BSEP-85-0873, Monthly Operating Repts for Apr 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1985
ML20128B072
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/30/1985
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-85-0873, BSEP-85-873, NUDOCS 8505240399
Download: ML20128B072 (12)


Text

-

AfVINDIX 9 AVERAGE DAII.Y POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT i DATE 05/03/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 APRIL 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

OiW E-NE T )

1

-9 47

-7 2

-8 18

-C 3

-7 19

-7 4

-8 20

-c S

-9 21

-7 6

-9 22

-7 7

-0 23

-6 8

-8 24

-6 9

-0

?5

-S 10

~7 26

-5 11

-7 27

-S 12

/

20

-5 13

-7 2?

-5 14

-7 30

-5 iS

-7 16

-7 1.16

-0 8505240399 950430ADOCK 05000324 PDR PDR Y

' q.

J

m j**

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 05/06/05 COMPLETED BY FRANCES HARRISON TELEPHONE. (919)457-9521

0PERATING STATUS

[i".LUNIT-NAME: ' BRUNSWICK.UNITLi

'l NOTES I

2bREPORTING. PERIOD: APRIL 05 I

I 3'. : LICENSED THERMAL: POWER (MWT)2 '2436 I

i 4 ~. NAMEPLATE RATING:(GROSS MWE): 867.0 l

1 5.' DESIGN-ELECTRICAL' RATING (NET MWE). 1821.0 l

l-6... MAX DEPENDABLE CAPACITY-(GROSS MWE): 815.0-l 1

7., MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.;IF CHANGES OCCUR IN CAPACITY RATINGS'(ITEMS 3 THRU 7) SINCE LAST: REPORT, GIVE REASONS:

I

'9.

POWER LEVEL'TO'WHICH RESTRICTED IF ANY (NET MWE):

I 10.= REASONS FOR' RESTRICTION IF ANY:

i THIS YR TO CUMUL MONTH DATE ATIVE I

~

11. HOURS IN REPORTING PERIOD 719.00 2079.00 71184.00
12. NUMDER OF HOURS REACTOR CRITICAL

.00 2079.00 45500.06

'3.' REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10 Ei 4. HOURS GENERATOR ON LINE

.00 2064.45 42953.20

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

14. GROSS THERMAL ~ ENERGY' GEN. (MWH)

.00 3521596.50 07570793.50 117. GROGS _ELEC. ENERGY GEN. (HWH)

.00 1100426.00 20922523.00 11 0. NET ELEC. ENERGY GENERATED (MWH)

~4961.00 1136794.00 27702577.00

19. UNIT SERVICE FACTOR

.00 71.71 60.34

-20. UNIT AVAILADILITY FACTOR

.00 71.71 60.34

21. UNIT CAP. FACTOR.(USING MDC NET)

.07 49.90 49.40 22.JUNIT' CAP.-FACTOR (USING DER NET)

.04 40;09 47.54

23. UNIT FORCED OUTAGE JATE

.00 2.r1 H20.20 i

c24. SliUTDOWNS SCHED. GVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION UF.EACH):

a..

25.-IF SI1UTDOWN AT END OF REPORT PERIOD, ESTIMAlED DA1E OF STAR 1 UP 10/31/05 126. UNITS IN' TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORCASI ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICIlY

--~

r COMMERCIAL OPERATION

---~~---

f i.16 - 9

jis 1- 's DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: May 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

. BRUNSWICK UNIT 1 Unit 1 was shut.down.on March 29, 1985, for refueling / maintenance outage.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.

f

. m J

9 4

s DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brurimwick I DATE May 1985 COMPLETED BY Frances Harrison REFORT MONTH April 1985 TELEPHONE (9I91457-952I I

E c

{g 3

j E5 Lscensee jg

  • L

. Cause & Currective Das<

i 3g 4

2i&

Event-37

^

E O Prevent Recurrence f:

5 jgg Repint a mO g

6 85-006 850329 S

In C

4 NA RC FUELXX Refueling / Maintenance Outage Progress 1

l l

t 2

3 4

l F: Fsweed Reasim-Method:

Exhibit G. Instructions l

5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee l

C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction Ol6tl Is-Continuat. ions E Operator Training & License Examint. con F-Adnunistrative 5-Load Reductions 5

G-Operational Error (Emplain) 6-Other Exhibit I - Same Source 19/77)

If Other IEmlain)

E

b' '- :

s e r, r -

s APPENDIX"B

~

~

' ~

JAVERAGE. DAILY POWER LEVEL' W

~ DOCKET-NO. 050-0324 UNIT BRUNSWICK UNIT ~2 DATE 05/03/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 l-- - ':A P R I L i985

~

L

-- D AY' AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL.

