Monthly Operating Rept for Oct 1996 for Crngp
ML20134M138
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1996
From: Dao T, Kelley L
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1196-08, 3F1196-8, NUDOCS 9611220239
Download: ML20134M138 (5)


Text

.

Florida Power CORPORATION Oyuhd FDwar Unit 3 Dooks: Na 84302 J

November 12, 1996 3F1196-08 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk l

Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 October 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sin rely, D%

Larry C. Ke le Director, Nuclear Operat ons Site Support LCK/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager i

9611220239 961031 PDR ADOCK 05000302 R

PDR CRYSTAL RVER ENERGY COMPLEX: 15760 W Power uno St. Crystal River, Florida 344284708 (352) 7954486 A Florida Progress Company 220028

. ~..

OPERATING DATA REPORT 1

DOCKET No.

50-302 1

UNU FLCRP-3 DATE NOV 4,1996 l

COMPLETED BY T V Dao Metd q

TELEPHONE (352)795-6486 OPERATING STATUS a

1. UNIT NAME:.

CRYSTAL RIVER UNIT 3 -

2. REPORTING PERIOD:.

OCTOBER

3. LICENSED THERMAL POWER (MWt):....

2544 4.

NAMEPLATE RATING (GROSS MWe):..

. 890:

5. DESIGN ELECTRICAL RATING (NET MWe):...

825 1

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 -
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):..

818

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

N/A

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A i

i THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7'320.0 -

172,152.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 3,308.1 117.416.2' 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 -

0.0 1,280.6

14. HRS GENERATOR ON LINE

'O.0

- 3,109.5 -

115,328.7 -

15. UNIT DESERVE SHUTDOWN HOURS 0.0.

0.0

-- 0.0 -

16. GROSS THERMAL ENERGY GENERATED (MWH) 0'

' 7.465,052:

268,847,210 -

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2,547,840 91,894,033 -
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 2,417.371-

~

87,402,384 -

19. UNIT SERVICE FACTOR 0.0%

42.5 %

' 67.0%

20. UNIT AVAILABLE FACTOR 0.0%

- 42.5%

67.0 %

21. UNIT CAPACITY FACTOR (using MDC net) 0.0%

40.4 %

62.8 %

22. UNIT CAPACIT( FACTOR (using DER net) 0.0%

40.0%

61.5 %

23. UNIT FORCED OUTAGE RATE 100.0 %

39.2 %

' 10.1%

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Lube oil outage until February 28,1997 to implement modifications to improve various safety margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

FEBRUARY 28,1997

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICIT(

NA NA COMMERCIAL OPERATION NA NA

_.. - ~.,.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLCRP-3 DATE NOV 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0-17 0

2

'O 18 0.

3 0

19 0

4 0:

20 0

5 21 0-6 0-22 0-7

.0 23

'O-8 0

24 0

9 0

25 0

10

-O 26 0-11

-0 27

'O.

12

0 28 0

13-0 29 0-14 0-30 0

15 0

31 0

16

'O INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNIT FLCRP-3 REPORT MONTH. OCTOBER DATE NOV 4,1998 COMPLETED BY T V Dao -

TELEPHONE (352)795-4486 -

NO.

DATE TYPE (1)

DURATION REASON (2)

METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4)

CODE (5)

ACTION TO PREVENT '

DOWN REACTOR (3) REPORT #

RECURRENCE 96-27 961001 F

745 D

4 96-020-00 EE ENGINE Reactor remained in cold shutdown to prepare for modifications to improve various safety margins.

1 2

3 4

5 F: FOFCED REASON-METHOD EXHST O -INSTRUCTIONS EXHIBIT I-SMAE SOURCE S: SCHEDULED A--EQUtPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCHAM ENTRY SHEETS FOR LBCENSEE C-REFUELING 3-AUTO SCRPM EVENT REPORT (LEFQ FILE D4tEGULATORY FESTRICTION 4-CONTINUED (NUREG-0181)

E-OPERATOR TFIANNO &

6-REDUCED LOAD LICENSE ADMMSTRATION S-OTHER F.ADMNSTRATION G-OPERATIONAL EfWOR H-O HER

l l.

l MONTHLY OPERATIONAL

SUMMARY

STATEMENT l

DOCKET NO.

50-302 UNIT FLCRP-3 DATE NOV 4,1996 j

COMPLETED BY T V Dao TELEPHONE (352) 795-6486 I

MONTH: OCTOBER

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through October to resolve the emergency diesel generator maximum electrical loading issue and to prepare for modifications to improve various safety margins.