CPSES-200500968, Transmittal of Year 2004 Radioactive Effluent Release Report
| ML051220439 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/26/2005 |
| From: | Madden F TXU Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200500968, RP-09, TXX-05091, FOIA/PA-2009-0260 | |
| Download: ML051220439 (3) | |
Text
TXU Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &
Bectric Station Chief Nuclear Officer P. 0. Box 1002 (EO1)
Glen Rose. TX 76043 Tel 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com Ref: #10CFR50.36a(a)(2)
CPSES-200500968 Log # TXX-05091 File # RP-09 April 26,2005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF YEAR 2004 RADIOACTIVE EFFLUENT RELEASE REPORT Gentlemen:
In accordance with Section 5.6.3 of the CPSES Unit I and 2 Technical Specifications (Appendix A to License Nos. NPF-87 and NPF-89) and Section 6.9.1.4 of the CPSES Offsite Dose Calculation Manual (ODCM), enclosed is the Radioactive Effluent Release Report which covers the reporting period from January 1, 2004 through December 31, 2004.
The tabular summaries of radioactive liquid and gaseous releases are provided in the format defined in Appendix B of Regulatory Guide 1.21, Rev. 1, dated June, 1974.
During this reporting period there were two (2) changes to the CPSES ODCM; therefore, as required by Section 6.14c of the ODCM, a complete copy of the entire ODCM (Revision 22), current as of December 31, 2004, is included as Attachment 8.2 to the subject report.
If there are any questions regarding this report, contact Bob Kidwell at (254) 897-5310 or Scott Bradley at (254) 897-5495.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
TXX-05091 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By:_____
Ardw W. Madden Director, Regulatory Affairs RJK Enclosure c -
B. S. Mallett, Region IV w/encl M. C. Thadani, NRR (clo)
Resident Inspectors, CPSES (clo)
2004 Report