GO2-03-146, August 2003 Monthly Operating Report for Columbia Generating Station
| ML032690924 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/11/2003 |
| From: | Oxenford W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-03-146 | |
| Download: ML032690924 (3) | |
Text
ENERGY NORTHWEST PO. Box 968 Richland, Washington 99352-0968 September 11, 2003 G02-03-146 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT AUGUST 2003
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of August 2003 as required by Technical Specification 5.6.4.
Respectfully, WS Oxenford Plant General Manager Mail Drop 927M cc:
TP Gwynn - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Shernan - BPA / 1399 rO4
OPERATING STATUS REPORT for Columbia Generating Station Date: September 1, 2003
- 1.
Docket: 50-397
- 2.
Reporting Period: August 2003
- 3.
Utility
Contact:
Patricia Campbell (509) 377-4664
- 4.
Design Electrical Rating (Net MWe): 1153
- 5.
Maximum Dependable Capacity - summer (Net MWe): 1107
- 6.
-Hours Reactor Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy (MWH)
MONTH 744.0 744.0 0.0 819,854 YEAR 4,234.0 4,113.1 0.0 4,363,574 CUMULATIVE 123,929.5 -
120,484.6 3,274.7 119,616,353
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:
Columbia Generating Station DATE: September 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: August, 2003 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments 1w
SUMMARY
The plant began and ended the month at 100% power.
(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
Licebse Examination F - Administiation G - Operatiolal Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain) li