Entergy Operations, Inc. 1448 SR 333, Russellville, AR 72802 10 CFR 50.71(e) 0CAN062302 June 20, 2023 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
10 CFR 50.71(e) Report Revision 22 of the ANO Fire Hazards Analysis Arkansas Nuclear One - Units 1 and 2 NRC Docket Nos. 50-313 and 50-368 Renewed Facility Operating License Nos. DPR-51 and NPF-6 In accordance with 10 CFR 50.71(e), enclosed is a copy of Revision 22 to the Arkansas Nuclear One (ANO) Fire Hazards Analysis (FHA), which is common to both ANO units. The FHA is part of the ANO Safety Analysis Reports (SAR). The ANO-1 SAR is being submitted in accordance with 10 CFR 50.71(e) under separate cover.
Pursuant to 10 CFR 50.71(e)(4), the FHA is being submitted within six months following the previous ANO-1 refueling outage (1R30) which ended December 30, 2022. The Enclosure to this letter contains the FHA. Attachment 1 to the enclosure provides a summary of changes to the FHA.
Associated in part with post September 11, 2001, response related to security sensitive information, Entergy has reviewed the FHA and determined that it does not contain information required to be withheld from public disclosure with respect to NRC Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents."
This letter contains no new commitments. If you have any questions or require additional information, please contact the Manager, Regulatory Assurance, Riley Keele at 479-858-7826.
Joseph C. Sullivan Site Vice President Arkansas Nuclear One Tel 479-858-3110
0CAN062302 Page 2 of 2 I hereby certify that to the best of my knowledge and belief, the information contained in the enclosed Licensing Basis Document accurately reflects changes made since previous submittals. The changes to the FHA reflect information and analyses submitted to the Commission, prepared pursuant to Commission requirements, or made under the provisions of 1 0 CFR 50.48 and/or 1 0 CFR 50.59. Executed on June 20, 2023.
Respectfully, JCS/mar
Enclosure:
ANO Fire Hazards Analysis Revision 22
Attachment:
Summary of Fire Hazards Analysis Changes cc:
NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager-Arkansas Nuclear One Designated Arkansas State Official