05000325/LER-1917-003, Regarding Control Room Air Conditioning and Emergency Ventilation Systems Rendered Inoperable
| ML17215A760 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/02/2017 |
| From: | William Gideon Duke Energy Progress |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BSEP 17-0063 LER 17-003-00 | |
| Download: ML17215A760 (6) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i) |
| 3251917003R00 - NRC Website | |
text
William R. Gideon Vice President Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 o: 910.457.3698 10 CFR 50.73 August 2, 2017 Serial: BSEP 17-0063 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Licensee Event Report 1-2017-003 In accordance with the Code of Federal Regulations, Title 10, Part 50.73, Duke Energy Progress, LLC, submits the enclosed Licensee Event Report (LER). This report fulfills the requirement of 10 CFR 50.73(a)(1) for a written report within sixty (60) days of a reportable occurrence.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
William R. Gideon SWR/swr Enclosure: Licensee Event Report 1-2017-003
U.S. Nuclear Regulatory Commission Page 2 of 2 cc (with enclosure):
U. S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Gale Smith, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrc.gov Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net
NRC FORM 366 (04-2017)
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (04-2017)
LICENSEE EVENT REPORT (LER)
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 03/31/2020
, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME Brunswick Steam Electric Plant (BSEP) Unit 1
- 2. DOCKET NUMBER 05000325
- 3. PAGE 1 OF 4
- 4. TITLE Control Room Air Conditioning and Emergency Ventilation Systems Rendered Inoperable
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.
MONTH DAY YEAR FACILITY NAME Brunswick Unit 2 DOCKET NUMBER 05000324 06 05 2017 2017 - 003
- - 00 08 02 2017 FACILITY NAME DOCKET NUMBER 05000
- 9. OPERATING MODE
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 1 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x)
- 10. POWER LEVEL 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(v)(A) 73.71(a)(4) 100 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(C) 73.77(a)(1) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(D) 73.77(a)(2)(i) 20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(vii) 73.77(a)(2)(ii) 50.73(a)(2)(i)(C)
OTHER Specify in Abstract below or in Page 4 of 4 LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET The duration of this condition was 15 minutes. During that time, Control Room temperature, humidity, and radiation experienced no significant change, and there was no challenge to the habitability of the Control Room. Therefore, it is concluded that this event had no adverse impact on nuclear safety.
Corrective Actions
Any changes to the corrective actions and schedules noted below will be made in accordance with the site's corrective action program.
Corrective actions for this event include restoring the affected pneumatic supply to CREV and Control Room AC, revising work orders, taking steps to emphasize proper use of human performance tools, and performing a Maintenance cultural assessment. These actions are completed.
Planned corrective actions include performing a review of top latent organizational weaknesses and implementing a pilot for a fleet proficiency model. These actions are scheduled for completion by September 6, 2017.
Previous Similar Events
One event has been reported in the past three years in which the Control Room AC system was inoperable. That event was reported in Licensee Event Report 50-325/2016-006, dated February 13, 2017. That event resulted from corrosion which affected the seismic qualifications of supports for the air conditioning condensers. The corrective actions which addressed the failure were unrelated to the cause of the event described in this report.
Commitments
This report contains no new regulatory commitments.