Text

-=:::=-Entergy GNRO-2008/00071 October 29,2008 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Entergy Operations, Inc.

Box 756 MS 39150 2800 Attention:

Subject:

Document Control Desk Inservice Inspection (lSI) Program Third 10-Year Interval, Revision 0 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Reference:

GNRO-2007/00057 Inservice Inspection (lSI) Program Third 10 Year Interval, Rev. 0, dated July 31, 2008 (ML082170373)

Dear Sir or Madam:

In accordance with the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-1400 (c), Entergy Operation, Inc. (Entergy) is enclosing an approved copy of the Grand Gulf (GGNS) Inservice Inspection (lSI) Program for the Third 10-Year Interval.

Entergy is providing the lSI Program Third 10-Year Interval for information only. Entergy is not requesting NRC approval of the program.

Pursuant to 10 CFR 50.55a(b)(3)(v), Entergy is also providing notification of the intent to use the ASME OM Code, 2001 Edition through 2003 Addenda, subsection ISTD in place of the requirements for snubbers in ASME Section XI, 2001 Edition through 2003 Addenda, IWF-5200(a) and (b) and IWF-5300(a) and (b). Code Case OMN-13 is approved by the NRC in NRC Regulatory Guide 1 192 (June 2003) and will be utilized in the snubber program this interval.

This letter provides a corrected Attachment 2 to the referenced letter (GNRO-2008/00057) dated July 31,2008. This letter had an incorrect attachment.

This letter contains no new commitments.

GNRO-2008/00071 Page 2 Should you have any question regarding this plan, please contact Roy C. James at (601) 437-6660.

Sincerely, M~

Acting-Manager Licensing

Attachment:

1. Inservice Inspection (lSI) Program Third 10-Year Interval, Revision 0, CEP-ISI-102 cc:

NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATIN: Mr. Elmo E. Collins, Jr. (w/2)

Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission ATIN: Mr. Carl F. Lyon, NRR/DORL (w/2)

ATTN: ADDRESSEE ONLY ATIN: Courier Delivery Only Mail Stop OWFN/8 B1 11555 Rockville Pike Rockville, MD 20852-2378

ATTACHMENT 1 to GNRO-2008/0071 Inservice Inspection (151) Program Third 10-Year Interval, Revision 0 CEP-151-102

Program Section No: CEP-ISI-102 Revision No.:

.-..0 Page No.:

1 of 44 PROGRAM SECTION FOR ASME SECTION XI, DIVISION 1 INSERVICE INSPECTION PROGRAM APPLICABLE SITES Specific Sites: ANO*1 D ANO*2 D GGNS [Z] IPEC D JAF 0 PLP 0 PNPS 0 RBS 0 VY 0 W3 0 HQN 0 Safety Related:

[Z]

Yes o

No

Program Section

Title:

Program Section No: CEP-ISI-102 Revision No.:

0~---

Page No.:

2 of 44 REVIEW AND CONCURRENCE SHEET "ASME Section XI, Division 1 Inservlce Inspection Program" Prepared By:

~

Date:

511.~/cjg Checked By:

f4i2 Date: sft~/ar ANII:

5"££ AN II KeVli.I,.J u~ IrJ D.,,~ ~J.w Reviewed By (or NA)

Date:

5'"It Ii/1. \\)v (

Concurred:

A~

"R.S.

~

8,.;t2-. LElt!fSDate:

Responsible Supervisor

Program Section No: CEP-ISI-102 Revision No.:

0~---

Page No.:

3 of 44 REVISION STATUS SHEET REVISION

SUMMARY

REVISION o

ISSUE DATE DESCRIPTION Initial Revision Issued For Use

Program Section No: CEP-ISI-102 Revision No.:

.::;.0 Page No.:

4 of 44 TABLE OF CONTENTS Section Description Page Number Cover Page 1

Review and Concurrence Sheet 2

Revision Status Sheet 3

Table of Contents 4

1.0 INTRODUCTION AND BACKGROUND

6 1.1 Introduction 6

1.2 Background

7 2.0 BAS'S FOR 'NSERVICE INSPECTION PROGRAM PLAN 7

2.1 Code of Federal Regulations Requirements 7

2.2 Augmented lSI Requirements 10 2.3 Risk-Informed lSI Program Plan 10 2.4 Methods of Examination and Personnel Qualification 16 2.5 Inspection Intervals and Inspection Scheduling 16 2.6 Component and Component Support Selection Criteria 20 2.7 Examination Evaluation Criteria 22 2.8 Records and Reports 28 Tables Table 2.5-1 GGNS Component/Component Support Scheduling 18 Figures Figure 2.5-1 GGNS 3rd Interval Schedule 19 3.0 INSERVICE INSPECTION PROGRAM PLAN DESCRIPTION 28 3.1 ASME Section XI Requirements 29 3.2 Later Editions and Addenda of ASME Section XI 32 3.3 ASME Section XI Code Cases Incorporated Into the 151 Program Plan 32 3.4 Requests For Relief and Requests For Alternatives from ASME Section XI Requirements 37 3.5 Augmented Examination Plans 40 3.6 Successive Inspections and Additional Examinations 43 3.7 Systems and Components Subject to Examination 43 3.8 Nonexempt ASME Class Components and Component Supports 43 3.9 Exempt ASME Class Components and Component Supports 43 3.10 151 Isometrics and lSI Equipment Drawings 44 3.11 Calibration Standards 44 3.12

\\ddea\\ 'S' Database 44

Program Section No: CEP-ISI-102 Revision No.:

0------

Page No.:

5 of 44 TABLE OF CONTENTS (Continued)

Section Description Page Number 3.13 Incomplete of Missing Examinations 45 Tables Table 3.3-1 Code Cases Incorporated Into the lSI Program 34 Table 3.4-1 Requests for Relief and Requests for Alternatives from ASME Section XI Requirements 38 Table 3.5-1 Augmented Examinations for External Commitments 41 Table 3.5-2 Owner Elected Examinations for Internal Commitments 41 Table 3.5-3 License Renewal Examinations for Aging Management Commitments42 APPENDICES Appendix A: GGNS lSI Drawing Index A-1 Appendix B: GGNS Augmented Examinations B-1 Appendix C: GGNS lSI Drawings C-1

Program Section No: CEP-ISI-102 Revision No.:

.;:.0 Page No.:

6 of 44

1.0 INTRODUCTION AND BACKGROUND

1.1 Introduction Implementation of an Inservice Inspection Program in accordance with the requirements of ASME Section XI, Division 1, is mandated by the United States Code of Federal Regulations, Title 10, Part 50, Section 55a (10CFR50.55a).

This Program Section contains the details of the ASME Section XI, Division 1, Inservice Inspection (lSI) Program for Grand Gulf Nuclear Station (GGNS).

GGNS is currently in the third 120-month Inservice Inspection Interval.

The coordination of refueling outages and periods within the current Inservice Inspection interval for GGNS is shown in Figure 2.5-1.

The scope of this Program Section indudes the inspection of C\\ass 1, 2, and 3 pressure retaining components and their supports. This Program Section also includes augmented inservice examinations that require NDE inspections and are maintained and implemented by the lSI Program. Other augmented examinations are maintained and implemented in independent programs due to their complexity, subject matter, or because the examinations are not related to the lSI Program.

Changes to the contents of this Program Section shall be performed in accordance with Nuclear Management Manual Procedure DC-174.

This inservice inspection plan is controlled by 10CFR50.55a.

The original and any changes that meet 10CFR50.55a do not require a Process Applicability Determination.

This Program Section does not include System Pressure Testing of Class 1, 2, and 3 pressure retaining components.

These requirements are contained in CEP-PT-001.

This Program Section does not include the requirements for the examination and testing of ASME Class CC and MC components and component supports. These requirements are contained in Program Section CEP-CISI-102.

The requirements for the repair and replacement of Class 1, 2, and 3 pressure retaining components and supports and ASME Class CC and MC components and component supports are contained in Program Section CEP-R&R-001.

Snubbers (pin-to-pin portion) will be examined and tested in accordance with plant Snubber Program.

Snubber support hardware such as lugs, bolting, pins and clamps between the snubber pins and component (or the snubber pin and the building structure) will be examined in accordance with Section XI, Subsection IWF, per this Program Section.

Program Section No: CEP-ISI-102 Revision No.:

Page No.:

7 of 44

1.2 Background

Grand Gulf Nuclear Station (GGNS)

Grand Gulf Nuclear Station nuclear steam supply system is a General Electric Boiling Water Reactor (BWR) 6 design.

Entergy obtained a Construction Permit to build GGNS on September 4, 1974.

After satisfactory plant construction and pre-operational testing was completed, Entergy was granted a full power operating license, NPF-29, on November 1, 1984, and subsequently commenced commercial operation on July 1, 1985. The NRC Docket Number assigned to GGNS is 050-00416.

The initial 120-month lSI Program commenced with commercial operation on July 1, 1985. However, by authorization from the Director of the Office of Nuclear Regu\\ation (Reference GNR\\ 96-00244) the first 120-month interval was extended until June 1, 1997. The second 120-month interval began on June 2, 1997 and was due to end on June 1, 2007, but was extended 12 months to May 31, 2008, as allowed by ASME Section XI, IWA-2430(d)(1).

