AnoCHIGAn i
A unit of American Electric Power Indiana Michigan Power One Cook Place Bridgman, MI 49106 Indiana Michigan Power.corn July 23, 2012 AEP-NRC-2012-52 10 CFR 50.4 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO REGULATORY ISSUE
SUMMARY
2012-07 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Nuclear Regulatory Commission (NRC), Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Examinations,", dated June 8, 2012, requests licensees to update examination schedules and applicant estimates for calendar years 2014 through 2017.
Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing, as an enclosure to this letter, NRC Form 536, "Operator Licensing Examination Data," which contains the details of CNPs examination schedule as requested. The class size and composition has significantly changed, since the previous update to the NRC, for the July 2014 and July 2016 classes.
There are no commitments included in this submittal.
Should you have any questions, please contact Ron Sieber, Training Manager at (269) 466-3439.
Sincerely, Joel P. Gebbie Site Vice President KMH/jmr
Enclosure:
NRC Form 536, Operator Licensing Examination Data wao(3
U. S. Nuclear Regulatory Commission Page 2 c:
J. R. Kweiser-NRC Region III NRC Resident Inspector H. Peterson - NRC Region III P. S. Tam - NRC Washington DC AEP-NRC-2012-52
ENCLOSURE TO AEP NRC 2012-52 NRC FORM 536 OPERATOR LICENSING EXAMINATION DATA
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Donald C. Cook Nuclear Plant 3
One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2016 CY 2018 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
1 0
EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2016 CY 2018 CY NUMBER OF REACTOR 10 10 10 OPERATORS NUMBER OF SENIOR REACTOR 6
6 6
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 5
5 5
NUMBER OF SENIOR REACTOR 0
0 0
OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 07/21/2014 07/11/2016 07/23/2018 ALTERNATE DATE 07/28/2014 07/18/2016 07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (9-2011)