ENS 48265
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
16:00 Sep 2, 2012 | |
| Title | Planned Outage of Emergency Operations Facility |
| Event Description | As part of preparation for the upcoming Democratic National Convention (DNC), contingencies are in place associated with the common Emergency Operations Facility (EOF) for Catawba, McGuire, and Oconee Nuclear Stations. The common EOF is located in Charlotte, NC. Because of the potential for event security to delay staffing of the facility within the prescribed time frame, Duke Energy is implementing its business continuity plan for the EOF during the period from 12:00 PM (noon) on September 2nd until 24:00 (midnight) on September 6th.
If a declared emergency were to occur at Oconee Nuclear Station, the EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location. This facility is used as a backup location for the Catawba TSC as specified in station procedures. This report is being made in accordance with 10CFR50.72, criterion (b)(3)(xiii), and in accordance with NUREG-1022, Revision 2, as a condition that may impair the functionality of an Emergency Response Facility. The licensee notified the South Carolina Department of Health and Environmental Control, Pickens County, and Oconee County. The licensee has notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Oconee South Carolina (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
| Time - Person (Reporting Time:+-7.42 h-0.309 days <br />-0.0442 weeks <br />-0.0102 months <br />) | |
| Opened: | Jeff Hrynda 08:35 Sep 2, 2012 |
| NRC Officer: | Dong Park |
| Last Updated: | Sep 2, 2012 |
| 48265 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48265\u003C/a\u003E - \u003Ca href=\"/Oconee\" title=\"Oconee\"\u003EOconee\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPlanned Outage of Emergency Operations Facility\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48265 - Oconee\n","link":"","lat":34.79336388888889,"lon":-82.89360555555555,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Unit 3 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 547712020-07-10T13:00:00010 July 2020 13:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Common Emergency Operations Facility Maintenance ENS 545092020-02-03T14:15:0003 February 2020 14:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades ENS 495112013-11-07T17:00:0007 November 2013 17:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Taken Out of Service for Planned Maintenance ENS 487702013-02-19T15:54:00019 February 2013 15:54:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Oconee Alert and Notification System Sirens Out of Service ENS 484072012-10-15T10:56:00015 October 2012 10:56:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Area Radiation Monitor Used for Emergency Assessment Failed ENS 482842012-09-06T00:06:0006 September 2012 00:06:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Inoperable Accident Radiation Monitors ENS 482652012-09-02T16:00:0002 September 2012 16:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Outage of Emergency Operations Facility ENS 482642012-09-02T02:30:0002 September 2012 02:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Declared Inoperable ENS 422062005-12-15T14:30:00015 December 2005 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Siren Power ENS 410502004-09-17T14:30:00017 September 2004 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Siren Capability 2020-07-10T13:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48265&oldid=423660"