In addition, extension of the second 120-month interval for Category B-J, C-F-1 and C-F-2 piping welds was requested by Entergy per Request for Alternative GG-ISI-003, see reference CNRO-2007-00009, and authorized by NRC Safety Evaluation in reference CNRI-2007-00004.

2.0 BASIS FOR INSERVICE INSPECTION PROGRAM PLAN The following text provides a listing and overview of the documents (Code of Federal Regulations, ASME Boiler and Pressure Vessel Codes, and Entergy documents) that form the basis of the lSI Program Plan. Specific implementation of the requirements in these documents is included in Section 3 of this Program Plan.

2.1 Code of Federal Regulations Requirements Code of Federal Regulations Final Rules that affect the lSI Program Update for GGNS include the 10CFR50.55a Final Rule published September 29, 2005 (70FR188). 70FR188 incorporated by reference ASME Section XI, 2001 Edition with 2003 Addenda in paragraph (b)(2).

70FR188 also removed the mandatory modification in 10CFR50.55a(b)(2)(xxi)(C) and was effective October 31, 2005.

Twenty-seven (27) limitations and modifications are included in 10CFR50.55a(b)(2) and are numbered (i) to (xxvii). In addition, one (1) limitation and modification is included in 10CFR50.55a(b)(3)(v) and in 10CFR50.55a(g)(4)(iii).

Each of these limitations and modifications was reviewed by Entergy personnel and implemented as discussed in Section 3.1.1.

Program Section No: CEP-ISI-102 Revision No.:

.;:;.0 Page No.:

8 of 44 2.1.1 Plant Classification Per 10CFR50.55a(g)(4), the specific components required to be included in an lSI Program per ASME Section XI are those components and component supports which are classified as ASME Code Class 1, 2, and

3. ASME Code Class is also discussed in IWA-1320, "Classifications".

Components subject to Section XI requirements are shown on the Inservice Inspection Boundary Drawings discussed in Section 3.8.

Pursuant to 10CFR50.55a, the inservice inspection requirements of ASME Section XI have been assigned to these components within the constraints of existing plant design.

In order to avoid confusion between ASME Code Class for design (typically ASME Section III) and ASME Code Class for inservice inspection (ASME Section XI), Entergy is utilizing lSI Class 1, 2, and 3 terminology for the application of ASME Section XI inservice inspection requirements.

Components considered to be optionally classified as ASME Code Class may be excluded from the Section XI lSI Program per IWA-1320(e).

Determination of the ASME Code Class (or equivalent to ASME Code Class for components not designed in accordance with ASME Section III requirements) GGNS was performed as follows:

The ASME Code Class of components was established in accordance with the system quality group classification in Regulatory Guide 1.26 and 10CFR50.55a, as discussed in UFSAR Section 3.2. Specific ASME Code Class requirements are included in UFSAR Table 3.2-1 and Table 3.2-2.

2.1.2 ASME Section XI Code of Record In accordance with 10CFR50.55a(g), Entergy is required to update the ASME Section XI (the Code) lSI Program for GGNS once every ten years.

The updated lSI Program is required to comply with the latest edition and addenda of the Code incorporated by reference in 10CFR50.55a one year prior to the start of the interval per 10CFR50.55a(g}(4}(ii}.

The interval dates for GGNS are discussed in Section 1.2 of this document.

Accordingly, based on "lock in" dates of May 31, 2007, the 2001 Edition with the 2003 Addenda of ASME Section XI is the version of Section XI that Entergy must meet for the current intervals at GGNS.

Note that based on 10CFR50.55a(b)(2) requirements, the 1989 Edition of Section XI is being implemented for IW8-1220; the 1995 Edition with 1997 Addenda of Section XI is being implemented for IWA-2240; the 1998 Edition with 2000 Addenda of Section XI is being implemented for Examination Category 8-0, Item Nos. 83.120 and 83.140; and the 2001 Edition of Section Xl is being implemented for Appendix VlII and

Program Section No: CEP-ISI-102 Revision No.:

.::;,.0 Page No.:

9 of 44 supplements to Appendix VIII and Article 1-3000.

See Section 3.1.1 for further details.

2.1.3 ASME Section XI Code Cases Per 10CFR50.55a(g), ASME Code Cases that have been determined to be suitable for use in lSI Program Plans by the NRC are listed in Regulatory Guide 1.147 "Inservice Inspection Code Case Acceptability-ASME Section XI, Division 1". The use of Code Cases (other than those listed in Regulatory Guide 1.147) may be authorized by the Director of the Office of Nuclear Reactor Regulation upon request pursuant to 10CFR50.55a(a)(3). The ASME Section XI Code Cases incorporated into the lSI Program Plan are controlled per Section 3.1.2.

2.1.4 Requests For Relief and Requests For Alternatives In cases where Entergy has determined that ASME Section XI requirements are impractical to implement or has determined that an alternative inspection approach to that specified in ASME Section XI is applicable, a 10CFR50.55a Request has been prepared and submitted to the NRC in accordance with 10CFR50.55a(a)(3)(i), 10CFR50.55a(a)(3)(ii) or 10CFR50.55a(g)(5), as applicable.

In cases where Entergy proposes alternatives to the ASME Section XI requirements that would provide an acceptable level of quality and safety, a Request for Alternative, as allowed by 10CFR50.55a(a)(3)(i) will be submitted to the NRC.

In cases where Entergy proposes alternatives to ASME Section XI when compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, a Request for Alternative as allowed by 10CFR50.55a(a)(3)(ii),

will be submitted to the NRC.

Per 10CFR50.55a paragraph (a)(3) Requests for Alternatives "...may be used when authorized by the Director of the Office of Nudear Reactor Regulation."

In cases where the ASME Section XI requirements for inservice inspection are considered impractical, Entergy will notify the NRC and submit information to support the determination, as required by 10CFR50.55a(g)(5)(iii). The submittal of this information will be referred to as a Request for Relief.

Per 10CFR50.55a paragraph (g)(6)(i), the Director of the Office of Nuclear Reactor Regulation will evaluate Requests for Relief per Paragraph (g)(5) and

"...may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in

Program Section No: CEP-ISI-102 Revision No.:

.;::;.0 Page No.:

10 of 44 the pUblic interest gIvIng due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility".

Requests for Relief and Requests for Alternatives for the current interval at each plant are included in Section 3.4.

2.2 Augmented lSI Requirements Augmented inservice inspection programs include examinations and tests that are in addition to those required by ASME Section XI.

2.2.1 Augmented Examination Types Augmented inspection requirements fall into two broad groups or types:

Examinations on components that are not normally subject to lSI per ASME Section XI (e.g., Reactor Coolant Pump Flywheel examination).

Supplemental examination requirements for components that are already subject to examination in accordance with ASME Section XI, but for which a non-ASME Section XI requirement such as examination volume, frequency, selection criteria or test method is mandated, recommended or desired.

Augmented inspection requirements may be in response to regulatory requirements, recommendations or requirements from Industry groups, or Entergy internal commitments.

2.3 Risk-Informed lSI Program Plan 2.3.1 GGNS has submitted a request for alternative to use the Risk-Informed lSI (RI-ISI) very similar to that contained in ASME Code Case N-716.

Otherwise known as the Risk-Informed I Safety-Based lSI Process. The request and any NRC correspondence is contained in Section 3.4.

2.3.2 RISK-INFORMED I SAFETY-BASED lSI PROCESS The process used to develop the RIS_B Program conformed to the methodology described in Code Case N-716 and consisted of the following steps:

Safety Significance Determination Failure Potential Assessment

Program Section No:

CEP-ISI-102 Revision No.:

0..;;:;;..----

Page No.:

11 of 44 Element and NDE Selection Risk Impact Assessment Implementation Program Feedback Loop 2.3.3 Safety Significance Determination The systems assessed in the RIS_S Program are provided in Table 3.1 of each plants template submittal. The piping and instrumentation diagrams and additional plant information including the existing plant lSI Program were used to define the piping system boundaries.

Per Code Case N-716 requirements, piping welds are assigned safety-significance categories, which are used to determine the treatment requirements.

High safety-significant (HSS) welds are determined in accordance with the requirements below.

Low safety-significant (LSS) welds include all other Class 2, 3, or Non-Class welds.

(1)

Class 1 portions of the reactor coolant pressure boundary (RCPS), except as provided in 10 CFR 50.55a(c)(2)(i) and (c)(2)(ii);

(2)

Applicable portions of the shutdown cooling pressure boundary function. That is, Class 1 and 2 welds of systems or portions of systems needed to utilize the normal shutdown cooling flow path either:

(a)

As part of the RCPS from the reactor pressure vessel (RPV) to the second isolation valve (Le., farthest from the RPV) capable of remote closure or to the containment penetration, whichever encompasses the larger number of welds; or (b)

Other systems or portions of systems from the RPV to the second isolation valve (Le., farthest from the RPV) capable of remote closure or to the containment penetration, whichever encompasses the larger number of welds; (3)

That portion of the Class 2 feedwater system [> 4 inch nominal pipe size (NPS)] of pressurized water reactors (PWRs) from the steam generator to the outer containment isolation valve; (4)

Piping within the break exclusion region (> NPS 4) for high-energy piping systems as defined by the Owner.

