3F0903-01, August 2003 Monthly Operating Report for Crystal River, Unit 3

From kanterella
(Redirected from 3F0903-01)
Jump to navigation Jump to search
August 2003 Monthly Operating Report for Crystal River, Unit 3
ML032600938
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/09/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0903-01
Download: ML032600938 (3)


Text

Progress Energy Docket No. 50-302 Operating Ucense No. DPR-72 Ref: ITS 5.7.1.2 September 9, 2003 3F0903-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) August 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager LL-tl' Progress Energy Florida. Inc.

Crystal River Nuclear Plant 15760 W owerline Street Crystal River, FL 34428

4 1 -- ~

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 September 2. 2003 J. E. Lane A(

CJ >

(352) 7956486 x-698 August 2003 REPORTING PERIOD (Month/Year):

MONTH 860 834 YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 3 NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 627,104 5,831.0 5,831.0 0.0 4,941,912 163,946 161,646 0

126,211,483

.. I Y. -,$

1.

Al I II f

i APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE September 2,2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

August 2003 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting l______

S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(I) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING / UCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION MOTHER (Explain)