Cn Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 April 8,2005 3F0405-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - March 2005 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) March 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely, J. A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428
,'I-
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Aprili 2005 COMPLETED BY J. E. Lane 1'y TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):
March 2005 MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 860 2
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 176,844.3 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 174,472.6 5
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6
NET ELECTRICAL ENERGY GENERATED (MWH) 640,285 1,859,540 137,011,850
. t, J
r APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE April 1, 2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
March 2005 No.
Date Type Duration Reason Method of Cause / Corrective Actions
- .
- ur F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING / UCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method I-MANUAL 2-MANUALTRIP ISCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explahi)