This may include Class 3 or Non-Class piping; and

Program Section No: CEP-ISI-102 Revision No.:

.;..0 Page No.:

12 of 44 (5)

Any piping segment whose contribution to Core Damage Frequency (CDF) is greater than 1E-06 (or 1E-07 for Large Early Release Frequency (LERF)) based upon a plant-specific PSA of pressure boundary failures (e.g.,

pipe whip, jet impingement, spray, inventory losses).

This may include Class 3 or Non-Class piping.

2.3.4 Failure Potential Assessment Failure potential estimates were generated utilizing industry failure history, plant-specific failure history, and other relevant information.

These failure estimates were determined using the guidance provided in EPRI TR-112657 (i.e., the EPRI RI-ISI methodology), with the exception of the deviation discussed below.

As described in section 2.3.3 above, CC N-716 augments the generic HSS welds with a search for plant-specific HSS welds based on the flooding analysis. The flooding analysis identifies areas that may be sensitive to floods (Le., potential HSS areas) and then evaluates the failure potential of piping segments in areas that are sensitive to flooding.

The failure frequencies used in the Entergy flooding studies were not based on Entergy plant specific data as there had not been significant flooding experience at Entergy.

As such, failure frequencies were obtained from various industry reports as defined in each plants template submittal.

A deviation to the EPRI RI-ISI methodology has been implemented in the failure potential assessment for each site. Table 3-16 of EPRI TR-112657 contains criteria for assessing the potential for thermal stratification,

cycling, and striping (TASCS).

These additional considerations for determining the potential for thermal fatigue as a result of the effects of TASCS provide an allowance for considering cycle severity.

The above criteria have previously been submitted by EPRI to the NRC for generic approval [letters dated February 28, 2001 and March 28, 2001, from P.J.

O'Regan (EPRI) to Dr. 8. Sheron (USNRC), Extension of Risk-Informed Inservice Inspection Methodology]. The methodology used in the Entergy RIS_8 applications for assessing TASCS potential conforms to these updated criteria. Final materials reliability program (MRP) guidance on the subject of TASCS will be incorporated into the RIS_8 applications, if warranted.

2.3.5 Element and NDE Selection Code Case N-716 provides criteria for identifying the number and location of required examinations. Ten percent of the HSS welds shall be selected for examination as follows:

Program Section No: CEP-ISI-102 Revision No.:

0.;;....----

Page No.:

13 of 44 (1)

Examinations shall be prorated equally among systems to the extent practical, and each system shall individually meet the following requirements:

(a)

A minimum of 250/0 of the population identified as susceptible to each degradation mechanism and degradation mechanism combination shall be selected.

(b)

If the examinations selected above exceed 10%

of the total number of HSS welds, the examinations may be reduced by prorating among each degradation mechanism and degradation mechanism combination, to the extent practical, such that at least 10% of the HSS population is inspected.

(c)

If the examinations selected above are not at least 10%

of the HSS weld population, additional welds shall be selected so that the total number selected for examination is at least 10%.

(2)

At least 10% of the RCPS welds shall be selected.

(3)

For the RCPS, at least two-thirds of the examinations shall be located between the first isolation valve (Le., isolation valve closest to the RPV) and the RPV.

(4)

A minimum of 10%

of the welds in that portion of the RCPS that lies outside containment (e.g.,

portions of the main feedwater system in SWRs) shall be selected.

(5)

A minimum of 100/0 of the welds within the break exclusion region (SER) shall be selected.

In contrast to a number of RI-ISI Program applications where the percentage of Class 1 piping locations selected for examination has fallen substantially below 10%, Code Case N-716 mandates that 10% be chosen.

Section 4 of EPRI TR-112657 was used as guidance in determining the examination requirements for these locations.

2.3.6 Additional Examinations The RIS_S Program in all cases will determine through an engineering evaluation the root cause of any unacceptable flaw or relevant condition found during examination.

The evaluation will include the applicable service conditions and degradation mechanisms to establish that the element(s) will still perform their intended safety function during subsequent operation.

Elements not meeting this requirement will be repaired or replaced.

The evaluation will include whether other elements in the segment or additional segments are subject to the same root cause conditions.

Additional examinations will be performed on those elements with the same root cause conditions or degradation mechanisms.

The additional

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

14 of 44 examinations will include HSS elements up to a number equivalent to the number of elements required to be inspected during the current outage. If unacceptable flaws or relevant conditions are again found similar to the initial problem, the remaining elements identified as susceptible will be examined during the current outage. No additional examinations need be performed if there are no additional elements identified as being susceptible to the same root cause conditions.

2.3.7 Risk Impact Assessment The RIS_B Program has been conducted in accordance with Regulatory Guide 1.174 and the requirements of Code Case N-716, and the risk from implementation of this program is expected to remain neutral or decrease when compared to that estimated from current requirements.

This evaluation categorized segments as high safety significant or low safety significant in accordance with Code Case N-716, and then determined what inspection changes are proposed for each system. The changes include changing the number and location of inspections and in many cases improving the effectiveness of the inspection to account for the findings of the RIS_B degradation mechanism assessment.

For example, examinations of locations subject to thermal fatigue will be conducted on an expanded volume and will be focused to enhance the probability of detection (POD) during the inspection process.

2.3.8 Quantitative Analysis Code Case N-716 has adopted the EPRI TR-112657 process for risk impact analyses whereby limits are imposed to ensure that the change in risk of implementing the RIS_B Program meets the requirements of Regulatory Guides 1.174 and 1.178. The EPRI criterion requires that the cumulative change in CDF and LERF be less than 1E-07 and 1E-08 per year per system, respectively.

Entergy has conducted a risk impact analysis per the requirements of Section 5 of Code Case N-716 that is consistent with the "Simplified Risk Quantification Method" described in Section 3.7 of EPRI TR-112657. The analysis estimates the net change in risk due to the positive and negative influences of adding and removing locations from the inspection program.

The conditional core damage probability (CCDP) and conditional large early release probability (CLERP) values used to assess risk impact were estimated based on pipe break location.

Based on these estimated

values, a

corresponding consequence rank was assigned per the requirements of EPRI TR-112657 and upper bound threshold values were used as provided below.

Consistent with the EPRI risk-informed methodology, the upper bound for all break locations that fall within the high consequence rank range was based on the highest CCDP value obtained (Le., Large LOCA for W3).

Program Section No: CEP-ISI-102 Revision No.:

,:.0 Page No.:

15 of 44 The likelihood of pressure boundary failure (PBF) is determined by the presence of different degradation mechanisms and the rank is based on the relative failure probability.

The basic likelihood of PBF for a piping location with no degradation mechanism present is given as Xc and is expected to have a value less than 1E-Qa.

Piping locations identified as medium failure potential have a likelihood of 20xo. These PBF likelihoods are consistent with References 9 and 14 of EPRI TR-112657. In addition, the analysis was performed both with and without taking credit for enhanced inspection effectiveness due to an increased POD from application of the RIS_B approach.

Table 3.4-1 of each template submittal presents a summary of the RIS_B Program versus 1992 ASME Section XI Code Edition program requirements on a "per system" basis. The presence of FAC was adjusted for in the quantitative analysis by excluding its impact on the failure potential rank. The exclusion of the impact of FAC on the failure potential rank and therefore in the determination of the change in risk is performed, because FAC is a damage mechanism managed by a separate, independent plant augmented inspection program.

The RIS_B Program credits and relies upon this plant augmented inspection program to manage this damage mechanism. The plant FAC Program will continue to determine where and when examinations shall be performed.

Hence, since the number of FAC examination locations remains the same "before" and "after" and no delta exist, there is no need to include the impact of FAC in the performance of the risk impact analysis.

2.3.9 IMPLEMENTATION AND MONITORING PROGRAM Upon approval of the RIS_B Program, procedures that comply with the guidelines described in EPRI TR-112657 will be prepared to implement and monitor the program. The applicable aspects of the ASME Code not affected by this change will be retained, such as inspection methods, acceptance guidelines, pressure

testing, corrective
measures, documentation requirements, and quality control requirements.

Existing ASME Section XI program implementing procedures will be retained and modified to address the RIS_B process, as appropriate.

The monitoring and corrective action program will contain the following elements:

A. Identify B. Characterize C. (1) Evaluate, determine the cause and extent of the condition identified (2) Evaluate, develop a corrective action plan or plans D. Decide E. Implement

Program Section No: CEP-ISI-102 Revision No.:

.;.0 Page No.:

16 of 44 F. Monitor G. Trend The RIS_B Program is a living program requiring feedback of new relevant information to ensure the appropriate identification of HSS piping locations.

As a minimum, this review will be conducted on an ASME period basis.

In addition, significant changes may require more frequent adjustment as directed by NRC Bulletin or Generic Letter requirements, or by industry and plant-specific feedback.

2.4 Methods of Examination and Personnel Qualification The three types of examination methods employed for Inservice Inspection are

visual, surface and volumetric.

Each of these types describes a general technique which, in some cases, permits a selection of different methods within that type. The methods allow the Owner to select the most effective examination methodology based on factors such as component accessibility, radiation levels and component material of construction.

