Florida Power CORPORATION Oyuhd FDwar Unit 3 Dooks: Na 84302 J
November 12, 1996 3F1196-08 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk l
Washington, DC 20555-0001
Subject:
Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit-3 October 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.
Sin rely, D%
Larry C. Ke le Director, Nuclear Operat ons Site Support LCK/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager i
9611220239 961031 PDR ADOCK 05000302 R
PDR CRYSTAL RVER ENERGY COMPLEX: 15760 W Power uno St. Crystal River, Florida 344284708 (352) 7954486 A Florida Progress Company 220028
. ~..
OPERATING DATA REPORT 1
DOCKET No.
50-302 1
UNU FLCRP-3 DATE NOV 4,1996 l
COMPLETED BY T V Dao Metd q
TELEPHONE (352)795-6486 OPERATING STATUS a
- 1. UNIT NAME:.
CRYSTAL RIVER UNIT 3 -
- 2. REPORTING PERIOD:.
OCTOBER
- 3. LICENSED THERMAL POWER (MWt):....
2544 4.
NAMEPLATE RATING (GROSS MWe):..
. 890:
- 5. DESIGN ELECTRICAL RATING (NET MWe):...
825 1
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 -
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):..
818
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A i
i THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745.0 7'320.0 -
172,152.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 3,308.1 117.416.2' 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 -
0.0 1,280.6
- 14. HRS GENERATOR ON LINE
'O.0
- 3,109.5 -
115,328.7 -
- 15. UNIT DESERVE SHUTDOWN HOURS 0.0.
0.0
-- 0.0 -
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0'
' 7.465,052:
268,847,210 -
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2,547,840 91,894,033 -
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 2,417.371-
~
87,402,384 -
- 19. UNIT SERVICE FACTOR 0.0%
42.5 %
' 67.0%
- 20. UNIT AVAILABLE FACTOR 0.0%
- 42.5%
67.0 %
- 21. UNIT CAPACITY FACTOR (using MDC net) 0.0%
40.4 %
62.8 %
- 22. UNIT CAPACIT( FACTOR (using DER net) 0.0%
40.0%
61.5 %
- 23. UNIT FORCED OUTAGE RATE 100.0 %
39.2 %
' 10.1%
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Continuation of the Lube oil outage until February 28,1997 to implement modifications to improve various safety margins.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
FEBRUARY 28,1997
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICIT(
NA NA COMMERCIAL OPERATION NA NA
_.. - ~.,.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE NOV 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0-17 0
2
'O 18 0.
3 0
19 0
4 0:
20 0
5 21 0-6 0-22 0-7
.0 23
'O-8 0
24 0
9 0
25 0
10
-O 26 0-11
-0 27
'O.
12
- 0 28 0
13-0 29 0-14 0-30 0
15 0
31 0
16
'O INSTRUCTIONS:
On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 UNIT FLCRP-3 REPORT MONTH. OCTOBER DATE NOV 4,1998 COMPLETED BY T V Dao -
TELEPHONE (352)795-4486 -
NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4)
CODE (5)
ACTION TO PREVENT '
DOWN REACTOR (3) REPORT #
RECURRENCE 96-27 961001 F
745 D
4 96-020-00 EE ENGINE Reactor remained in cold shutdown to prepare for modifications to improve various safety margins.
1 2
3 4
5 F: FOFCED REASON-METHOD EXHST O -INSTRUCTIONS EXHIBIT I-SMAE SOURCE S: SCHEDULED A--EQUtPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCHAM ENTRY SHEETS FOR LBCENSEE C-REFUELING 3-AUTO SCRPM EVENT REPORT (LEFQ FILE D4tEGULATORY FESTRICTION 4-CONTINUED (NUREG-0181)
E-OPERATOR TFIANNO &
6-REDUCED LOAD LICENSE ADMMSTRATION S-OTHER F.ADMNSTRATION G-OPERATIONAL EfWOR H-O HER
l l.
l MONTHLY OPERATIONAL
SUMMARY
STATEMENT l
DOCKET NO.
50-302 UNIT FLCRP-3 DATE NOV 4,1996 j
COMPLETED BY T V Dao TELEPHONE (352) 795-6486 I
MONTH: OCTOBER
SUMMARY
STATEMENT:
Crystal River remained in cold shutdown through October to resolve the emergency diesel generator maximum electrical loading issue and to prepare for modifications to improve various safety margins.