Pacific Gas and Electric Company~
PG&E Letter DCL-24-122 NMMSS Operations U.S. Department of Energy 1000 Independence Avenue, SW NA-ESH-12/Germantown Bldg.
Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel DaDas L. Adams Manager, Program Engineering Diablo Canyon Power Plant Mail code 1 4141427 P.O. Box 56 Avila Beach, CA 93424 805.545.6182 Oallas.Adams@pge.com 10 CFR 74.15 Pursuant to 10 CFR 74.15(a), the enclosure provides two files in a computer-readable format of the Nuclear Material Transaction Report for materials received on December 16, 2024, and December 18, 2024. The files were prepared in accordance with NUREG/BR-0006, Revision 9, "Instructions for Completing Nuclear Material Transaction Reports," dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report 0-24, "Personal Computer Data Input for Nuclear Regulatory Commission Licensees," dated March 24, 2020.
If you have any questions regarding the enclosure, please contact Mr. Santosh Patel at (805) 545-3255.
Sincerely, Dallas L. Adams Enclosure cc:
Diablo Distribution Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator NRC Document Control Desk A member of the STARS Alliance Callaway Diab{o Canyon
- Palo Verde Wolf Creek Date