Administration and control of Section XI examinations and personnel qualification requirements are included in CEP-NOE-100, "Administration and Control of ENS NOE" 2.5 Inspection Intervals and Inspection Scheduling 2.5.1 Inspection Intervals Per IWA-2430 of ASME Section XI, the inservice examinations required by IWB, IWC, and IWO, and the examinations and tests of IWF shall be completed during each of the inspection intervals for the service lifetime of the power unit.

Because the Code of Federal Regulations, 10CFR50.55a(g)(4)(ii) specifies 120 month inspection intervals for inservice inspections, Inspection Program B must be employed.

Per IWA-2430(d), for components inspected under Program B, each of the inspection intervals may be extended or decreased by as much as one year. Adjustments shall not cause successive intervals to be altered by more than one year from the original pattern of intervals.

Inspection Interval timeline for GGNS is shown in Figure 2.5-1. Note that the Interval end dates is pulled back to shorten the interval, as allowed by IWA-2430(d).

This is being done to regain the allowable one year extension for future intervals.

Augmented examinations will align with the ASME Section XI interval unless stated otherwise in the document that governs the specific criteria for the examinations.

Program Section No: CEP-ISI-102 Revision No.:

0--------

Page No.:

17 of 44 Examinations shall be scheduled and performed in accordance with this section and the applicable document that governs each augmented examination. Details of the augmented examinations are addressed in Appendix 8.

There may be instances when augmented examinations and ASME Section XI examinations coincide for the same component. Examinations should be performed concurrently to optimize examination resources to the extent practical 2.5.2 Inspection Schedule Per IWB-2410, inservice examinations of Class 1 components may be performed during plant outages such as refueling shutdowns or maintenance shutdowns.

Per IWC-2410, IWD-2410, and IWF-2410, inservice examinations of Class 2, Class 3 and Class 1, 2, and 3 component supports, respectively may be performed during either system operation or plant outages.

Table 2.5-1 provides the minimum and maximum percentages of examinations required to be completed by each inspection period. this information.

The following examinations listed in IWB-2412(a)(1) to (5),

are not required to meet the criteria in Table 2.5-1.

(1) Examination Categories B-N-1, 8-P, and 8-Q (2) Examinations partially deferred to the end of the inspection interval, as allowed by Examination Categories 8-A, 8-0, B-F.

(3) Examinations deferred to the end of the inspection interval, as allowed by Examination Categories 8-A, 8-L-1, 8-M-1, B-N-2, 8-N-3, and B-O.

(4)

Examinations deferred until disassembly of a component for maintenance, repairlreplacement activity, or volumetric examination as allowed by Examination Categories B-G-1, 8-G-2, B-L-2, and B-M-2, (5)

Welded attachments examined as a result of component support deformation under Examination Category 8-K.

In the event that an Examination Category includes less than three components or items, the components or items may be examined in any two periods; or if in anyone period if there is only one item or component in lieu of the requirements of Table 2.5-1.

Program Section No: CEP-ISI-102 Revision No.:

0------

Page No.:

18 of 44 TABLE 2.5-1 GGNS COMPONENT/COMPONENT SUPPORT SCHEDULING INSPECTION INSPECTION PERIOD MINIMUM MAXIMUM INTERVAL (CALENDAR YEARS OF EXAMINATIONS EXAMINATIONS PLANT SERVICE WITHIN COMPLETED, %

COMPLETED, %

THE INTERVAL) 3rd 3

16 50 3rd 4

501 75 3rd 3

100 100 1 If the first period completion percentage for any examination category exceeds 34%, at least 16% of the required examinations shall be performed in the second period.

Program Section No: CEP-ISI-102 Revision No.:

~O Page No.:

19 of 44 Figure 2.5-1: GGNS 3rd Interval Schedule RF16 F 2008 RF17 SP 2010 RF18 SP 2012 RF19 SP 2014 RF20 SP 2016 2018 007 1/2008 1/2009 1/201~

1/2011 1/2( 12 1/2013 1/2014 1/2015 1/201E 1/2017 11

,if 1/2 1st Period 2nd Period 3rd Period kf.-.....o----

--_-+.....-.----


lIloW-----

~

06/2017 t

End of 3rd Interval 06/2014 06/2011

  • End of 2nd Interval for Class 1 and 2 Piping Weld Exams.
  • See Request for Alternative GG-ISI-003 for Piping Welds I

I I

I 05/31/200~

t Start of 3rd Interval

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

20 of 44 2.6 Component and Component Support Selection Criteria Class 1, 2, and 3 components and component supports were selected for examination per the requirements of the 2001 Edition with the 2003 Addenda of Section XI, Tables IWB-2500-1, IWC-2500-1, IWD-2500-1, and IWF-2500-1, respectively.

IWB-2420(a), IWC-2420(a), IWD-2420(a) and IWF-2420(a), state that the sequence of component and component support examinations established during the first interval shall be repeated during the successive intervals to the extent practical.

Entergy is also adopting the alternative criteria of Code Case N-624, which states that the sequence of examinations may be modified provided the percentage of requirements of Tables IWB-2412-1, IWC-2412-1, IWD-2412-1 and IWF-2410-2 are met. This alternative criterion allows the sequence of examinations established during the first interval to be modified by factors such as scaffolding erection, radiological concerns, insulation removal or other considerations.

2.6.1 Selection of 151 Class 1 Pumps for Internal Surface Exams The VT-3 examination of lSI Class 1 pump casing internal surfaces in accordance with Table IWB-2500-1, Examination Category B-L-2 is subject to the following criteria per Notes (1) and (2) of that table:

(1) Examinations are limited to at least one pump in each group of pumps performing similar functions in the system, e.g. recirculating coolant pumps.

(2)

Examination is required only when the pump is disassembled for maintenance, repair or volumetric examination. Examination of the internal pressure boundary shall include the internal pressure retaining surfaces made accessible for examination by disassembly.

If a

partial examination is performed and a

subsequent disassembly of that pump allows a more extensive examination, an examination shall be performed during the subsequent disassembly. A complete examination of one pump in each group is required only once during the interval.

lSI Class 1 pumps subject to examination at GGNS are identified in the ScheduleWorks Module of IDDEAL Software.

2.6.2 Selection of 151 Class 1 Valves for Internal Surface Exams The VT-3 examination of lSI Class 1 valve internal surfaces in accordance with Table IWB-2500-1, Examination Category B-M-2 is subject to the following criteria per Notes (2) and (3) of that table:

(2)

Examination is required only when the valve is disassembled for maintenance, repair or volumetric examination.

Examination of the internal pressure boundary shall include the internal pressure retaining surfaces made accessible for examination by disassembly. If a partial examination is performed and a subsequent disassembly of that pump allows a more extensive examination, an examination shall be performed

Program Section No: CEP-ISI-102 Revision No.:

0~----

Page No.:

21 of 44 during the subsequent disassembly.

A complete examination of one valve in each group is required only once during the interval.

(3)

Examinations are limited to at least one valve within each group of valves that are the same size, constructional design, (such as globe, gate, or check valves), and manufacturing method, and that perform similar functions in the system (such as containment isolation and system overpressure protection).

lSI Class 1

valves subject to examination at GGNS are identified in ScheduleWorks Module of IDDEAL Software.

Note that examination of each valve in a "Unique" group of valves is required a maximum of once during the inspection interval.

2.6.3 Selection of lSI Class 1 Valves for Bolting Examinations The VT-1 examination of lSI Class 1 valve bolting, 2 in. and less in diameter is performed in accordance with Table IWB-2500-1, Examination Category B-G-2, including Note 2:

(2) For vessels, pumps, or valves, examination of bolting is required only when the component is examined undr Examination Category B-B, B-L-2, or B-M-2.

Examination of bolted connection is required only once during the interval.

lSI Class 1 valves subject to bolting examination at GGNS are identified in ScheduleWorks Module of IDDEAL Software. Note that examination of each valve in a "Unique" group of valves is required a maximum of once during the inspection interval.

2.6.4 Selection of lSI Class 1 Valves for Body Weld Examinations The volumetric examination of lSI Class 1 valve body welds is performed in accordance with Table IWB-2500-1, Examination Category B-M-1, Notes (3) and (4):

(3) Examinations are limited to at least one valve within each group, of valves that are the same size, constructional design, (such as globe, gate, or check valves), and manufacturing method, and that perform similar functions in the system (such as containment isolation and system overpressure protection).

(4) Includes essentially 100% of weld length.

GGNS does not contain lSI Class 1 valves with valve body welds.

Program Section No: CEP-ISI-102 Revision No.:

.;..0 Page No.:

22 of 44 2.7 Examination Evaluation Criteria Evaluation of reportable indications detected during the inservice inspection of components and component supports will be performed in accordance with Article IWA-3000 of ASME Section XI, 2001 Edition with 2003 Addenda.

Specific evaluation requirements for Class 1, 2, and 3 components are included in IWB-3000, IWC-3000, and IWD-3000, respectively.

Specific evaluation requirements for Class 1, 2, and 3 component supports are included in IWF-3000. Indications detected may be evaluated by other nondestructive methods, where practical, to assist in the determination of flaw characteristics (e.g. size, shape, location, orientation, etc.) before final disposition is made.

Evaluation of reportable indications detected during the augmented examination of components and component supports will be performed in accordance with this section and the applicable document that governs each augmented examination.

