CPSES-200401735, June 2004 Monthly Operating Report for Comanche Peak, Units 1 and 2
| ML042080230 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/16/2004 |
| From: | Madden F TXU Generation Co, LP, TXU Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200401735, RP-84, TXX-04127 | |
| Download: ML042080230 (4) | |
Text
Pe TXU v4"1' Power TXU Power Comanche Peak Steam Electric Station PO Box 1002 E01 Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com Mike Blevins Senior Vice President &
Chief Nuclear Officer Ref: #IOCFR50.36 CPSES-200401735 Log # TXX-04127 RP-84 July 16, 2004 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR JUNE 2004 Gentlemen:
Attached is the Monthly Operating Report for June 2004, prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License, Nos. NPF-87 and NPF-89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon Palo Verde
- South Texas Project Wolf Creek
TXX-041 27 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas Snow at (254) 897-8448.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By:
AZJY7Y2PJA Fred W. Madden Regulatory Affairs Manager DWS Attachment cc -
B. S. Mallett Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors
Attachment to TXX-04127 Page I of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-445 Comanche Peak 1 July 12, 2004 Douglas W. Snow (254) 897-8448 June 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 115000 1,150.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 835,894.00 Yr-to-Date 3,500.00 3,460.87 0.00 3,885,409.00 Cumulative 106,685.43 105,777.10 0.00 112,870,532.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments I I NONE I
I I
I NONE I
I I
I I
I I
SUMMARY
- 6/01/2004 0000 Unit began the month at full power. 06/30/2004 2400 Unit ended the month at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Attachmernt to TYX-04127 Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-446 Comanche Peak 2 July 12, 2004 Douglas W. Snow (254) 897-8448 June 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,150.00 1,150.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 818,481.00 Yr-to-Date 4,367.00 4,367.00 0.00 4,986,392.00 Cumulative 85,203.05 84,653.28 0.00 92,041,694.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments I
I NONE I
I I
NONE I
I I
I I
I I
SUMMARY
- 06/01/04 0000 Unit began the month at full power. 06/30/04 2400 Unit ended the month at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriptScram 4
Continuation 5
Other (Explain)