L

.(MWE-NET).

(MWE-NET).

1 514 17 771

[

';2

-ii-18

'768

.3

-10 19 770

!j :. ' 4 -

-9' 20 767

5

-- 1 0 21 776 6

-11 22 776 7"

-10 23 774 0-

-- 1 1 24 775 9-69 25 777 l

10 515 26 777 Lii' 679 27 772 12 747 20 776 i

.13 754 29 777

-l 14 773 30 777 15-769 16 772 l

l l

1.16 - 8 1

Ah Y.I OPERATING-DATA REPORT DOCKET NO. 050-0324 DATE-

.05/03/85

. COMPLETED BY FRANCES-HARRISON TELEPHONE ~ ( 919 ) 457-9521 -

' OPERATING" STATUS

(

li..f0 NIT'NAMEiIDRUNSWICK UNIT'2 i NOTES 1

~

2.-REPORTING PERIOD: APRIL 85 i

l

.3.

LICENSED? THERMAL POWER (MWT)- 2436 l

l 44'NAMEPLATELRATING (GROSS MWE)' 867.0 t

[

5.jDESIGN ELECTRICAL' RATING'(NET MWE): 821.0 t

[

.6.' MAX DEPENDABLE CAPACITY (GROSS MWE)' 015.0 1

-7~. MAX DEPENDABLE' CAPACITY (NET MWE)~ 790.0

~8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU'7) SINCE LAST REPORT,

.GIVE REASONS:

~

9.' POWER-LEVEL TO WHICH RESTRICTED'IF ANY (NET MWE):

10. REASONS FOR RESTRICTION'IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING' PERIOD 719.00 2879.00

_83208.00

12. NUMBER OF HOURS REACTOR CRITICAL 547.60 2450.79 49828.31

.13. REACTOR RESERVE SHUTDOWN HRS

.00

. 00

.00

14. HOURS GENERATOR ON LINE 528.92 2382.19

-46407.26

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

' 16.- GROSS THERMAL ENERGY GEN. (MWH) 1228603.42 5566953.78 88677821.09 17.: GROSS ELEC. ENERGY GEN. (MWH) 406395.00 1861928.00 29463632.00 18.. NET ELEC. ENERGY GENERATED (MWH) 392384.00 1804443.00 28224917.00

~19.

UNIT SERVICE FACTOR 73.56 82.74 55.77

20. UNIT AVAILABILITY FACTOR 73.56 82.74 55.77
21.. UNIT CAP. FACTOR.(USING MDC NET) 69.08 79.34 42.94.

'22. UNIT CAP. FACTOR (USING DER NET) 66.47 76.34 41.32

23. UNIT FORCED OUTAGE RATE 26.44 8.14

~15.99

-24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START.UP:

.26.. UNITS'IN TEST GTATUS (PRIOR TO COMMERCIAL OPERATION)

FORCAST.

ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY 2----

COMMERCIAL OPERATION 1.16 - 9

. c3

~

g.

p...

n:

DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: May 1985 COMPLETED BY: Frances Harrison OPERATIONS.

SUMMARY

BRUNSWICK UNIT 2

-Brunswick Unit 2 operated at a 73.56 percent availability factor for the month-of April with a 69.08 percent-capacity factor. There was one off-line outage and three power reductions. Details are in Unit Shutdowns and Power Reductions sheet.

'There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2. fuel pool.

-q i

4,- -.

DOCKET NO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 2 DATE May 1985 COMPLETED BY Frances Harrison" REPORT MONTH April 1985 TELEPHONE. (919)457-9521 E

e

[

'b j5'5 Licensee 5 r, l4 Cause & Corrective No.

Date i

5?