2.7.1 Successive Inspections Successive Inspections on Class 1 components will be performed in accordance with IWB-2420 which includes the following criteria in IWB-2420(b), (c) and (e):

(b) If a component is accepted for continued service in accordance with IWB-3132.3 or IWB-3142.4, the areas containing flaws or relevant conditions shall be reexamined during the next three inspection periods listed in the schedule of the inspection program of IWB-2400.

Alternatively, acoustic emission may be used to monitor growth of existing flaws in accordance with IWA-2234.

(c) If the reexaminations required by IWB-2420(b) reveal that the flaws or relevant conditions remain essentially unchanged for three successive inspection

periods, the component examination schedule may revert to the original schedule of successive inspections.

(e) If welded attachments are examined as a result of identified component support deformation, and the results of these examinations exceed the acceptance standards of Table IWB-3410-1, successive examinations shall be performed, if determined necessary, based on an evaluation by Entergy.

Successive Inspections on Class 2 components will be performed in accordance with IWC-2420 which includes the following criteria in IWC-2420(b), (c) and (d):

(b) If a component is accepted for continued service in accordance with IWC-3122.3 or IWC-3132.3, the areas containing flaws or relevant conditions shall be reexamined during the next inspection period listed in the schedule of the inspection program of IWC-

Program Section No: CEP-ISI-102 Revision No.:

.:,,0 Page No.:

23 of 44 2400.

Alternatively, acoustic emission may be used to monitor growth of existing flaws in accordance with IWA-2234.

(c) If the reexaminations required by IWC-2420(b) reveal that the flaws or relevant conditions remain essentially unchanged for the next inspection period, the component examination schedule may revert to the original schedule of successive inspections.

(d) If welded attachments are examined as a result of identified component support deformation, and the results of these examinations exceed the acceptance standards of Table IWC-3410-1, successive examinations shall be performed, if determined necessary, based on an evaluation by Entergy.

As an alternative for lSI Class 1 and lSI Class 2 vessels with subsurface flaws, the criteria of Code Case N-526 may be used.

Successive Inspections on Class 3 components will be performed in accordance with IWD-2420 which includes the following criteria in IWD-2420(b), (c) and (d):

(b) If components are accepted for continued service by evaluation in accordance with IWD-3000, the areas containing flaws or relevant conditions shall be reexamined during the next inspection period listed in the schedule of the inspection program of IWD-2400.

(c) If the reexaminations required by IWD-2420(b) reveal that the flaws or relevant conditions remain essentially unchanged for the next inspection period, the component examination schedule may revert to the original schedule of successive inspections.

(d) If welded attachments are examined as a result of identified component support deformation, and the results of these examinations exceed the acceptance standards of IWD-3000, successive examinations shall be performed, if determined necessary, based on an evaluation by Entergy.

Successive Inspections on Class 1, 2 and 3 component supports will be performed in accordance with IWF-2420 which includes the following criteria in IWF-2420(b) and (c):

(b) When a component support is accepted for continued service in accordance with IWF-3112.2 or IWF-3122.2, the component support shall be reexamined during the next inspection period listed in the schedules of the inspection programs of IWF-2410 (c) When the examinations required by IWF-2420(b) do not require additional corrective measures during the next

period, the inspection schedule may revert to the requirements of IWF-2420(a).

Program Section No: CEP-ISI-102 Revision No.:

~O Page No.:

24 of 44 Successive Inspections on Augmented examinations will be performed in accordance with its' Augmented Program requirements document.

Plant specific successive inspections are identified in the IDDEAL database Scheduleworks@ module for each plant and are discussed in Section 3.6.

2.7.2 Additional Examinations Additional examinations of Examination Category R-A welds shall be determined in accordance with 2.7.2.5. The additional examinations will include HSS elements up to a number equivalent to the number of elements required to be inspected during the current outage.

If unacceptable flaws or relevant conditions are again found similar to the initial problem, the remaining elements identified as susceptible will be examined during the current outage.

All other examinations shall be determined in accordance with 2.7.2.5 or 2.7.2.1,2.7.2.2,2.7.2.3,2.7.2.4 as applicable.

Additional examinations for augmented components and component supports will be performed in accordance the applicable document that governs each augmented examination.

2.7.2.1 Additional examinations on Class 1 components will be performed in accordance with IWB-2430 which includes the following criteria in IWB-2430(a), (b) and (c):

(a)

Examinations performed in accordance with Table IWB-2500-1, except for Examination Category B-P, that reveal flaws or relevant conditions exceeding the acceptance standards of Table IWB-3410-1 shall be extended to include additional examinations during the current outage.

The additional examinations shall include an additional number of welds, areas, or parts1 included in the inspection item2 equal to the number of welds, areas, or parts included in the inspection item that were scheduled to be performed during the present inspection period.

The additional examinations shall be selected from welds, areas, or parts of similar material and service.

This additional selection may require inclusion of piping systems other than the one containing the flaws or relevant conditions.

(b) If additional examinations required by IWB-2430(a) reveal flaws or relevant conditions exceeding the acceptance standards of Table IWB-3410-1, the examinations shall be further extended to include additional examinations during the current outage.

These additional examinations shall include the remaining number of welds, areas, or parts of similar material and service subject to the same type of flaws or relevant conditions.

Program Section No:

CEP-ISI-102 Revision No.:

0.;:;...-----

Page No.:

25 of 44 (c) For the inspection period following the period in which the examinations of IWB-2430(a) or (b) were completed, the examinations shall be performed as originally scheduled in accordance with IWB-2400.

1 Welds, areas or parts are those described or intended in a particular inspection item of Table IWB-2500-1.

2 An inspection item, as listed in Table IWB-2500-1, may comprise a number of welds, areas, or parts of a component required to be examined in accordance with the inspection plan and schedule (IWA-2420).

2.7.2.2 Additional examinations on Class 2 components will be performed in accordance with IWC-2430 which includes the following criteria in IWC-2430(a), (b) and (c):

(a) Examinations performed in accordance with Table IWC-2500-1, except for Examination Category C-H, that reveal flaws or relevant conditions exceeding the acceptance standards of Table IWC-3410-1 shall be extended to include additional examinations during the current outage.

The additional examinations shall include an additional number of welds, areas, or parts1 included in the inspection item2 equal to 20% of the number of welds, areas, or parts included in the inspection item that were scheduled to be performed during the interval.

The additional examinations shall be selected from welds, areas, or parts of similar material and service.

This additional selection may require inclusion of piping systems other than the one containing the flaws or relevant conditions.

(b) If additional examinations required by IWC-2430(a) reveal flaws or relevant conditions exceeding the acceptance standards of Table IWC-3410-1, the examinations shall be further extended to include additional examinations during the current outage.

These additional examinations shall include the remaining number of welds, areas, or parts of similar material and service subject to the same type of flaws or relevant conditions.

(c) For the inspection period following the period in which the examinations of IWC-2430(a) or (b) were completed, the examinations shall be performed as originally scheduled in accordance with IWC-2400 1 Welds, areas or parts are those described or intended in a particular inspection item of Table IWC-2500-1.

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

26 of 44 2

An inspection item, as listed in Table IWC-2500-1, may comprise a number of welds, areas, or parts of a component required to be examined in accordance with the inspection plan and schedule (IWA-2420).

2.7.2.3 Additional examinations on Class 3 components will be performed in accordance with IWD-2430 which includes the following criteria in IWD-2430(a), (b) and (c):

(a) Examinations performed in accordance with Table IWD-2500-1, except for Examination Category D-8, that reveal flaws or relevant conditions exceeding the acceptance standards of IWD-3000 shall be extended to include additional examinations during the current outage.

The additional examinations shall include an additional number of welds, areas, or parts1 included in the inspection item2 equal to 20%

of the number of welds, areas, or parts included in the inspection item that were scheduled to be performed during the interval.

The additional examinations shall be selected from welds, areas, or parts of similar material and service.

This additional selection may require inclusion of piping systems other than the one containing the flaws or relevant conditions.

(b) If additional examinations required by IWD-2430(a) reveal flaws or relevant conditions exceeding the acceptance standards of IWD-3000, the examinations shall be further extended to include additional examinations during the current outage.

The extent of the additional examinations shall be determined by Entergy based upon an engineering evaluation of the root cause of the flaws or relevant conditions. Entergy's corrective actions shall be documented in accordance with IWA-6000.

(c) For the inspection period following the period in which the examinations of IWD-2430(a) or (b) were completed, the examinations shall be performed as originally scheduled in accordance with IWD-2400 1 Welds, areas or parts are those described or intended in a particular inspection item of Table IWD-2500-1.

2 An inspection item, as listed in Table IWD-2500-1, may comprise a number of welds, areas, or parts of a component required to be examined in accordance with the inspection plan and schedule (IWA-2420).

2.7.2.4 Additional examinations on Class 1, 2 and 3 component supports will be performed in accordance with IWF-2430 which includes the following criteria in IWF-2430(a), (b), (c) and (d):

Program Section No: CEP-ISI-102 Revision No.:

.;::;.0 Page No.:

27 of 44 (a)

Component support examinations performed in accordance with Table IWF-2500-1 that reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400 shall be extended to include the component supports immediately adjacent to those component supports for which corrective action is required.

The additional examinations shall be extended to include additional supports within the system, equal in number and of the same type and function as those scheduled for examination during the inspection period.

