GO2-02-090, April 2002 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
April 2002 Monthly Operating Report for Columbia Generating Station
ML021420433
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/15/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-090
Download: ML021420433 (3)


Text

ENERGY NORTHWEST PO. Box 968 m Richland, Washington 99352-0968 May 15, 2002 G02-02-090 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT APRIL 2002 Transmitted herewith is the Monthly Operating Report for the month of April 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Ox ail Drop 927M)

Plant General Manager Attachment cc:

E.W. Merschoff - NRC RIV J.S. Cushing - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date:

May 1, 2002 Docket: 50-397 Reporting Period: April 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 719.0 719.0 0.0 735,905 YEAR 2,663.8 2,647.5 0.0 2,881,813 CUMULATIVE 113,814.5 110,490.5 3,274.7 109,153,298

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107 None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: May 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: April, 2002

SUMMARY

The plant began and ended the month at full power operation.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments N/A