05000269/LER-2011-006-01, Regarding Pressurizer Heater Capacity Non-Compliant with Technical Specification 3.4.9

From kanterella
Jump to navigation Jump to search
Regarding Pressurizer Heater Capacity Non-Compliant with Technical Specification 3.4.9
ML12151A280
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/29/2012
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 11-006-01
Download: ML12151A280 (7)


LER-2011-006, Regarding Pressurizer Heater Capacity Non-Compliant with Technical Specification 3.4.9
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2692011006R01 - NRC Website

text

T. PRESTON GILLESPIE, JR.

Energy Vice President O

EOconee Nuclear Station Duke Energy ONOl VP / 7800 Rochester Hwy.

Seneca, SC 29672 864-873-4478 864-873-4208 fax T. Gillespie@duke-energy. corn May 29, 2012 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Oconee Nuclear Station (ONS) Units 1 and 2 Docket Nos.: 50-269, 50-270 Licensee Event Report 269/2011-06, Revision 1 Problem Investigation Program No: 0-10-08094, 0-11-6700 and 0-12-2655 Gentlemen:

Pursuant to 10 CFR 50.73 Sections (a)(1) and (d), please find attached Licensee Event Report (LER) 269/2011-06, Revision 1, regarding the inoperability of the Unit 1 and Unit 2 pressurizers due to insufficient emergency-powered heater capacity that exceeded the three (3) days allowed by Technical Specification (TS) 3.4.9 Condition 'C.' Consequently, this report is being submitted in accordance with 10 CFR 50.73(a)(2)(i)(B), as an operation prohibited by the ONS Technical Specifications. This report has been revised to add the root cause and corrective actions for this adverse condition which were not available for Revision 0 of the report. In addition, the safety analysis has been updated since risk assessment results are no longer preliminary as they were in Revision 0.

There are no regulatory commitments contained in this report.

Any questions regarding the content of this report should be directed to Kent Alter, ONS Regulatory Compliance Group Manager, at 864-873-3255.

Sincerely, T1' ILL&SfIC T. Preston Gillespie, Jr.

Vice President Oconee Nuclear Station Attachment www. duke-energy. corn

Document Control Desk May 29, 2012 Page 2 cc:

Mr. Victor McCree Administrator, Region I1 U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. John P. Boska, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, MD 20852 Mr. Andrew Sabisch NRC Senior Resident Inspector Oconee Nuclear Station INPO (Word File via E-mail)

Abstract

An extent of condition review associated with the temperature induced trip of Standby Shutdown Facility pressurizer (PZR) heater panel board breakers inside containment determined that during a loss-of-offsite-power (LOOP) event, the power supply breakers in each unit's east penetration room, supplying PZR Heater Groups 'A' and 'E' through 'K', may trip on thermal overload due to elevated ambient temperature in the penetration room.

Technical Specification (TS) 3.4.9 requires a minimum of 400 kilowatts of PZR heaters be Operable and capable of being powered from an emergency power supply. However, the above described review determined that the total available emergency-powered heater capacity did not comply with TS 3.4.9 for Unit 1 and Unit 2. This condition has existed since March 2005, which exceeds TS 3.4.9 Action Condition

'C' 72-hour completion time. Thus, this condition is reported in accordance with 10 CFR 50.73(a)(2)(i)(B),

as an operation prohibited by TSs.

An alternate configuration of breakers and in-service heaters was developed and implemented that restored compliance with TS 3.4.9. Actions to prevent recurrence include planned changes to documents that will strengthen design evaluation processes.

NRC FORM 166A U.S. NUCLEAR REGULATORY COMMISSION (10-2010)

LICENSEE EVENT REPORT (LER)

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE SEQUENTIAL REVISION YEAR NUMBER NUMBER 05000-Oconee Nuclear Station (ONS) Unit 1 269 2011 06 01 2

of 5

17. NARRATIVE

BACKGROUND:

The pressurizer [PZR] heaters [HTR] replace heat lost during normal steady state operation, raise the pressure to normal operating pressure during Reactor Coolant System (RCS)[AC] heatup from the cooled-down condition, and restore system pressure following transients. The heaters are arranged into four banks, which are then divided into 11 groups. Pressurizer heater input may decrease over the course of an operating cycle due to tripped breakers [52] or burnt elements. A minimum required heater capacity, capable of being powered from an emergency power source (EPS), is necessary to offset these losses and ensure that RCS pressure can be maintained.