(b) When the additional examinations required by IWF-2430(a) reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400, the examinations shall be further extended to include additional examinations during the current outage.

These additional examinations shall include the remaining component supports within the system of the same type and function.

(c) When the additional examinations required by IWF-2430(b) reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400, the examinations shall be extended to include all nonexempt supports potentially subject to the same failure modes that required corrective actions in accordance with IWF-2430(a) and (b). Also, these additional examinations shall include nonexempt component supports in other systems when the support failures requiring corrective actions indicate non-system-related support failure modes.

(d) When the additional examinations required by IWF-2430(c) reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400, Entergy shall examine those exempt component supports that could be affected by the same observed failure modes and could affect nonexempt components.

2.7.2.5 The following criteria of Code Case N-586-1 may be applied for the performance of additional examinations on Class 1, 2 or 3 components or component supports.

(a) An engineering evaluation shall be performed. Topics to be addressed in the engineering evaluation shall include:

1) A determination of the root cause of the flaws or relevant conditions.

2)

An evaluation of applicable service conditions and degradation mechanisms to establish the affected welds,

Program Section No: CEP-ISI-102 Revision No.:

.;;:;:.0 Page No.:

28 of 44 areas, or supports will perform their intended safety functions during subsequent operation.

3) A determination of which additional welds, areas, or supports could be subject to the same root cause conditions and degradation mechanisms. This may require the inclusion of piping systems other than the one containing the original flaws or relevant conditions.

(b) Additional examinations shall be performed on those welds, areas, or supports subject to the same root cause conditions and degradation mechanisms.

No additional examinations are required if the engineering evaluation concludes that either:

1) there are no additional welds, areas, or supports subject to the same root cause conditions, or
2) no degradation mechanism exists.

(c) Any required additional examinations shall be performed during the current outage.

(d)

The engineering evaluation shall be retained in accordance with IWA-6000.

Plant specific additional examinations are identified in the IDDEAL database Scheduleworks module for each plant and are discussed in Section 3.6.

2.8 Records and Reports The preparation and retention of records and reports detailing lSI plans and schedules, examinations, tests, replacements, and repairs will be in accordance with Article IWA-6000 of ASME Section XI, 2001 Edition with 2003 Addenda as modified by the alternative requirements of Code Case N-532-4.

Form OAR-1 will be prepared, maintained, and submitted in accordance with Program Section CEP-R&R-001.

3.0 INSERVICE INSPECTION PROGRAM PLAN DESCRIPTION This Inservice Inspection Program Section consists of those examination requirements in ASME Section XI, Subsections IWA, IWB, IWC, IWD, IWF and Mandatory Appendices.

The following text includes a detailed description of the ASME Section XI lSI Program Plan in Section 3.1 which provides a comprehensive summary of the bases for the lSI Program Plan. Sections 3.2, 3.3 and 3.4 include supporting details for Later Editions and Addenda of ASME Section XI, ASME Section XI Code Cases, and Requests For Relief and Requests For Alternatives from ASME Section XI requirements.

Sections 3.5 through 3.13 provide additional information that describe and support this lSI Program Plan.

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

29 of 44 3.1 ASME Section XI Requirements Based on ASME Section XI Code of Record "lock-in" date of May 31, 2007 for GGNS and the 10CFR50.55a requirements in effect at that time, this lSI Program Plan was developed in accordance with the requirements of the 2001 Edition with 2003 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Subsections IWA, IWB, IWC, IWO, IWF, Mandatory Appendices, and Inspection Program B of IWA-2432, except as follows:

3.1.1 Code of Federal Regulations Modifications and Limitations The following mandatory and optional Code of Federal Regulations Limitations and Modifications are included in 10CFR50.55a as of September 29,2005. Only those 10CFR50.55a Limitations and Modifications applicable to the 2001 Edition with 2003 Addenda of Section XI nondestructive examination requirements for Class 1,2, and 3 components and component supports are listed.

10CFR50.55a Limitations and Modifications applicable to System Pressure

Testing, Containment Inservice Inspection and Repair/Replacement Activities are addressed in Program Sections CEP-PT-001, CEP-CISI-001 and CEP-R&R-001, respectively.

Note that mandatory modification 10CFR50.55a(b)(2)(xxi)(C) was removed by the Final Rule dated September 29, 2005 (70FR188), effective on October 31, 2005.

These Limitations and Modifications were reviewed for inclusion in the lSI Program Plan and dispositioned as follows:

3.1.1.1 Entergy will not implement the option in 10CFR50.55a(b)(2)(i), to utilize ASME Section XI, 1974 Edition with Addenda through Summer 1975 and ASME Section XI, 1977 Edition with Addenda through Summer 1978.

3.1.1.2 Entergy will not utilize the option in 10CFR50.55a(b)(2)(ii),

to examine Class 1 piping per ASME Section XI, 1974 Edition with the Summer 1975 Addenda.

3.1.1.3 10CFR50.55a(b)(2)(iii) discusses steam generator tubing and is not applicable to GGNS.

3.1.1.4 Entergy will not utilize the option in 10CFR50.55a(b)(2)(iv),

to examine Class 2 piping per ASME Section XI, 1974 Edition with the Summer 1975 Addenda and the 1983 Edition through the Summer 1983 Addenda.

3.1.1.5 As required by 10CFR50.55a(b)(2)(x), Entergy will apply the station 10CFR50 Appendix B Quality Assurance Program to Section XI activities.

3.1.1.6 As required by 10CFR50.55a(b)(2)(xi), Entergy will apply the rules in IWB-1220, "Components Exempt from Examination," of Section XI, 1989 Edition in lieu of the IWB-1220 requirements in Section XI, 2001 Edition with 2003 Addenda.

Program Section No:

CEP-ISI-102 Revision No.:

0~----

Page No.:

30 of 44 3.1.1.7 As allowed by 10CFR50.55a(b)(2)(xiv), Entergy may use the annual practice requirements in VI1-4240 of Section XI Appendix VII in place of the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of annual hands-on training (when deemed appropriate) as discussed in 10CFR50.55a(b)(2)(xiv). When utilizing this option, the annual practice requirements will be performed on material or welds that contain cracks, or by analyzing prerecorded data from material or welds that contain cracks.

All training will be completed no earlier than 6 months prior to performing ultrasonic examinations.

3.1.1.8 Entergy will implement the Appendix VIII specimen set and qualification provisions in paragraphs (b)(2)(xv)(A) to (b)(2)(xv)(M) in accordance with 10CFR50.55a(b)(2)(xv) with the understanding that the alternative requirements of Code Case N-695 will be utilized in lieu of those in Appendix VIII, Supplement 10, and the alternative requirements of Code Case N-696 will be utilized in lieu of those in Appendix VIII, Supplements 2, 3 and 10 for examinations performed from the inside diameter.

Entergy views the requirements in 10CFR50.55a(b)(2)(xv) to be mandatory.

3.1.1.9 As required by 10CFR50.55a(b)(2)(xvi)(A) and 10CFR50.55a(b)(2)(xvi)(B), Entergy examinations performed from one side of a ferritic vessel weld and examinations performed from one side of a ferritic or stainless steel pipe will be conducted with equipment, procedures, and personnel that have demonstrated proficiency with single side examinations.

3.1.1.10 As required by 10CFR50.55a(b}(2)(xviii}(A}, Level I and" nondestructive examination personnel at Entergy will be recertified on a 3-year interval in lieu of the 5-year interval specified in IWA-2314(a) and IWA-2314(b) of the 2001 Edition with 2003.

3.1.1.11 As required by 10CFR50.55a(b)(2)(xviii)(B),

paragraph IWA-2316 of the 2001 Edition with 2003 Addenda will only be used to qualify personnel that observe for leakage during system leakage and hydrostatic tests conducted in accordance with IWA-5211(a) and (b).

3.1.1.12 As required by 10CFR50.55a(b)(2)(xviii)(C),

when qualifying visual examination personnel for VT-3 visual examinations under paragraph IWA-2317 of the 2001 Edition with 2003, the proficiency of the training must be demonstrated by administering an initial qualification examination and administering subsequent examinations on a 3-year interval.

3.1.1.13 As required by 10CFR50.55a(b)(2}(xix), Entergy will apply the rules in IWA-2240, "Alternative Examinations," of Section XI, 1997 Addenda in lieu of the IWA-2240 requirements in Section XI,

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

31 of 44 2001 Edition with 2003 Addenda for the substitution of alternative examination methods.

3.1.1.14 As required by 10CFR50.55a(b)(2)(xxi)(A), the provisions of Table IWB-2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items Nos. B3.120 and B3.140 of Inspection Program B in the 1998 Edition will be applied by Entergy.

As allowed by 10CFR50.55a(b)(2)(xxi)(A), a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, 1998 Edition with 2000 Addenda may be performed in place of an ultrasonic examination.

3.1.1.15 The requirements of 10CFR50.55a(b)(2)(xxi)(B) for Table IWB-2500-1, Examination Category B-G-2, Item B7.80, Pressure Retaining CRD Housing Bolting will be applied by Entergy at GGNS.

3.1.1.16 Entergy will not implement the provision in IWA-2200, "Surface Examination" that allows the use of an ultrasonic examination method.

The use of this provision is prohibited by 10CFR50.55a(b)(2)(xxii).

