AECM-87-0082, Monthly Operating Rept for Mar 1987
| ML20215H020 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/31/1987 |
| From: | Hobbs S, Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| AECM-87-0082, AECM-87-82, NUDOCS 8704200004 | |
| Download: ML20215H020 (4) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
>L o
-f DOCKET NO.
50-416 DATE 04/02/87 COMPLETED BY S. H. Hobbs TELEPHONE (601) 969-2458 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 l Notes:
l 2.
Reporting Period: March 1987 l
l 3.
Licensed Thermal Power (MWt): 3833 MWt l
l 4.
Nameplate Rating (Gross MWe): 1372.5 MWe l
l 5.
Design Electrical Rating (Net MWe): 1250 MWe l
l 6.
Maximum Dependable Capacity (Gross MWe): 1157 MWe l
l 7.
Maximum Dependable Capacity (Net MWe): 1108 MWe l
l 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Ceasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 744 2,160 21,418
- 12. Number of Hours Reactor Was Criticai 744 2,025.7 14,374.5
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744 1,974.9 13,052.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,532.769 6,560,572 37,171,682
- 17. Gross Electrical Energy Generated (MWH) 826,100 2,143,820 11,249,740
- 18. Net Electrical Energy Generated (MWH) 790,295 2,050,400 10,624,166
- 19. Unit Service Factor 100.0 91.4 65.2
- 20. Unit Availability Factor 100.0 91.4 65.2
- 21. Unit Capacity Factor (Using MDC Net) 95.9 85.7 51.8
- 22. Unit Capacity Factor (Using DER Net) 85.0 75.9 45.9
- 23. Unit Forced Outage Rate 0.0 0.0 8.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 d.
J18 PCOM OPT DATA RPT MARCH - 2 s
8704200004 870331 DR ADOCK 05000416 PDR
=.%
DOCKET NO. 50-416 UNIT 1
DATE 04/02/87 COMPLETED BY S. H. Hobbs TELEPHONE (601) 969-2458 MONTH March 1987 DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)
(MWe-Net) 1 902 17 1190 2
909 18 1194 L
3 909 19 1169 4
915 20 887 5
915 21 902 6
922 22 893 7
1124 23 863 8
1215 24 941 9
1215 25 996 10 1227 26 1002 11 1229 27 1016 12 1227 28 1147 13 1225 29 1164 14 1073 30 1169 15 1025 31 1181 16 1184 J18 PCOM OPT DATA RPT MARCH - 3
N.
UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO. 5S-416 UNIT NAME 1-DATE 04/02/87 COMPLETED BY S. H. Hobbs TELEPHONE (601) 969-2458 REPORT MONTH March 1987 I
I I
I I
I I
I i
1 l
l l
l l
l l Method of.l Licensee l l
l Cause & Corrective l
l No. I Date l Type l Duration l Reason l Shutting Downl Event l System l Component l Action To l
l l
l (1) l Hours l
(2) l Reactor l Report #
l Code l
Code I
Prevent Recurrence I
l l
l l
l l
(3) l l
(4) 1 (5) l l
l 1
I I
I I
I I
I I
I I
i I
i I
l l
l l
l l
l87-6 102/20/871 S l
0.0 l
F i
4 l
NA l NA l NA l Planned power reduction for l
l l
l l
l l
l l
l l system load following.
l l
1 l
l l
l l
l 1
I l
l87-7 l03/14/87l S l
0.0 l
F l
5 l
NA l NA l NA l Planned power reduction for I
i l
l l
l l
l l
l l
l system load following.
I I
l l
l l
l l
l 1
I i
187-8 103/20/871 S I
0.0 i
F l
5 l
NA l NA l NA l Planned power reduction for l
l l
l l
l l
l l
l I system load demand.
I I
I I
I I
I I
I I
I I
I I
I l
l l
l l
l.
l l
l l
1 1
I l
l l
l l
l l
1 I
I I
I l
l l
l l
l l
l l
l I
I I
I I
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination F-Administrative 5
Exhibit 1-Same Source G-Operational Error (Explain)
H-Other (Explain)
- In accordance with NUREG 1022.
J18 PCOM OPT DATA RPT MARCH - 4 mm w,
. h' EYETEM ENERGY REEDLJRCEE. INC.
OJ.O D VWskEi.D EYJ@jecn3 April 14, 1987 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report AECM-87/0082 In accordance with the requirement of Technical Specification 6.9.1.10, System Energy Resources, Inc. (SERI) is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for March, 1987 (attachment).
If you have any questions or require additional information, please contact this office.
Yours ruly,
\\
ODK:mbi Attachment cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Helson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II o
101 Marietta St., N. W., Suite 2s)0 Atlarta, Georgia 303:3 l~su n o s1< m: j m, esaw J18AECM87040801 - 1 I
_ _ - _