Technical Specification (TS) 3.4.9, "Reactor Coolant System - Pressurizer," Limiting Condition for Operation (LCO) requires a minimum of 400 kilowatts (kW) of pressurizer heaters be Operable and capable of being powered from an EPS. If pressurizer heater capacity capable of being powered from an EPS is < 400 kW, TS 3.4.9 Action Condition 'C' specifies a 72-hour completion time (CT) to restore the pressurizer heater capacity to a minimum of 400 kW. If the CT cannot be met, TS 3.4.9 Action Condition 'D' requires the unit be shutdown to Mode 4 conditions with RCS temperature </= 325 degrees Fahrenheit (F) within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

This event is reportable per 10 CFR 50.73(a)(2)(i)(B) as an operation prohibited by Technical Specifications. At the time of this event, both Unit 1 and Unit 2 were operating in Mode 1 at approximately 100% power. No systems, structures, or components were out of service that contributed to this event.

EVENT DESCRIPTION

On July 8, 2011, during an extent of condition review associated with the temperature response trip of Standby Shutdown Facility (SSF)[NB] pressurizer heater panel board [BD] breakers inside containment, an unanalyzed condition was discovered relative to the load current rating of power supply breakers that supply Pressurizer Heater Groups 'A' and 'E' through 'K.' The power supply breakers to these pressurizer heater groups are located in motor control centers (MCCs)[MCC] in the East Penetration Room for each unit and are molded case circuit breakers rated for 50 degrees Centigrade (C) ambient conditions. However, during a loss-of-offsite-power (LOOP) event, the maximum ambient temperature in each unit's East Penetration Room could rise to approximately 60 degrees C (i.e., 140 degrees F) due to loss of the 'C' and 'D' chillers [CHU]. Thus, these pressurizer heater power supply breakers, on all three units, may trip on thermal overload due to the elevated ambient temperature in the East Penetration Rooms. Duke Energy Carolinas, LLC (Duke Energy) determined that the loss of pressurizer heater groups during a LOOP event results in violation of the TS LCO 3.4.9.b minimum 400 kW heater capacity requirement for Unit 1 (233 kW) and Unit 2 (341 kW). Unit 3 (439 kW) adheres to the minimum pressurizer heater capacity requirement during a LOOP event.

A reportability review of this adverse condition, completed on August 11, 2011, determined that in the past three years, there is evidence that the condition existed for longer than the TS 3.4.9 Action Condition 'C' 72-hour CT.

Further review determined that the adverse condition existed since implementation of License Amendments 343, 345, and 344 for Unit 1, Unit 2, and Unit 3, respectively. These license amendments changed the TS LCO 3.4.9.b minimum pressurizer heater capacity value from "126" to "400" kW. The Nuclear Regulatory Commission (NRC) approved these license amendments in March 2005. Consequently, this adverse condition is reportable as a condition prohibited by Technical Specifications pursuant to 10 CFR 50.73(a)(2)(i)(B).

NRC FORM 166A U.S. NUCLEAR REGULATORY COMMISSION (10-2010)

LICENSEE EVENT REPORT (LER)

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE SEQUENTIAL REVISION YEAR NUMBER NUMBER 05000-Oconee Nuclear Station (ONS) Unit 1 269 2011 06 01 3

of 5

17. NARRATIVE CAUSAL FACTORS:

The pressurizer heater power supply breakers were not evaluated for their new purpose (i.e., to function during elevated ambient temperature in a LOOP event) when ONS converted to Improved Technical Specifications (ITS) in 1998. ITS added a new TS LCO requirement (3.4.9.b) for a minimum pressurizer heater capacity (126 kW) powered from an EPS. In addition, ONS failed to adequately evaluate the effects of increasing the 126 kW minimum pressurizer heater capacity requirement to 400 kW in a 2003 license amendment request.

Thus, the root cause for this adverse condition is incomplete process guidance that does not clearly require re-analysis of re-purposed equipment to ensure that it will function under any new conditions.

CORRECTIVE ACTIONS

As a measure to restore compliance with TS LCO 3.4.9.b, on July 11, 2011, selected pressurizer heater breakers were opened in Unit 1 and Unit 2 Reactor Buildings that reduced the total heater load on each associated supply breaker in the MCCs located in the East Penetration Rooms such that the resulting load current ensures the MCC supply breakers do not trip on thermal overload during a LOOP event. The alternate configuration of heater breakers and in-service pressurizer heaters restored pressurizer heater capacity to Operable status on Unit 1 and Unit 2.

Corrective actions to address the root cause and prevent recurrence are as follows:

Planned corrective actions

Revise Engineering Directive Manual (EDM) 601 (Engineering Change Manual) to:

O require a design evaluation when a proposed change alters the design function or the design requirements of a system, structure, or component (SSC) without any physical change; O specify what design functions are and that design changes are required when an SSC's design basis is modified; and o

add a new question to the Equipment Qualification screening appendix which will ask if a change involves design/licensing basis changes that imply that an existing SSC has a new or altered function or design requirement.

Revise the Nuclear System Directive (NSD) 301 (Engineering Change Program) to:

o require a design evaluation when a proposed change alters the design function or the design requirements of an SSC without any physical change; and o

specify what design functions are and that design changes are required when an SSC's design basis is modified.

