EPID:L-2023-NTR-0005
From kanterella
(Redirected from EPID:L-2023-TOP-0018)
Jump to navigation
Jump to search
EPID - L-2023-NTR-0005, (Open) 24 February 2023 - 21 March 2025 | |
|---|---|
Request for: - NTR Open | |
Initiation
Questions Answers | |
| From: | |
MONTHYEARML23045A2642023-02-24024 February 2023
[table view]Title: E-Mail - NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud ML23045A2652023-02-24024 February 2023 Title: NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud (EPID ML23214A0532023-09-14014 September 2023 Title: E-mail - NRC Completion Determination Form 898 and Proprietary Determination Form 898 for BWRVIP-100, Revision 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel ML23214A0692023-09-14014 September 2023 Title: BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 898,Topical Report Completeness Determination ML23214A0722023-09-14014 September 2023 Title: BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 897, Topical Report Withholding Determination ML23011A3422023-10-30030 October 2023 Title: February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Memo ML23060A0972023-10-30030 October 2023 Title: February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Enclosure 3 - at ML24036A0052024-02-12012 February 2024 Title: E-Mail - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components ML24036A0072024-02-12012 February 2024 Title: Redacted - Enclosure 2 - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components (EPID L-2023-NTR-0005 ML24219A0532024-09-12012 September 2024 Title: Summary of August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components ML24219A0802024-09-12012 September 2024 Title: Attendees List for August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components ML24219A0762024-09-12012 September 2024 Title: August 2024 Summary of Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components ML24255A0022024-09-23023 September 2024 Title: Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components ML25023A0922025-03-21021 March 2025 Title: E-mail - Draft Safety Evaluation Associated with EPRI Technical Report BWRVIP-100, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components, Revision 2 2024-02-12 | |