DCL-21-092, Submittal of Nuclear Material Transaction Report for New Fuel
| ML21343A363 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/09/2021 |
| From: | Peck A Pacific Gas & Electric Co |
| To: | Cettin J Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy (DOE) |
| References | |
| DCL-21-092 | |
| Download: ML21343A363 (1) | |
Text
Adam S. Peck Senior Director Engineering, Technical And Emergency Services Diablo Canyon Power Plant Mail code 104/5/507 P.O. Box 56 Avila Beach, CA 93424 805.545.6675 Internal: 691.6675 A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek PG&E Letter DCL-21-092 John Cettin 10 CFR 74.15 NMMSS Program, NA-532 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel
Dear Mr. Cettin:
Pursuant to 10 CFR 74.15, the enclosure provides one file in a computer-readable format of the Nuclear Material Transaction Report for materials received on December 01, 2021. The file was prepared in accordance with NUREG/BR-0006, Revision 9, Instructions for Completing Nuclear Material Transaction Reports, dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, Personal Computer Data Input for Nuclear Regulatory Commission Licensees, dated August 2016.
If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.
Sincerely, Adam S. Peck Date Enclosure cc: Samson S. Lee, NRC Senior Project Manager Scott A. Morris, NRC Region IV Administrator Winston C. Smith, Acting NRC Senior Resident Inspector NRC Document Control Desk Diablo Distribution 12/09/2021 m
Pacific Gas and Electric Company*