05000397/LER-2016-004, Regarding Automatic Scram Due to Off-Site Load Reject

From kanterella
Jump to navigation Jump to search

Regarding Automatic Scram Due to Off-Site Load Reject
ML17046A177
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/15/2017
From: Hettel W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-17-051 LER 16-004-00
Download: ML17046A177 (4)


LER-2016-004, Regarding Automatic Scram Due to Off-Site Load Reject
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation
3972016004R00 - NRC Website

text

ENERGY NORTHWEST U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 W. Grover Hettel Columbia Generating Station P.O. Box 968, PE23 Richland, WA 99352-0968 Ph. 509.377.8311IF.509.377.4150 wghettel@energy-northwest.com 10 CFR 50.73

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSEE EVENT REPORT NO. 2016-004-00

Dear Sir or Madam:

Transmitted herewith is Licensee Event Report No. 2016-004-00 for Columbia Generating Station. This report is submitted pursuant to 10 CFR 50.73(a)(2)(iv)(A).

There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Ms. D.M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.

Executed on Fffe,, ALd. IS JD 1 I J

Respectfully, W~~

W. G. Hettel Vice President, Operations

Enclosure:

Licensee Event Report 2016-004-00 cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident lnspector/988C CD Sonoda-BPA/1399 WA Horin -Winston & Strawn February 15, 2017 GO2-17-051

NRC FORM366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0104 EXPIRES: 10/31/2018 (06-2016)

Estimated burden per response to comply with this mandatory collection request 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

'¥"

Reported lessons learned are incorporated into the licensing process and fed back to industry.

LICENSEE EVENT REPORT (LER)

Send comments regarding burden estimate to the FOIA, Privacy and Information Collections

\\ )

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail (See Page 2 for required number of digits/characters for each block) to fnfocoffects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. ff a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currenUy valid OMB control htl1;r /lwww ore gov/[eadiog-rmldoc-coll~ctioos/mi[egs/staff/sr1022/r3D.

number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

3. PAGE Columbia Generating Station 05000 397 1 OF 3
4. TITLE Automatic Scram Due to Off-site Load Reject
6. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED I

SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR NUMBER NO.

05000 FACILITY NAME DOCKET NUMBER 12 18 2016 2016 -

004 - 00 02 15 17 05000

9. OPERA TING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)

D 20.2201(b>

D 20.2203(a}(3}(i>

D 50. 73(a}(2}(ii}(A}

D 50.73(a}(2}(viii}(A}

1 D 20.2201(d}

D 20.2203(a}(3}(ii}

D 50. 73(a}(2}(ii}(B}

D 50. 73(a}(2}(viii}(B}

D 20.2203(a}(1>

D 20.2203(a}(4>

D 5o. 73(a}(2}(iii>

D 50.73(a}(2}(ix}(A}

D 20.2203(a}(2}(i}

D 50.36(c}(1}(i}(A}

[Z] 50. 73(a}(2}(iv}(A}

D 50.73(a}(2}(x}

1 O. POWER LEVEL D 20.2203(a}(2}(ii}

D 50.36(c}(1}(ii}(A}

D 50. 73(a}(2}(v}(A}

D 13.11(a><4>

D 20.2203(a}(2}(m>

D 5o.3s(c)(2)

D 50. 73(a}(2}(v}(B}

D 13.11(a}(5)

D 20.2203(a}(2}(iv)

D 5o.4s(a}(3}(ii)

D 50.73(a}(2}(v}(C)

D 13.77(a}(1>

100 D 20.2203(a)(2)(v}

D 50. 73(a}(2)(i)(A)

D 50. 73(a)(2}(v)(D)

D 13. 11ca}(2}(i)

D 20.2203(a)(2}(vi)

D 50. 73(a)(2)(i)(B)

D 50. 73(a)(2)(vii)

D 13.77(a}(2}(ii)

D 50. 73(a}(2}(i)(C)

D OTHER Specify in Abstract below or in

Assessment of Safety Consequences

This event did not challenge the ability of Columbia Generating Station to safely shutdown, and all plant systems responded as designed. Human performance issues resulted in a trip of RCIC, and an automatic transfer of power supplies to backup power supplies per design. The reactor scram and resulting transient caused a loss of RPS which resulted in a full safety system actuation and a reduction of cooling to the PC. The trip of RCIC was not consequential since HPCS was available, and was used, to maintain RPV level. The power supplies transferred to backup power supplies as designed. The reduction of cooling to the PC did not challenge PC integrity, and was restored by operator action. There were no adverse impacts to those systems due this event. There were no undesired radiological or industrial safety aspects resulting from this event.

Energy Industry Identification System Information Energy Industry Identification System information codes from IEEE Standards 805-1984 and 803-1983 are represented in brackets as [X] and [XX] throughout the body of the narrative. Page 3

of 3