3F1086-07, Monthly Operating Rept for Sept 1986
| ML20215F315 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/30/1986 |
| From: | Graham D, Stewart S, Widell R FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F1086-07, 3F1086-7, NUDOCS 8610160152 | |
| Download: ML20215F315 (6) | |
Text
m O
OPERATING DATA REPORT LJ DOCKET NO.
50-302 DATE 10/2/66 COMPLETED BY D. Graham TELEPilONE (904) 795-3802 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes
- 2. Reporting Period:
9/1/86 - 9/30/86
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
821
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA NA
- 9. Power Level To Which Restricted,if Any (Net MWe):
NA
- 10. Reasons For Restrictions. If Any:
ye -
This Month Yr.-to.Date Cumulative i1. Hours in Reporting Pesiod 720 6551 83735
- 12. Number Of Hours Reactor Was Critical 720 2497.9 52798.9
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 720 2477.2 51568
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1573273 5764902 116233767
- 17. Gross Electrical Energy Generated (MWH) 537357_
1985906 39742208
- 18. Net Electrical Energy Generated (MWH) 509180 1886692 37746278
- 19. Unit Sersice Factor 100%
37.8%
61.6 %
- 20. Unit Availability Factor 100 %
37.8%
61.6 %
- 21. Unit Capacity Factor (Using MDC Net) 86.1 %
35.1%
56.4 %
j 22 Unit Capacity Factor (Using DER Net) 85.7 %
34.9 %
54.6 %
- 23. Unit Forced Outage Rate 0%
62.2 %
23.6 %
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eachl:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 1/14/77 INITIA L ELECTRICITY l/30/77 l
COMMERCIAL OPER ATION 3/13/77 8610160152 860930
[h DR ADOCK 0500 2
- ggf77,
< /<
AVER AGE DAILY UNIT POWER LEVEL rm()
DOCKET NO.
50-302 FLCRP-3 WIT DATE j0/2/86 COMPLETED BY D. Grnhnm TELEPHONE (904) 795-3802 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(Mwe. Net) 1 823 37 650 2
830 18 601 773 3
39 601 4
820 20 597 5
712 21 671 6
795 22 834
/
7 753 23 822 8
549 24 818 9
578 25 818 425 825 10 26 468 814 33 27 449 822 i;
73 590 74I 13 29 723 14 30 808 821 15 3,
16 687 INSTRUCTIONS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month.Comput..o the nearest whole megawatt.
(9/77) v
{
4
50-302 a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME F I,C R P-3 DATE 10/3/86 9/86 COMPLETED BY S. A. Stewart REPORT MONTH TELEPHONE (904) 795-3802 i
E 2
l
.$ ?
3 j E5 Licensee
,E*
g, cause & Corrective j
No.
Date g
3g y
.3 g &
Event g'g f]
a.
Action to
$E E
jgg Report #
mO Present Recurrence ci a
86-12 860903 F~
0.0 A
5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "A" waterbox.
I 86-13 860905 F
0.0 A
5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "C" waterbox.
86-14 860907 F
0.0 B
5 NA IIF IITEXCII Cleaned barnacles from Secondary Services heat exchanger.
86-15 860908 F
0.0 A
5 NA IIF IITEXCII Ifigh vibration alarm on Circulating Water Pump - 1B. Replaced shaft bearings.
86-16 860910 F
0.0 A
5 NA IIC llTEXCII Reduced power to locate and repair a condenser salt leak in the "C" waterbox.
i 86-17 860912 F
0.0 A
5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "D" waterbox.
86-18 860016 F
0.0 A
5 NA IIC IITEXCII Reduced power for. salt leak in."A" waterbox.
I 2
3 4
f F: Forced Reason:
Method Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Maintenance of Test
,2g*
- g 2 M n al Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) File (NURI:G-D-Regulatory Restriction 4-continued 0161)
E-Operator Training & ljcense Examination 5-Reduced toad 9-Other F-Administrat'ive,..
G Operational Ertur'(Explain) 7
..' " ',. L..
Exhibit I Same Source (9/77)
Il Other (Explain)
N
/*
s s
e 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
NM UNIT NAME DATE 10/3/RR REPORT MONTH 9/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 Page 2 "i
.! ?
'h h
Licensee E*
k*".
Cause & Correceive No.
Date h
5g i
2s5 Event sT Action to E
j ;f3 g Report #
N0 Present Recurrence d
86-19 860917 F
0.0 B
5 NA IIC IITEXCII Reduced power to install sacrificial metal grating in all four waterboxes.
86-20 860929 F
0.0 A
5 NA IIII MOTORX Repaired Condensate Pump-1 A due to worn electrical brushes.
i s
1 2
3 4
F: Forced Reason:
Ma+had Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data
,_n g
B. Maintenance or Test 2-MaUalScram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Repor ILER) FileINURIG.
D Regulatory Restriction 4-continued 0161)
E Operator Training & License Examination 5-Reduced Load 9-Other F-Ad'ministrative..
3 G-Operational Ertut'(Explain) 7 ' ' ',;. ' *. T. T-..
Exhibit I - Same Source 19/77)
Il-Osher (Explain)
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT F LC RP-3 DATE 10/2/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH September
SUMMARY
STATEMENT:
Crystal River 3 remained on-line the entire month. Several condenser salt leaks forced a reduction in power during the month.
O h
en-O
=
I
[O Si Florida Power C O R PO R ATIO N October 8, 1986 3F1086-07 Mr. James M. Taylor, Di rector Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 M
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 September 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Should there be any questions, please contact this office.
Sincerely, Manage $ Widell Rol f r, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc:
Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 Z6M St. Petersburg, Florida 33733 * (813) 866-5151 GENERAL OFFICE: 3201 Thirty. fourth Street South
- P.O. Box 14042
- A Florida Progress Company