Actions F: Forced Duration Sutn No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments NA

SUMMARY

Columbia Generating Station began and ended the month at full reactor power.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)