GO2-03-158, September 2003 Monthly Operating Report for Columbia

From kanterella
Jump to navigation Jump to search

September 2003 Monthly Operating Report for Columbia
ML032901037
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/08/2003
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-03-158
Download: ML032901037 (3)


Text

ENWERGY NORTHWEST PO. Box 968

  • Richland, Washington 99352-0968 October 8, 2003 G02-03-158 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT SEPTEMBER 2003

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of September 2003 as required by Technical Specification 5.6.4.

Res7 ectfully, General-Manager Mail Drop 927M Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399 leas

a o

OPERATING STATUS REPORT for Columbia Generating Station Date: October 1, 2003

1.

Docket: 50-397

2.

Reporting Period: September 2003

3.

Utility

Contact:

Patricia Campbell (509) 377-4664

4.

Design Electrical Rating (Net MWe): 1153

5.

Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH

6.

Hours Reactor Critical 720.0

7.

Hours Generator On-Line 720.0

8.

Unit Reserve Shutdown Hours 0.0

9.

Net Electrical Energy (MWH) 796,193 YEAR 4,954.0 4,833.1 0.0 5,159,766 CUMULATIVE 124,649.5 __

121,204.6 3,274.7 120,412,545

'6 f

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station 1

DATE: October 1, 2003 COMPLETED BY: P. Campbell I

TELEPHONE: (509) 377-4664 REPORT PERIOD: September, 2003 Type D

Method of Cause / Corrective Actions F: Forced IDurationSuting No.

Date S: Scheduled i (Hours)

Reason (1)

Dtn (2)

Comments

=

l I~~~~~~~~~~~~~~~~~~~~~~~~~~~~

l SUMIARY:

The plant began and ended the month at 100% power.

In June's 23 Report, the Refueling Outage Duration Hours (No.03-003) were-reported as 651.5 whereas it should have been reported as 641.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

During the Refueling Outage, the Generator was on-line for 9.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in order tog perform the turbine overspeed test.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H-Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)