3.1.1.17 Entergy will not implement Appendix VIII and the supplements to Appendix VIII and Article 1-3000 in the 2002 Addenda and the 2003 Addenda of the 2001 Edition. The use of these requirements is prohibited by 10CFR50.55a(b)(2)(xxiv).

3.1.1.18 Entergy will not implement the option in 10CFR50.55a(g)(4)(iii) to perform surface examinations on High Pressure Safety Injection System welds specified in Table IWB-2500-1, Examination Category B-J, Item Numbers B9.20, B9.21, and B9.22.

Examination of these welds is being addressed in accordance with the Risk-Informed lSI Program application.

3.1.2 ASME Section XI Code Cases ASME Section XI Code Cases incorporated into the lSI Program Plan applicable to nondestructive examination requirements for Class 11 2 1 and 3 components and component supports are listed in Table 3.3-1. A detailed explanation of ASME Section XI Code Case implementation is included in Section 3.3.

Code Cases applicable to System Pressure

Testing, Containment Inservice Inspection and Repair/Replacement Activities are addressed in Program Sections CEP-PT-001, CEP-CISI-102 and CEP-R&R-001, respectively.

3.1.3 Requests For Relief and Requests For Alternatives Modifications to ASME Section XI requirements applicable to nondestructive examination requirements for Class 1,2, and 3 components and component supports incorporated into the lSI Program Plan by way of a Request for

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

32 of 44 Alternative or a Request for Relief submitted to the NRC in accordance with 10CFRSO.SSa(a)(3) or 10CFRSO.SSa(g)(S), respectively, are listed in Table 3.4-1.

A detailed explanation of Requests For Relief and Requests For Alternatives implementation is included Section 3.4.

Requests For Relief and Requests For Alternatives applicable to System Pressure Testing, Containment Inservice Inspection and Repair/Replacement Activities are addressed in Program Sections CEP-PT-001, CEP-CISI-102 and CEP-R&R-001, respectively.

3.2 Later Editions and Addenda of ASME Section XI The use of later Editions and/or Addenda of ASME Section XI is permitted with specific NRC approval.

On July 28, 2004, the NRC published Regulatory Issue Summary (RIS) 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI".

This RIS requires Entergy to submit later editions and addenda to the staff via a request for approval.

Additionally, as the NRC determines appropriate through changes to 10CFRSO.SSa, they sometimes mandate the use of later portions of ASME Section XI.

This program sub-section identifies those later Editions and/or Addenda that have been included into the lSI Program Plan based on NRC approval in 10CFRSO.SSa. The use of later Editions and Addenda of ASME Section XI will be reflected in sub-section 3.1 when incorporated into this lSI Program Plan.

3.3 ASME Section XI Code Cases Incorporated Into the lSI Program Alternatives to ASME Section XI requirements that are provided in Code Cases may be incorporated into the lSI Program as described below.

The use of Code Cases is in accordance with 10CFRSO.SSa. ASME Code Cases that have been determined to be suitable for use in lSI Program Plans by the NRC are listed in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability-ASME Section XI, Division 1". Table 3.3-1 lists the ASME Section XI Code Cases which have been incorporated into the lSI Program Plan.

Code Cases that are "Acceptable" or "Conditionally Acceptable" in Regulatory Guide 1.147 are shown with the revision number of Regulatory Guide 1.147 that first approved it.

If conditions are stipulated for a Code Case in Regulatory Guide 1.147, Entergy will meet these conditions when applying the Code Case.

Code Cases not endorsed in the current revision of Regulatory Guide 1.147 are shown with a Request for Alternative number.

A corresponding Request for Alternative has been prepared to employ the Code Case (see Table 3.4-1 for status of the Request for Alternative). The use of Code Cases (other than those listed in Regulatory Guide 1.147) may be authorized by the Director of the Office of Nuclear Reactor Regulation upon request pursuant to 10CFRSO.5Sa(a)(3) via acceptance of the associated Request for Alternative.

Note that only Codes Cases applicable to nondestructive examination requirements for Class 1, 2, and 3 components and component supports are

Program Section No: CEP-ISI-102 Revision No.:

.::.0 Page No.:

33 of 44 addressed in Table 3.3-1.

Code Cases applicable to System Pressure Testing, Containment Inservice Inspection and Repair/Replacement Activities are addressed in Program Sections CEP-PT-001 t CEP-CISI-102 and CEP-R&R-001, respectively.

At the time this lSI Program Plan was originally issued, Revision 15 of Regulatory Guide 1.147 was the latest version of the Regulatory Guide that was available for use.

TABLE 3.3-1 CODE CASES INCORPORATED INTO THE lSI PROGRAM Program Section No: CEP-ISI-102 Revision No.:

0--------

Page No.:

34 of 44 Code Titlel RG 1.147 Case Regulatory Guide 1.147 Conditions For Use Revisionl Request for Alternative N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds 14 N-526 Alternative Requirements for Successive Inspections of Class 1 and 2 Vessels 14 N-532-4 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice 15 Summary Report Preparation and Submission N-545 Alternative Requirements for Conduct of Performance Demonstration Detection Test of Reactor Vessel 14 N-552 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface 14 Conditions of Regulatory Guide 1.147: To achieve consistency with the 10CFR50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII, "Performance Demonstration for Ultrasonic Examination Systems," to Section XI, add the follOWing to the specimen requirements:

"At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks. Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches."

Add to the detection criteria, ttThe number of false calls must not exceed three.

N-586-1 Alternative Additional Examination Requirements for Class 1, 2, and 3 Piping, Components, and Supports 15 N-613-1 Ultrasonic Examination of Full Penetration Nozzles in Vessels, Examination Category B-D, Item No's.

14 B3.10 and B3.90, ReactorVessel-to-Nozzle Welds, Fig. lWB-2500-7(a), (b), and (c)

N-624 Successive Inspections 14

Program Section No: CEP-ISI-102 Revision No.:

.;:;.0 Page No.:

35 of 44 Code Titlel RG 1.147 Case Regulatory Guide 1.147 Conditions For Use Revisionl Request for Alternative N-639 Alternative Calibration Block Material 14 Conditions of Regulatory Guide 1.147: Chemical ranges of the calibration block may vary from the materials specification if: (1) it is within the chemical range of the component to be inspected and (2) the phase and grain shape are maintained in the same ranges produced by the thermal process required by the material specification.

N-648-1 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles 14 Conditions of Regulatory Guide 1.147: In place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table.

N-664 Performance Demonstration Requirements for Examination of Unclad Reactor Pressure Vessel Welds, 14 Excluding Flange Welds N-685 Lighting Requirements for Surface Examination 15 N-686 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3 15 N-695 Qualification Requirements for Dissimilar Metal Piping Welds 14 N-696 Qualification Requirements for Appendix VIII Piping Examinations Conducted From the Inside Surface 15 N-700 Alternative Rules for Selection of Classes 1, 2, and 3 Vessel Welded Attachments for Examination 15 N-716 Alternative Piping Classification and Examination Requirements GG-ISI-D02 Conditions of Regulatory Guide 1.147: Pending - Not Currently Addressed in Regulatory Guide 1.147 N-747 Reactor Vessel Head-to-Flange Weld Examinations CEP-ISI-11 Conditions of RegUlatory Guide 1.147: Not Currently Addressed in Regulatory Guide 1.147

Program Section No: CEP-ISI-102 Revision No.:

0~----

Page No.:

36 of 44 Code Titlel RG 1.147 Case Regulatory Guide 1.147 Conditions For Use Revisionl Request for Alternative N-753 Vision Tests CEP-ISI-12 Conditions of Regulatory Guide 1.147: Pending - Not Currently Addressed in Regulatory Guide 1.147

Program Section No:

CEP-ISI-102 Revision No.:

.:.,0 Page No.:

37 of 44 3.4 Requests For Relief and Requests For Alternatives from ASME Section XI Requirements Table 3.4-1 contains an index of Requests For Alternatives and Requests for Relief written in accordance with 10CFR50.55a (a)(3) and (g)(5), as discussed in Section 2.1.4. The applicable Entergy submittal and NRC SER correspondence numbers are also included in Table 3.4-1 for each Request for Alternatives and Request For Relief.

Note that only Requests for Alternatives or Requests for Relief applicable to nondestructive examination requirements for Class 1, 2, and 3 components and component supports are addressed in Table 3.4-1.

Requests for Alternatives or Requests for Relief applicable to System Pressure Testing, Containment Inservice Inspection and Repair/Replacement Activities are addressed in Program Sections CEP-PT-001, CEP-CISI-102 and CEP-R&R-001, respectively.

In the event that the entire examination volume or surface (as defined in the ASME Code) cannot be examined due to interference by another component or part geometry, then, in accordance with Code Case N-460, a reduction in examination volume or area is acceptable if the reduction is less than 10%.

In the event that the reduction in examination volume or area is 10%

or greater, a Request For Relief will be submitted.

NRC Information Notice 98-42 provides additional guidance that all ASME Section XI examinations should meet the examination coverage criteria established in Code Case N-460.

Therefore, the guidance included in NRC Information Notice 98-42 will be followed by Entergy when determining whether to prepare a Relief Request or apply the criteria of Code Case N-460 for examinations where less than 100% coverage of a Section XI examination is obtained.

