l u

g g

Hope Ferry Hd, (Route 156). Waterford, CF 06385.

. Nuclear Energy stai on, Noa,ar Po.er sinuon Northeast Nudear Energy Cornpany P.O. Ik,2 128 Waterford, Cr 06'585-0128 '

-(860) 447-1791 i

Fax (860) 444-4277 The Northeast Utihties Syntern

{

i February 20,1997 i

l Docket Nos. 50-245 l

50-336 50-423 j

B16004 U.S. Nuclear Regulatory Commission Attention:, Document Control Desk Washington, DC 20555 i

l Millstone Nuclear Power Station, Unit Nos.1,2,3 l

Chanaes in the Noftheast Nuclear Enerov Comoany Oraanization The purpose of this letter is to notify the NRC staff of additional organizational changes Northeast Utilities has instituted to enhance the recovery organization. The continuing j.

goal of th'e organization is to establish a unitized approach at each of our nuclear units.

?

This will result in the decentralization of a number of functions that were centralized.

Certain limited functions, such as oversight, emergency planning and licensing, will

. remain under centralized direction, although they will have a strong unit presence and focus. The revised organization is shown on the charts provided as Attachment 1 to this letter.

Since Northeast Nuclear Energy Company (NNECO) last organization letter of October 3,1996,m I have appoin9d Mr. Neil S. Carns to the position of Senior Vice President and Chief Nuclear Officer - Millstone, who will report to me. Mr. Carns previously served as the President and Chief Executive Officer for Wolf Creek Nuclear Operating

[/

Corporation. A biographical profile for Mr. Carns is provided in Attachment 2 to this letter.

The' Senior Vice President and Chief Nuclear Officer - Millstene will fulfill the Millstone O site responsibilities formerly held by the Senior Vice President - Millstone. As the Chief f B. D. Kenyon letter to NRC, "Haddam Neck Plant. Seabrook Station, Millstone Nuclear Power Station,

. Unit Nos.1,2, 3, Changes in the Northeast Utilities

  • Nuclear Organization", dated October 3,1996.

-..p 9702240076 970220 PDR ADOCK 05000245 H

PDR O

J

U.S. Nucle::r R:gulatory Commission B.16004/Page 2

' Nuclear Officer - Millstone, the responsibilities formerly held by the Executive Vice President - Nuclear who served as the Chief Nuclear Officer for Millstone have also been transferred to this position. Mr. T. C. Feigenbaum will continue to serve as the Executive Vice President and Chief Nuclear Officer for the Haddam Neck Plant and Seabrook Station.

The recovery organization for the Millstone Station will report directly to the Senior Vice i

President and Chief Nuclear Officer - Millstone. These positions include Mr. F. C.

Rothen, Vice President Work Services: Mr. J. K. Thayer, Recovery Officer Nuclear Engineering and Support; Mr. J. P. McElwain, Recovery Officer Millstone Unit 1; Mr. M.

L. Bowling, Jr., Recovery Officer Millstone Unit 2; and Mr. M. H. Brothers, Vice President - Millstone Unit 3.

The Millstone Unit No. 3 Recovery Officer responsibilities have been transferred to Mr. M. H. Brothers Vice President - Millstone Unit 3. This transfer includes all of the functions performed by this position at the unit and the site level. A biographical sketch for Mr. Brothers is provided in Attachment 2 to this letter.

In addition, since our October 3,1996, letter, NNECO has executed an agreement with l

PECO Energy Company and VEPCO to extend the recovery agreement frorn these utilities to two years. Please contact Mr. R. T. Laudenat at (860) 444-5248 should you have any questions on the above or attached.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Brude D. K'enyon O President and Chief Executive Officer Attachments cc: See Page 3 l

i

U.S. Nuclerr Regul: tory Commission B.16004/Page 3 cc:

H. J.

Miller, Region i Administrator F. J.

Miraglia, Acting Director, NRR W. D. Travers, PhD., Director, Special Projects Office S.

Dembek, NRC Project Manager, Millstone Unit No.1 T. A.

Easlick, Senior Resident inspector, Millstone Unit No.1 D. G. Mcdonald, Jr., RC Project Manager, Millstone Unit No. 2 D.-

Beaulieu, Senior Resident inspector, Millstone Unit No. 2 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 W. D. Lanning, Deputy Director, inspections, Special Projects Office P. F.

McKee, Deputy Director, Licensing and Oversight, Special Projects Office J. P.

Durr, Projects ChiefInspections i

t Do::ket Nos. 50-245 50-336 50-423 B16004 L

I f

i Millstone Nuclear Power Station, Unit Nos.1,2,3 Organization Charts February 1997

)

l

Ot/29M7 Chart 01 Nuclear Group President & Chief Executive Officer of Nuclear Group B. D. Kenyon Executive Secretary Director S ecial Projects A.J. Sche)d P

R. h1. Kacich Executive Assistant N. G. Bergh Administrative Secretary Financial Contractor (I)

Control I. E. Canner

  • I I

I i

Executive Vice President Senior Vice President &

l Iluman Vice President &

Nuclear Chief Nuclear Officer

'p.

