AECM-86-0215, Monthly Operating Rept for June 1986
| ML20207C275 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/30/1986 |
| From: | Byrd R, Hobbs S, Kingsley O MISSISSIPPI POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| AECM-86-0215, AECM-86-215, NUDOCS 8607210320 | |
| Download: ML20207C275 (4) | |
Text
. - - -
.,. -. ~. -
i
{
Attachment to AECM-86/0215 1
i DOCKET NO.
50-416 DATE 7/14/86 COMPLETED BY S. H. Hobbs TELEPHONE 969-2458 j
OPERATING STATUS
]
1.
Unit Name: GGNS UNIT 1 l Notes:
l 2.
Reporting Period: June 1986 l
l 3.
Licensed Thermal Power (MWt): 3833 MWt l
l 4.
Nameplate Rating-(Gross MWe): 1372.5 MWe l
l 5.
Design Electrical Rating (Net MWe): 1250 MWe l
l 6.
Maximum Dependable Capacity (Gross MWe): 1157 MWe l
l 7.
Maximum Dependable Capacity (Net MWe): 1108 MWe l
l 1
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A t
i
- 10. Reasons For Restrictions, If Any: Unless otherwise noted, reductions in daily unit power level are for economic and system load demand considerations.
j This Month Yr to Date Cumulative l
- 11. Hours In Reporting Period 720 4,343 14,841
- 12. Number of Hours Reactor Was Critical 720 4,019.2 10,744.4 l
i
- 13. Reactor Reserve Shutdown Hours 0
0 0
}
4
- 14. Hours Generator On-Line 720 3,914.6 9,661.6
- 15. Unit Reserve Shutdown Hours 0
0 0
j
- 16. Gross Thermal Energy Generated (MWH) 2,279,760 R.541,809 26,498.302 i
- 17. Gross Electrical Energy Generated (MWH) 681,000 3,147,530 7,919,840 j
- 18. Net Electrical Energy Generated (MWH) 648,184 2,977,170 7,452,882 1
- 19. Unit Service Factor 100.0 90.1 75.4 i
- 20. Unit Availability Factor 100.0 90.1 75.4
- 21. Unit Capacity Factor (Using MDC Net) 81.3 61.9 58.0 J
- 22. Unit Capacity Factor (Using DER Net) 72.0 54.8 51.4 j~
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Durat. ion of Each):
- 23. Unit Forced Outage Rate 0
9.9 10.0 j
Refueling Outage; September 1986; approximately 60 days l
- 25. If Shut Down At End Of Report Period.
Estimated Date of St.artup:
- 26. Units In Test Status (Prior to Commercial Operation).
f Forecast Achieved i
l INITIAL CRITICALITY 08/18/82
]
INITIAL ELECTRICITY 10/20/84 i
COMMERCIAL OPERATION 07/01/85 J
G607210320 060630 i
PDR ADOCK 05000416 i
R PUR j
.3/cN' J16AECM86070901 - 3 l[j i
Attachment to AECM-86/0215 DOCKET NO. 50-416 UNIT 1
DATE 07/14/86 COMPLETED BY S. H. Hobbs TELEPHONE 969-2458 MONTH June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 705 17 974 2
795 18 974 3
918 19 977 4
928 20 972 5
919 21 941 6
916 22 951 7
694 23 960 l
8 684 24 964 9
855 25 964 10 939 26 950 11 942 27 935 12 950 28 647 13 953 29 832 14 934 30 951 15 926 31 16 956 0
J16AECM86070901 - 4
Attachment to AECM-86/0215 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-416 UNIT NAME 1
DATE 07/01/86 COMPLETED BY Ron Byrd TELEPHONE 437-2149 REPORT MONTH JUNE I
I I
I l
l l
l l
l l
l l
1 1
I I Method of I Licensee l
I I
Cause & Corrective l
l No. I Date i Type IDuration) Reason IShutting Down! Event i System IComponent I Action l
l I
1 (1) i Hours I
(2) l Reactor i Report #
l Code I
Code i
Prevent Recurrence l
I I
I I
I I
(3) l I
(4)
I (5) 1 I
I I
I l
I I
I I
I I
I I
I I
I i
186-08106/28/861 S I
0.0 i
B l
5 l
NA l
NA I
NA I Planned power reduction for l
l l
l l
l l
l l
l l control rod scram time l
I I
I I
I I
l l
l l test surveillance.
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination l
F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain)
- In accordance with NUREG 1022 J16AECM86070901 - 5
]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. BOX 16 4 0. J A C K S O N. MISSISSIPPl 39215-1640 July 15, 1986 O. D. KINGSLEY, JR.
VICE PRESIDENT NUCLE AR OPE R ATIONS Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Documelt Control Desk
Dear Mr. Taylor:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report AECM-86/0215 In accordance with 10CFR50.36, Mississippi Power & Light Company (MP&L) is providing twelve copies of the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for June,1986 (attachment).
If you have any questions or require additional information, please contact this office.
Yours
- uly,
/
ODK:bms Attachment cc:
Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Chief (w/2)
Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
((
J16AECM86070901 - 1 Member Middle South Utilities System