TABLE 3.4-1 REQUESTS FOR RELIEF AND REQUESTS FOR ALTERNATIVES FROM ASME SECTION XI REQUIREMENTS Program Section No: CEP-ISI-102 Revision No.:

~O Page No.:

38 of 44 Request Request Description Entergy Number Correspondence NRC SER Correspondence 1-2-00001 Request for alternative examination of RPV circumferential shell welds (Category B1.11) using the CNR02001-00011 Revision 1 BWR-VIP-05 report as a basis.

GNRI2001-o0048 CEP-ISI-11 Request to Utilize The Alternative Requirements of Code Case N-747; Reactor Vessel Head-to-CNR02008-00016 Flange Weld Examinations CEP-ISI-12 Request to Utilize The Alternative Requirements of Code Case N-753; Vision Tests CNR02008-00016 GG-ISI-002 Request to Utilize The Alternative Requirements of Code Case N-716; Alternative Piping CNR02006-00043 Classification and Examination Requirements GNRI2007-00110

Program Section No:

CEP-ISI-102 Revision No.:

.0:;..0 Page No.:

39 of 44 3.5 Augmented Examinations Plans Augmented examinations are considered in one of the following three categories:

augmented examinations for external commitments, Owner elected examinations for internal commitments and license renewal examinations for aging management commitments. These three types of examinations are described in Sections 3.5.1, 3.5.2 and 3.5.3 of below. In addition, each section includes a table which lists the applicable augmented program. Details on the various examinations and frequencies are provided in Appendix B 3.5.1 Augmented Examinations This type of augmented examination is conducted to meet a commitment made to a source outside the utility. Typically these are commitments made to the NRC in response to regulatory documents such as Generic Letters, Bulletins and NUREGs. The augmented examinations for external commitments covered in this program are listed in Table 3.5-1.

3.5.2 Owner Elected Examinations This type of augmented examination is conducted to meet a commitment made internally at the plant. These typically involve examinations resulting from Condition Reports or similar documents that identify conditions in the plant that warrant monitoring, but are outside the scope of ASME Section XI. The Owner elected examinations for internal commitments are listed in Table 3.5-2.

3.5.3 License Renewal Examinations This type of augmented examination is conducted to ensure the integrity of components during the license extension period. These typically involve components or criteria that are beyond those of ASME Section XI, but in some cases may supplement existing Code or regulatory requirements.

The license renewal examinations for aging management commitments are listed in Table 3.5-3.

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

40 of 44 TABLE 3.5-1 AUGMENTED EXAMINATIONS FOR EXTERNAL COMMITMENTS SOURCE DOCUMENT TITLE/DESCRIPTION Generic Letter 88-01/ BWRVIP-75 Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Nozzle Cracking NUREG-0800, Section 3.6.2, EPRI TRIOO6937 Risk Informed Break Exclusion Region SIL #415 Inspection of Recirculation Pump Suction Splitters SIL #483 CRD Cap Screw Crack Indication TABLE 3.5-2 OWNER ELECTED EXAMINATIONS FOR INTERNAL COMMITMENTS SOURCE DOCUMENT None TITLE/DESCRIPTION None

Program Section No: CEP-ISI-102 Revision No.:

0=-----

Page No.:

41 of 44 TABLE 3.5-3 LICENSE RENEWAL EXAMINATIONS FOR AGING MANAGEMENT COMMITMENTS SOURCE DOCUMENT None None TITLE/DESCRIPTION

Program Section No: CEP-ISI-102 Revision No.:

0-------

Page No.:

42 of 44 3.6 Successive Inspections and Additional Examinations Successive Inspections required to be performed in accordance with IWB-2420, IWC-2420, IWD-2420 and IWF-2420 are identified in the IDDEAL database Scheduleworks module by an "h" (scheduled successive inspection) or an "H" (completed successive inspection).

Additional Examinations required to be performed in accordance with IWB-2430, IWC-2430, IWD-2430 and IWF-2430 are identified in the IDDEAL database Scheduleworks@ module by an "e" (scheduled additional examination) or an "E" (completed additional examination).

3.7 Systems and Components Subject To Examination The systems and components included in the Inservice Inspection Program are identified in the GGNS lSI Boundary Diagrams.

A listing of these lSI Boundary Diagrams is included on drawing P-0030.

These systems and components are referred to as "lSI Class 1", "lSI Class 2" or "lSI Class 3" and are subject to the requirements of ASME Section XI, Subsections IWB, IWC, and IWD, respectively.

Typically, systems and components at GGNS, which is designed in accordance with ASME Section III, Class 1,2, and 3 requirements are included in the Inservice Inspection Program. Some of these systems and components are excluded or exempted from Section XI requirements because they are optionally upgraded to Code Class as discussed in IWA-1320(e) or because they do not perform the functions listed in IWD-1210(a) to (t).

For a full explanation of the implementation of Section XI requirements (including exemptions and exclusions) at GGNS see the Piping Une Coding Legends and Exemption and Exclusion Flag Legend on drawing P-0030.

3.8 Nonexempt ASME Class Components and Component Supports The lSI Class 1, 2, and 3 components which are not exempt from examination per ASME Section XI, IWB-1220, IWC-1220, IWD-1220, and IWF-1230 are identified on the lSI Boundary Diagrams in accordance with the Pipe Line Codings on drawing P-0030.

Nonexempt components are not included within flags corresponding to Section XI exemptions listed in the plant Exemption and Exclusion Flag Legend.

3.9 Exempt ASME Class Components and Component Supports The lSI Class 1, 2, and 3 components which are exempt from examination are those which meet the criteria of ASME Section XI, IWB-1220, IWC-1220, and IWD-1220. Component supports which meet the criteria of IWF-1230 are also exempt from examination.

Exempt components are identified on the lSI Boundary Diagrams in accordance with the Exemption and Exclusion Flag Legend on

Program Section No:

CEP-ISI-102 Revision No.:

~O Page No.:

43 of 44 drawing P-0030.

Exempt component supports are supports of components which are exempt from examination perWB-1220, IWC-1220, and IWD-1220.

3.10 151 Isometrics and 151 Equipment Drawings lSI Isometrics and lSI Equipment Drawings were developed to identify the lSI Class 1, 2, and 3 components (welds, bolting, etc.) and component supports which are subject to examination per ASME Section XI.

The lSI Isometrics and lSI Equipment Drawings were developed to support the lSI Program and are not to be used for design information.

lSI Isometrics and lSI Equipment Drawings are available for each site as follows:

3.10.1 An index of the isometrics and equipment drawings is included in Appendix A. The lSI Isometrics and lSI Equipment Drawings are included in Appendix C.

3.11 Calibration Standards Calibration standards are used to calibrate ultrasonic examination equipment.

These standards were used during preservice examinations and during the previous lSI intervals, and are maintained at GGNS.

Calibration standards are listed in the IDDEAL database.

Calibration block thickness is the same nominal thickness as the material being examined. Any calibration block thickness that is within.+/-. 25%

of the material being examined may be considered to be the same nominal thickness.

Alternative calibration blocks may be used if the referencing procedure allows the use of such blocks.

Additions or changes to the calibration blocks listed in the IDDEAL database shall be requested with the use of a Program Database Change Notice (PDCN) in accordance with Program Section CEP-COS-011 O.

3.12 IDDEAL lSI Database The IDDEAL database and associated software are electronic tools utilized at GGNS to manage the data and documents comprising the lSI Program Plan.

Scheduling and component information is controlled by the Scheduleworks module of the IDDEAL database.

The IDDEAL database is controlled in accordance with CEP-COS-011 O.

The IDDEAL database is a master component inspection item list that acts as the focal point to access individual items and information scheduled for work.

Individual information for specific scheduled components pertaining to unique item specifications, reference drawings, procedures, inspection records and individual examination requirements is integrated within the program.

Inspection item planning and scheduling is accessed for organizing and tracking inspection scopes

Program Section No:

CEP-ISI-102 Revision No.:

0-------

Page No.:

44 of 44 with the ability to create/view inspection work packages and track results on specific NDE method inspection data forms.

3.13 Incomplete or Missing Examinations Resolution and tracking of incomplete or missed examinations shall be in accordance with the PCN/CR process as described below:

3.13.1 PCN Requirements A PCN to the program shall be developed in a timely manner. The PCN should contain the following:

a) The affected component.

b) The examination requirement that has not been, or will not be, met.

c) The reason for incomplete or missed examination.

d) Alternate examinations performed or recommended, (Le. best effort vs. VT-1, etc.) to include reasons why this is acceptable.

e) For partial examinations, the extent of coverage the component received or will receive using approved methods.

3.13.2 Request for Relief If a Request for Relief is required for an incomplete or missing examination, the following steps shall be completed:

a) The site should develop and submit the necessary documentation to the NRC.

b) If the Request for Relief is approved by the NRC, the approval should be incorporated into the program plan by a PCN.

c) If the Request for Relief is disapproved, the site should initiate a CR.

3.13.3 Missed Examinations Which Cannot Be Made Up If it is discovered that a required examination has been missed and cannot be performed before the end of the inspection period in accordance with the Program Plan, a CR should be initiated.

NOTE The period includes any extensions made within the ASME Section XI and 10CFR50.55a provisions. The end of the period does not occur until any applicable extensions are completed.