Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 June 14,2004 3F0604-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - May 2004 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) May 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
HA. Franke lant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428
APPENDIX A OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 June 1, 2004 K.V. Dyer x3494 (352) 795-4/86 x3494 REPORTING PERIOD (MonthlYear):
May 2004 MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 860 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 635,435 3,597.2 3,575.3 0.0 3,061,834 169,668.5 167,302.9 0
130,910,835
- NOTE* On May 1, 2004, the pressurizer power operated relief valve (PORV) momentarily passed steam. This occurred when the PORV block valve was re-opened after being closed for 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The block valve had been closed to validate indications that the PORV was leaking slightly into its discharge drain line. The PORV operated as designed.
- o.
P APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE June 1. 2004 COMPLETED BY K.V. Dyer TELEPHONE (352) 795-6486 x3494 REPORTING PERIOD:
May 2004 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (ExValn)
I-MAINTENANCEOR TEST C-REFUEUNG D-REGULATORY IRESTRICTON EOPERATOR TRAINING I UCENSE EXAMINATION F ADMINISTRATIVE G34PERATIONAL ERROR (Explaln)
H-OTHER (Eiplain)
(2) Method 1-AANUAL 2-MANUAL TRIPI SCRAM 3-AUTO TRiP /sCRAM 4CONTINUATION 5-UTHER (Enpa)