Completed corrective actions

Revised NSD-227 on communicating with the NRC adding a new responsibility for the Technical Lead (Originator) to ensure that no material statements change the design basis of the plant without processing an Engineering Change.

Revised the Compliance Functional Area Manual Section 3.17 (Licensing Resource Manual), adding an example to the roles and responsibilities of the Technical Lead. The example describes that even if existing plant equipment is capable of performing new design functions, an engineering change is

required when design functions are changed to ensure that configuration control is maintained with regards to documenting the new licensing/design basis requirements.

Engineering issued a design deliverable document identifying the revised pressurizer heater breaker configuration.

EXTENT OF CONDITION:

The MCCs that feed the power supply breakers in question are limited to MCC 'XH', 'XI', 'XJ' and 'XK' on each unit. These MCCs feed the pressurizer heater loads and some motor starters [MSTR] for Feedwater [SJ] and Containment Purge [VA] motor-operated valves [ISV]. Only the pressurizer heaters are required to function for a LOOP event. A walk down of the East Penetration Rooms on each unit was performed to identify any additional breakers beyond those in MCCs 'XH', 'XI', 'XJ' and 'XK.' In the Unit 1 East Penetration Room, there are two panel boards with molded case circuit breakers, which are lighting panel board '1Ll0' and power panel board 'IKF.' In the Unit 2 East Penetration Room, there are two panel boards with molded case circuit breakers, which are lighting panel board '2L10' and power panel board '2KD.' In the Unit 3 East Penetration Room, there are two panel boards with molded case circuit breakers, which are lighting panel board '3L10' and power panel board '3KF.' In all of these panel boards, there are no loads on the panel boards that are required during or after a LOOP event.

In addition to the power supply breakers, the cabling [CBL5] and electrical penetrations [PEN] associated with the pressurizer heaters are also exposed to the elevated temperature in the East Penetration Room. An evaluation of the cables and electrical penetrations determined that both are fully capable of providing their intended functions during a LOOP event.

There are other components/equipment (valves [V], instrumentation, electrical penetrations, etc.) located in the East Penetration Rooms that are required to function during or after a loss of coolant accident (LOCA)/LOOP event. As such, this equipment is scoped into the Environmental Qualification (EQ) program and is required to meet the maximum temperature specified for the East Penetration Rooms for accident conditions. Per the ONS EQ Criteria Manual, the maximum temperature for the East Penetration Rooms is 145 degrees F for accident conditions which bounds the 60 degrees C (140 degrees F) temperature specific for a LOOP event.

SAFETY ANALYSIS

The Applicable Safety Analyses section of the Bases for TS 3.4.9 states that the requirement for emergency power supplies is based on NUREG-0737. The intent is to allow maintaining the reactor coolant in a sub-cooled condition with natural circulation at hot, high pressure conditions for an undefined, but extended, time period after a LOOP. While a LOOP event is an initial condition or coincident event assumed in many accident analyses, maintaining hot, high pressure conditions over an extended time period is not evaluated as part of Updated Final Safety Analysis Report accident analyses. Although the pressurizer heaters are not specifically used in accident analyses, the need to maintain sub-cooling in the long term while in a LOOP condition is the reason for providing a TS LCO.

Duke Energy used a qualitative approach to determine the risk significance associated with having insufficient pressurizer heater capacity on Unit 1. A failure of the pressurizer heater groups after a Loss of Offsite Power (LOOP) due to elevated temperature in the East Penetration Room (EPR) may result in insufficient

NRC`

pressurizer heater capacity on Unit 1 but is not a significant safety concern in regards to core damage. For a LOOP event, emergency power would be available from Keowee to power the pressurizer heater groups in question until the supply breakers in the EPR trip open due to elevated temperature. Analysis demonstrates that it would take over 5 days to reach a temperature that would trip the supply breakers and it is probable that offsite power would be recovered before the pressurizer heaters are lost. If for some reason offsite power is not recovered before the supply breakers in the EPR trip open, and RCS subcooling was subsequently lost, emergency power is expected to be available through the Keowee underground line. Emergency power provides the capability to implement feed and bleed core cooling as directed in the Emergency Procedures.

Therefore, this event is considered to have a small risk impact and is of no significance to the health and safety of the public.

It should be noted that there is no safety significance associated with Unit 2 since it was determined that ambient heat losses for Unit 2 did not exceed the capacity of the heaters during the TS violation period.

ADDITIONAL INFORMATION

To determine if a recurring or similar event exists, a search of the site corrective action program database was conducted for a time period covering five years prior to the date of this event. Based on this search, no other events that are similar to the subject event were discovered. Therefore it is concluded that this event is not recurring.

Energy Industry Identification System (EIIS) codes are identified in the text within brackets [].

There were no releases of radioactive materials, radiation exposures or personnel injuries associated with this event.

This event is considered reportable under the Equipment Performance and Information Exchange (EPIX) program as noted in Failure Report No. 1168.