,,_---,,--,-,-v---,_
m_
'e h(
Rape Ferry Rd (Route 156), Waterford, CT 06385 Millstone Nuclear Power Station Nortl, cast Nuclear Energy Company P.O. Box 128 Waterford, Cr 06385 0128 (860) 447 1791 Fax (860) 444-4277 The Northrant Utilides bytem JAN 2 91998 -
Docket Nos.
50-245 50-336 50-423 B16957 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
- Millstone Nuclear Power Station, Unit Nos.1,2, and 3
-Change to Proposed Revision 19 to the Northeast Utilities Quality Assurance Prooram (NUQAP) Toolcal Report The purpose of this letter is to make a change to proposed Revision 19 to the NUQAP Topical Report, previously submitted to the Nuclear Regulatory Commission for review on June 3,1997. The change revises Exception 12 in the previous submittal regarding l
Section 2.1 of ANSI N45.2.3, " Housekeeping During the Construction Phase of Nuclear l
Power Plants." This Exception stated that Zone 1 requirements are not applicable to l
Millstone Station Nuclear _ Power Plant operations and are therefore not applied. This was based on an interpretation that the ANSI standard description for Zone.1 is for an area that would exist only during the constructi_on phase. However, eince " construction type" activities could occur during the operating phase, and the Foreign Material Exclusion-procedures _ already include provisions for implementing ANSI Zone 1 requirements, we have modified the exception to apply ANSI Zone 1 requirements.
This change was discussed with the NRC Staff in a telephone conversation on January 8,1998. Attachment 1 to this letter provides the revised Exception.
Northeast Utilities looks forward to the completion of the NRC review of Revision 19 of
\\
.the NUQAP Topical Report. If you have any further questions regarding this submittal, I
' please contact Mr. Mario Robles, Jr. at (860) 447-1791 ext. 0279.
Very truly yours, QQ NORTHEAST NUCLEAR ENERGY COMPANY
]d..
w Bruce D. Kenyon G President and Chief Executive Officer
. s..
v i
ll'llu ll['l]g{l3 {< 3lo, 9902250095 990129 PDR ADOCK 05000245 P
.a
U.S. Nucinr Rtgul:: tory Commission B16,957\\Page 2 Attachment 1.
Change to App 9ndix E, Page 4 of 5 for Revision 19 to the Northeast Utilities Quality Assurance Program (NUQAP) Topical Report 2.
Regulatory Commitments cc: H. J. Miller, Region i Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 A. C. Cerne, Senior Resident inspector, Millstone Unit No, 3 W. D. Travers, PhD, Director, Special Projects Office 1
_ _J