05000321/LER-1982-087, Forwards LER 82-087/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-087/03L-0
ML20066E980
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/02/1982
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20066E981 List:
References
PM-82-1101, NUDOCS 8211170357
Download: ML20066E980 (1)


LER-1982-087, Forwards LER 82-087/03L-0
Event date:
Report date:
3211982087R00 - NRC Website

text

- _ _ _ - _ _ _ _ _ -.

h.,,

Georgia Powe'r Company Post Office Box 439 Baxley, Georgia 31513 e

Telephone 912 367 7781 912 537-9444 Georgia Pbwer Edwin 1. Hatch Nuclear Plant November 2, 1982 PM-82-1101 o

- o PLANT E.

I.

IIATCl!

3

3. --

Licensee Event Report zAO Docket No. 50-321 g,

C m y

s "N

United States Nuclear Regulatory Commission EEE Office of Inspection and Enforcement az Region II, Suite 3100

.r_

.),

101 Marietta Street C

Atlanta, Georgia 30303 ATTENTION:

Mr. James P. O'Reilly Pursuant to Section 6.9.1.9.a. of Hatch Unit One Technical Specifications, please find attached Reportable Occurrence Report No. 50-321/1982-087.

I@-C-ed 2

H.

C. Nix

/

Plant Mana{ger 1

IICN/SBT/abb xc:

R. J.

Kelly G. F. IIead J. T.

Beckham, Jr.

P. D. Rice K. M. Gillespie S.

B.

Tipps i

ofrYg'CO

- 9 R.

D.

Baker Control Room p

Document Control y

p "821117d357 821102 PDR ADOCK 05000322 g

PDR