BYRON 2016-0036, Submittal of 2016 Initial License Examination Post-Examination Comments

From kanterella
Jump to navigation Jump to search
Submittal of 2016 Initial License Examination Post-Examination Comments
ML16092A055
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/01/2016
From: Kanavos M
Exelon Generation Co
To: Pederson C
Document Control Desk, Region 3 Administrator
References
BYRON 2016-0036
Download: ML16092A055 (2)


Text

Byron Generating Station 4450 North German Church Road Exeton Generation April 1,2016 LTR:

BYRON 2016-0036 FILE:

1.10.0101 (1D.101)

Cynthia D Pederson Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Renewed Facility Operating License No. NPF-37 and NPF-66 NRC Docket No. STN 50-454 and STN 50-455

SUBJECT:

Submittal of 2016 Byron Initial License Examination Post-Examination Comments Byron has no post exam comments for the 2016 Byron Initial License Examination administered March 14 to Match 25, 2016.

In accordance with ES-402, Section D.4.e, the following material was mailed to Michael Bielby, Chief Examiner at Region Ill offices via USPS Certified Mail on March 25, 2016. The USPS tracking number is 70151520000050088529:

Graded written examination original answer sheets with a copy of each applicants answer sheet before grading The signed applicants exam cover sheets Applicant questions and proctor responses during the written examination Written examination seating chart The master examination and answer keys were hand delivered to Michael Bielby on March 7, 2016. The facility has made no changes to the exam since then.

Original forms ES-201-3, Examination Security Agreement with Pre-and Post-examination signatures will be delivered as soon as all the Post-examination signatures have been completed.

Per our discussion with Michael Bielby, we request the NRC withhold public disclosure of the exam in ADAMS for 2 years so we can have the exam available for internal use.

LTR: BYRON 201 6-0036 April 1,2016 Cynthia D. Pederson Page 2 Additionally, we request the procedure for RO Admin JPM RA-d, Activate Everbridge Notification be withheld from public disclosure because it contains proprietary information.

The proprietary information contained within the JPM has been redacted, so that JPM itself may be published. The procedure that we request to be withheld is EP-AA-1 12-100-F-06, ERO NOTIFICATION OR AUGMENTATION.

The exam exit will be conducted by Michael Bielby, NRC Chief Examiner, via a telephone conference when the exam grading is completed.

Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.

Respectfully, Mark E. Kanavos Site Vice President Byron Generating Station M EK/RFP/AC/sg cc: NRC Senior Resident Inspector Byron Station

Byron Generating Station 4450 North German Church Road Exeton Generation April 1,2016 LTR:

BYRON 2016-0036 FILE:

1.10.0101 (1D.101)

Cynthia D Pederson Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Renewed Facility Operating License No. NPF-37 and NPF-66 NRC Docket No. STN 50-454 and STN 50-455

SUBJECT:

Submittal of 2016 Byron Initial License Examination Post-Examination Comments Byron has no post exam comments for the 2016 Byron Initial License Examination administered March 14 to Match 25, 2016.

In accordance with ES-402, Section D.4.e, the following material was mailed to Michael Bielby, Chief Examiner at Region Ill offices via USPS Certified Mail on March 25, 2016. The USPS tracking number is 70151520000050088529:

Graded written examination original answer sheets with a copy of each applicants answer sheet before grading The signed applicants exam cover sheets Applicant questions and proctor responses during the written examination Written examination seating chart The master examination and answer keys were hand delivered to Michael Bielby on March 7, 2016. The facility has made no changes to the exam since then.

Original forms ES-201-3, Examination Security Agreement with Pre-and Post-examination signatures will be delivered as soon as all the Post-examination signatures have been completed.

Per our discussion with Michael Bielby, we request the NRC withhold public disclosure of the exam in ADAMS for 2 years so we can have the exam available for internal use.

LTR: BYRON 201 6-0036 April 1,2016 Cynthia D. Pederson Page 2 Additionally, we request the procedure for RO Admin JPM RA-d, Activate Everbridge Notification be withheld from public disclosure because it contains proprietary information.

The proprietary information contained within the JPM has been redacted, so that JPM itself may be published. The procedure that we request to be withheld is EP-AA-1 12-100-F-06, ERO NOTIFICATION OR AUGMENTATION.

The exam exit will be conducted by Michael Bielby, NRC Chief Examiner, via a telephone conference when the exam grading is completed.

Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.

Respectfully, Mark E. Kanavos Site Vice President Byron Generating Station M EK/RFP/AC/sg cc: NRC Senior Resident Inspector Byron Station