CPSES-200401735, June 2004 Monthly Operating Report for Comanche Peak, Units 1 and 2

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Comanche Peak, Units 1 and 2
ML042080230
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/16/2004
From: Madden F
TXU Generation Co, LP, TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200401735, RP-84, TXX-04127
Download: ML042080230 (4)


Text

Pe TXU v4"1' Power TXU Power Comanche Peak Steam Electric Station PO Box 1002 E01 Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com Mike Blevins Senior Vice President &

Chief Nuclear Officer Ref: #IOCFR50.36 CPSES-200401735 Log # TXX-04127 RP-84 July 16, 2004 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR JUNE 2004 Gentlemen:

Attached is the Monthly Operating Report for June 2004, prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License, Nos. NPF-87 and NPF-89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon Palo Verde
  • South Texas Project Wolf Creek

TXX-041 27 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas Snow at (254) 897-8448.

Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC Its General Partner Mike Blevins By:

AZJY7Y2PJA Fred W. Madden Regulatory Affairs Manager DWS Attachment cc -

B. S. Mallett Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors

Attachment to TXX-04127 Page I of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-445 Comanche Peak 1 July 12, 2004 Douglas W. Snow (254) 897-8448 June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 115000 1,150.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 835,894.00 Yr-to-Date 3,500.00 3,460.87 0.00 3,885,409.00 Cumulative 106,685.43 105,777.10 0.00 112,870,532.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments I I NONE I

I I

I NONE I

I I

I I

I I

SUMMARY

6/01/2004 0000 Unit began the month at full power. 06/30/2004 2400 Unit ended the month at full power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Attachmernt to TYX-04127 Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-446 Comanche Peak 2 July 12, 2004 Douglas W. Snow (254) 897-8448 June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,150.00 1,150.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 818,481.00 Yr-to-Date 4,367.00 4,367.00 0.00 4,986,392.00 Cumulative 85,203.05 84,653.28 0.00 92,041,694.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments I

I NONE I

I I

NONE I

I I

I I

I I

SUMMARY

06/01/04 0000 Unit began the month at full power. 06/30/04 2400 Unit ended the month at full power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriptScram 4

Continuation 5

Other (Explain)