Resources Chief Nuclear Officer Oversight Millstone l

C. W. Grise'/D. V. Cassella*

T. C. Feigenbaum D. Al.Goebel N.S. Cams l

l Corporate L.

Communications S. C. Baranski*

SEE CllART 02 SEE CilART 03 SEE CilART 04 Atatrixed From Corporate Center i

l

~. ~

- ~

01q787 Chart 02 Nuclear Group Executive Vice Pressdent &

Chief Nuclear Officer T. C. Feigenbaum Executive Executive Assistant Secretary R. J. DeLoach PVR I

I Vice President Vice President i

Connecticut Yankee Seabrook T. C. Feigenbaum (Acting)

T. C. Feigenbaum (Acting) i i

t t

....m,,

-...e.,

.~... _,,.

i ciatw Chart 02A Connecticut Yankee Station Vice President Commecticut Yankee T. C. Feigenbaum (Acting) l I

Unit Director Director Director Connecticut Yankee Engineering Work Sen-ices J. J. LaPlatney Commecticut Yankee Comeecticut Yankee J. D. Hasettine G. H. Bouchard

=

OlC&97 Chart 02B Seabrook Station

. Vice President Seabrook T. C. Feigenbaum (Acting)..

I I

I I

I Executive Director of Services Station Director Director

& Senior Site Officer, Seabrook Director Nuclear Engineering Support Services B. L Drawbridge W. A.DiProfio J. M. Vargas G. R. Gram,11 t

l h

Clear boxes indicate North Atlantic personnel

OICJ.97 Chart 03

~

Nuclear Group Nuclear Oversight Vice President Nuclear Oversight D. M. Goebel i Recovery Assistant i Executive Assistant j

G. R. Frederick

  • l K. M. McBrien Executive Secretary Communications S J. Anton D. L. Beauchamp Recovery Plan l

Project Manager p P. F. L'11eureux l I

I I

i Director Director Director Director Audits &

Performance Analysis &

Employee Evaluation Evaluation Programs Concerns M. D. iiill" (Acting) 7 M. Richardson M. B. Brown E. L. Morgan i

On Loan From Plant Vogtle

" On Loan From liarris

,-e-,

+

n-r-e e-.--n-s-

-n,+----w.-e--

-+- - + - -

e. - - -, - ~ -. - - -

--v<-+

-w

---~~,w-w m

.~

Ot/p.97 Chart 64 Nuclear Group Senior Vice President &

Chief Nuclear Officer Milhtone N. S. Carns Executive Secretary PVR I

I I

I Vice President Recmen Officer Recovery Officer Recovety Officer Vice President Work Senices Nuclear Engineering & Support Milhtone Unit 1 Milktont Unit 2 Millstone Unit 3 F. C. Rothen l

J. K. Thay er J. P. McElw ain' M. J. Bow ling, Jr."

M.1I. Ilrothers SEE CIIART 04A SEE CilART 04B SEE CilART 04C SEE CllART04D SEE CilART 04E On Loan From PECO Energy Company

01C7S7 Chart 04A Nuclear Group Work Services Vice President Nuclear Work Senices F. C. Rothen Executive Secretary Senior Analyst R. J. Dietrich B. R. Danielson i

I I

I Director Director Director Manager Director Nuclear Contract Adminstration Nuclear Materials General Information Services Senices Management Services Technology

  • W. F. Nevelos W. C. hiihal*
  • A. L. Pollock C. H. Clement R. E. Proulx hiatrixed
    • On Loan From Corporate Purchasing

01 47/97 Chart 04B

~

Nuclear Group Nuclear Engineering & Support Recovery OfHeer Nuclear Engineering & Support J. K. Thayer Executive Secretary Engineering Specialist L. A. liiggins R.11. Veklund INPO Loaneej

11. P. Risley j i

I I

l Director Director Director Director Director Nuclear Engineering (CF)

Engineering Programs Nuclear Training (CT)

Nuclear Licensing Senices Emergency Preparedness M. V. Bonaca S. E. Scace

11. F. Ilay nes R. T. Laudenat (Acting)

P. J. Stroup

?

i i

b

- ~.

. ~.

. ~..

4 Oi!27N7 Chart 04C Millstone Unit 1 Recovery Organization Recovery Officer Millstone Unit 1 J. P. hicElwain

  • i Executive Secretary i

INPO Loanee I M. E. Bermudez J. J. Festa l

a l

I I

I Director Director Director Director Director Engineering Work Management Unit Operations Maintenance /IAC Support Services J. M. Armstrong*

L. A. Hamson*

P. D. Hinnenkamp*

O. J. Becker*

R. M. Moore

  • i
  • On Loan from PECO Energy Company

..~.. -......