4 255 Event g7

o. 3 Action to

$E

E 5 di g Report a mO 5'

Prevent Recurrence e

u C

NA Shutdoun unit: High drywell inleakage B5-021 850401 F

190.08 A

I due to both recirculation pump discharge valves F031A & B leaking.

n 1

2 3

4 F: Forced Reases:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual

. for Preparation of Data B-Maintenance of Test 2 Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Scram-Event Report (LER) File (NUREG-01611 D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination F-Administrative 5-Load Reductions 3

G-Operational Error (Explain) 6-Other Exhibit I Same Source (9/77) llother (Explain)

/

. DOCKET NO. O'50-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS i

UNIT NAME Brunswick 2 j'

DATE May 1985 COMPLETED BY Frances Harrinon REPORT MONTH Aoril 1985

. TELEPHONE (919)457-9521 1

E E

5

'E

~

Licensee Er E%

Cause & Corrective l

5j k

) {E'$

($

hU

. Action to Date Event

' Prevent Recurrence jE 5

j if, g Report e vi O g

6 l

85-025 850418 s

00 B

5 NA Reduced power for teajor pumo switching.

Adjust 2B heater drain pump packing and replace crack elbow on 2B l

condensate boorter pump vent.

l I

l I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructitms S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Scram-Event Report (LER) File (NUREG.

0161)

D-Regulatory Restriction 1s-Continuations EOperator Training & License Examination F-Administrative 5-Load Reductions 5

Goperatiocul Error (Explaint

(,-Other Exhibit I - Same Source (9/77)

Il-Other (E splain t L

-m 1.

_g d50-0324 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick 2 UNIT NAME DATE May 1985 COMPLETED BY Frances Harrison REPORT MONTH April 1985 (9IFJ457-952I TELEPHONE I

=

-c

!q j $3 Licensee h

Cause & Curreceive W

Ilah i

3?

{

2iE Even 3,7

^ ' " " ' "

f:

E t ;f, Report a to O EO Preven Recurrence g

6 85-023 850413 S

00 B

5 NA Routine valve testing rod movement and PT-14.1 (Control Rod Operability).

i I

I 2

3 4

F: Finced Reason -

Method:

Exhibit G -Instructions S-Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram-Event Report (LER) File tNUREG-D-Regulatory Restriction 0161) is-Continuat. eons E4)perator Traming & License Ezarmnatson F-Admsnistratr e 5-Load Reductions 3

Goperational Error (Emplain) 6-Other Exhibit I-Same Source l'8/77)

IlOther IEsplaini

!" ~

L

nu,.

l t

DOCKET NO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswiek 2 DATE May 1985 compt.ETED BY Frances Harrianti l

REPORT MONTH April 1985 TELEPHONE (919)457-9521 l

l c

} :El IAcasce

[g j*t Cause & Currective

[-

E&

Evens

~. ?

E'?

Action to Da e-4?

(

Report e rA 0 h0 Present Recurrence l

j@

5 3dg e

t.,

i d

l l

85-026 850420 S

00 B

5 NA C strol Rod Operability and TSV Testing.

1 t

l t

2 3

4 F: Furced Reas.= -

Method:

Exhibit G-Instructions S-Scheduled A Equipment Failure (Esplass) 1-Manual for Preparasite of Data B-Mastenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Aetumatic Scram.

Event Report (LER) File tNUREG.

01611 D-Regulatur) Rest:ectam 4-Continuat. eons Eoperstar Trammg & Ixense Esansnatum F-Adnunstrative 5-toad Reductions 3

GOperat== t Essur iEmplaml 6-Gther Eshibit I - Same Simrce r8/77)

II0:her iEsptaan p

w C9&L Carolina Power & L6ght Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 284o1-0429 May 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0873 Mr. J. H. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 H0VrilLY OPERATING REPORT Door Mr. Taylor In accordanco with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company horowith submits the report of operating statistics and shutdown experience for the month of April 1985.

Very truly yours, big C. R. Dietz, Conoral Manager Brur.swick Steam Electric Plant Fil/mca HSC/85-0014 Encionuras cci Mr. H. R. Beobo Dr. J. N. Grace Hr. J. L. l(arness Mr. C. F. IAssitor Hs. D. J. Vicks INPO f

' t

.