' 01/2&97 Chart 04D Millstone Unit 2 Recovery Organization Recovery Officer Millstent Unit 2 M. L Bowling *

{~ ~~ Eployee'~~}

Executive Secretary

~

a.

Communications t.

S. A.O'Neil l

R. J. Gallagher j

f ~ ~ tin ~m~an~~~~)

Recovery Plan j

Manager Resources M. W. Dwyer j

H. H. Blake*

S. K. Brinkman

==------------

p---Budgeting-------

3 p--- Overscht--------)

y y

y I

B. J. Venturo I

I P. J. Parulis I

L-----------

J L-----------

J 93 rector of Engineering Unit Director Millstone Unit 2 Millstone Unit 2 R. P. Necci J. A. Price Legend: {~51alns~PodtE~)

~

m

....,~

.ian Chart 04E Millstone Unit 3 Recovery Organization -

Vice Pm6 dent Mitsteme Omit 3 M 11 Brothers i

I I

I D6erctor Omit 3 Dweeter Diruter Director Restart Dimter Regulatory ANatrs 4----

EeE 8tering 3

J. A. Dubbs' O. D.11ds' (Acung)

Cosendteerst Massgesteet Engineering P. E Grossman r

Ucensing Engiererlag. CAP,Self Assess.

R. J. Duncan*

R. E Urazm'E J. Hetchcr*

i I

j i

On loan from Carolint hwcr 4 Light Company i

r i

a 4

~

w

-,-- ~

m e_,.,

m

.~.

,.g, y,,,

f Docket Nos. 50-245 50-336 50-423 B16004 1

P I

i i.

l

(

4 2

i 5

i Millstone Nuclear Power Station, Unit Nos.1,2, 3 4

Biographical Profiles j

i 4

i l

February 1997

FOX ANNOUNCES SENIOR NUCLEAR APPOINTMENT -

WATERFORD, Connecticut, January 22,1997 - Bernard M. Fox, Chairman, President and CEO of Northeast Utilities today announced the appointment of Neil S.

" Buzz" Carns as Senior Vice President and Chief Nuclear Officer - Millstone. Carns will report directly to Bruce D. Kenyon, President and CEO of Northeast Nuclear Group. He will assume his duties at the Millstone Nuclear Power Station on February 3,1997.

Carns will leave Wolf Creek Nuclea-Operating Corporation, Burlington, Kansas, after over three years as Chairman, President and CEO. He previously served as Vice President, Nuclear Generation for Niagara Mohawk Power Corporation at their Nine Mile Point Nuclear Site in New York State. Prior to joining Niagara Mohawk, Carns was Site Vice President of Arkansas Nuclear One in Russellville, Arkansas.

A former Captain in the U. S. Navy Nuclear Program, Carns is a graduate of the U.S.

Naval Academy at Annapolis with a Bachelor's Degree in Engineering. He also earned a Master's Degree in Public Administration from the University of Washington.

As CNO for Millstone, Carns will oversee the three Unit Recovery Officers, Vice President - Nuclear Work Senices, and the Vice President - Engineering, and be directly responsible for the full scope of operations at the site.

Carns is married and has three grown children and five grandchildren.

4 Biographical Sketch of Mr. Michael H. Brothers I

Mr. Brothers served as Unit Director for Millstone Unit No. 3 from May,1994 to January, j

1995. Prior to becoming Unit Director, he was Operations Manager for Millstone Unit No. 3 from June,1993 to May,1994.

Mr. Brothers served on the Haddam Neck unit staff at Connecticut Yankee Atomic for over seven years in operations and engineering. From August,1992 to June,1993 he held the position of Operations Manager responsible for licensed and non-licensed operations. On the plant engineering staff, Mr. Brothers held the position of Systems Engineering Supervisor responsible for the implementation of the Systems Engineering Program from June,1989 to August 1992. He held the position of Senior Engineer responsible for the Instrumentation and Controls Systems from March,1986 to June,

1989.

Prior to service on staff at Connecticut Yankee, Mr. Brothers held the position of Senior Engineer, Northeast Utilities Service Company responsible for the Nuclear instrumentation and Reactor Protection System upgrades project at Connecticut Yankee from October,1980 to March,1986.

From May,1976 to October,1980, Mr. Brothers worked as a Senior Field Service Engineer for Westinghouse Electric Corporation as a field startup engineer for l

Westinghouse supplied instrumentation and Control Systems at various operating and near-term-operating-license plants.

Mr. Brothers served as an officer in the U. S. Navy Nuclear Program. He holds a Bachelor's Degree in Engineering Physics from the University of Oklahoma, and a i

Master's Degree in Computer Science form the Harvard Graduate Center.

1

+

1 f

E